Forwards Tabulation of Number of Tubes Plugged in Each of Two SGs Inspected During Sixth Isi,Per Plant TS SR 4.4.5.5a. Sixth ISI Was Completed on 990420
ML20206J332
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/05/1999
From: Feigenbaum T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AR#95049578, NYN-99049, NUDOCS 9905120192
Download: ML20206J332 (3)


Text

S ._

,  ;,- T s

"*'% North Atlantic Energy Service Corporation 4 P o. na 3*

North.

Atlantic Seabrook, Nil 03874

$$ <6o3,474.,s2i The Northeast Utilities System May 5,1999 Docket No. 50-443 NYN-99049 AR#95049578 United States Nuclear Regulatory Commission l

Attn.: . Document Control Desk '

Washington,DC 20555 l

- Seabrook Station Steam Generator Tubes Plugged During Sixth Inservice Inspection l

North Atlantic Energy Service Corporation ' North

( Atlantic) has . enclosed, pursuant to Seabrook

- Station Technical Specification Surveillance Requirement 4.4.5.5a, a tabulation of the number of.

tubes plugged in each of two steam generators ("A" and "D") inspected during the sixth inservice i inspection.1The sixth inservice inspection was completed on April 20,1999.

The complete results of the sixth inservice inspection for steam generators "A" and "D" will be submitted prior to April 20,2000, pursuant to Technical Specification Surveillance Requirement 4.4.5.5b.

Should you have any questions regarding this information, please contact Mr. James M. Peschel, Regulatory Compliance Manager, at (603) 773-7194. -

Very truly yours,

. NORTH ATLANTIC ENERGY SERVICE CORP.

\

b d4A Ted C. Feigenbau(

Executive Vice President and ChiefNuclear Officer y0018. ok7 cc: H. J. Miller, Regional Administrator J.T. Harrison, NRC Project Manager, Project Directorate 1-2

. R.- K. Lorson, NRC Senior Resident Inspector 9905120192 990505 PDR ADOCK OS000443^

e- PDv4 _ _

7 .

4 e 1 s s.

l l

ENCLOSURE 1 TO NYN-99049 e

i

.7.

Seabrook Station Steam Generator Tubes Plugged During Sixth Inservice Inspection S/G Row Column Indication Location Comment A 45 54 41 % AV5 AVB Wear A 36 61 39% AV3 Preventively Plugged

.A 47 68 39% AV3 Preventively Plugged A 49 69 47% AV3 AVB Wear A 49 93 40% AV5 AVB Wear D 28 8 40% AV6 AVB Wear D 47 26 43 % AV4 AVB Wear D 52 37 48% AV4 AVB Wear D 41 45 40 % AV5 AVB Wear D 47 47 42 % AV4 AVB Wear D 47 48 38% AV3 Preventively Plugged D 40 54 48% AV5 AVB Wear D 46 56 37% AVI Preventively Plugged D 52 57 38 % AV4 Preventively Plugged D 49 58 38 % A,V2 Preventively Plugged D 46 59 46% AV4 AVB Wear D 49 68 46% AV4 AVB Wear D 37 70 45 % AV3 AVB Wear

D 49 70 42 % AV2 AVB Wear D 40 75 45 % AV3 AVB Wear D 40 76 55 % AV3 AVB Wear D 42 76 50% AV5 AVB Wear D 47 76 71 % AV4 AVB Wear D 46 78 44 % AV5 AVB Wear D 49 85 63 % AV3 AVB Wear l

, ____2