Forwards Insp Rept 50-443/98-11 on 981228-990207.No Violations Noted.Inspectors Identified Several C/A Program Deficiencies Involving Timeliness of Reviews & Effectiveness of Previous C/As
ML20207C299
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 02/26/1999
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Feigenbaum T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
Shared Package
ML20207C304 List:
References
50-443-98-11, NUDOCS 9903080441
Download: ML20207C299 (3)


See also: IR 05000443/1998011

Text

--

-

-,

,e .,

February 26, 1999

I

Mr. T. C. Feigenbaum

Executive Vice President and Chief Nuclear Officer i

I

Seabrook Station

North Atlantic Energy Service Corporation

c/o Mr. Terry L. Harpster

P. O. Box 300

Seabrook, NH 03874

SUBJECT: NRC INTEGRATED INSPECTION REPORT NO. 50-443/9811

Dear Mr. Feigenbaum:

This refers to the inspection completed on February 7,1998 at the Seabrook Nuclear Power

Station. The enclosed report presents the results of this inspection. l

l

The plant was operated safely during the period. The operators performed routine activities l

Including surveillance testing well. Engineering personnel properly reviewed several technical

issues on safety-related equipment. The security program was inspected during this period, and i

the inspector determined that you are implementing a security program that effectively protects

against acts of radiological sabotage.

In contrast to the otherwise good performance, the inspectors identified several corrective action

program deficiencies. These issues involved the timeliness of reviews, the effectiveness of

previous corrective actions. Although none of the individual findings resulted in a plant safety

problem, they indicate a need to maintain focus on the corrective action program.

In accordance with 10 CFR 2.790 of the NRC " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,

Original Signed by:

Clifford Anderson, Chief

Projects Branch 5 j

Division of Reactor Projects

Docket No. 50-443

License No: NPF-86 (

Enclosure: NRC Inspection Report No. 50-443/98-10

4

9903080441 990226

PDR ADOCK 05000443

e PDR

OFFICIAL. RECORD. COPY IE:01

- _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ =

-

. . - - . - . .

. - - -. - ..

Ii. .

.A

l

!

!

Ted C. Feigenbaum 2

e

cc w/ encl:

'

B. D. Kenyon, President - Nuclear Group . l

J. S. Streeter, Recovery Officer - Nuclear Oversight

W. A. DiProfio, Station Director - Seabrook Station .

R. E. Hickok, Nuclear Training Manager - Seabrook Station

D. E. Carriere, Director, Production Services ,

L. M. Cuoco, Senior Nuclear Counsel  ;

W. Fogg, Director, New Hampshire Office of Emergency Mar ~Jement  !

D. McElhinney, RAC Chairman, FEMA Rl, Boston, Mass .  :

R. Backus, Esquire, Backus, Meyer and Solomon, New Hampsnire

'

D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency

Management Agency .

F. W. Getman, Jr.= Vice President and General Counsel- Great Bay Power Corporation

,

i

R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts ,

'

Seacoast Anti-Pollution League

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire

. S. Comley, Executive Director, We the People of the United States

-

W. Meinert, Nuclear Engineer

!

b

I

,

.

!

!

I

i

l

l

!

,

I

h

i

,

f

,

l

t

,j

[

i ,

Ted C. Feigenbaum 3

Distribution w/ encl:

Region l Docket Room (with concurrences) -

PUBLIC

Nuclear Safety information Center (NSIC)

NRC Resident inspector

H. Miller, RA/J. Wiggins, DRA

C. Anderson, DRP

R. Summers, DRP

S. Barr, DRP

R. Junod, DRP

Distribution w/enci(VIA E-MAIL):

J. Mitchell, OEDO

E. Adensam, PD l-3, NRR

J. Harrison, PD l-3, NRR

R. Correia, NRR (RPC)

D. Screnci, PAO, ORA

Inspection Program Branch, NRR (IPAS)

DOCDESK

.

5

9

(

DOCUMENT NAME: G:\ BRANCH 5\ SEA 9811.WPD

To receive a copy of this document, Indicate in the box: "C" = Copy without

attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy

, OFFICE Rl/DRP , l Rl/DRP l

NAME RLorson ChG CAnderson (/4'

7.(

'

DATE 02/26/99 02//Z/99

-

OFFICIAL RECORD COPY