ML20149E461

From kanterella
Revision as of 22:29, 26 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-321/87-33 & 50-366/87-33 on 871121-1218.No Violations or Deviations Noted
ML20149E461
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 01/15/1988
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20149E464 List:
References
NUDOCS 8802110058
Download: ML20149E461 (2)


See also: IR 05000321/1987033

Text

,

'

.

.

JaH l o goo

Docket Nos. 50-321, 50-366

License Nos. OPR-57, NPF-5

,

Georgia

ATTN: Mr.Power Company'Reilly

James P. O

Senior Vice President-

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-321/87-33 AND 50-366/87-33

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

P. Holmes-Ray, J. Menning and A. Gooden on November 21 - December 18, 1987.

The inspection included a review of activities authorized for your Hatch

facility. At the conclusion of the inspection, the findings were discussed

with those members of your staff identified in the enclosed inspection report. i

Areas examined during the inspection are identified in the report. Within  :

these areas, the inspection consisted of selective examinations of procedures  ;

and presentative records, interviews with personnel, and observation of

activities in progress. ,

Within the scope of the inspection, no violations or deviations were  !

identified.  ;

In accordance with Section 2.790 of tr.e NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure .

will be placed in the NRC Public Document Room, j

Should you have any questions concerning this letter, please contact us.

Sincerely,

CRIGINM. S!G!!ED DY

WG'. l.. DE'?iNLEE

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

DivisionofReactorProjects

Enclosure:

NRC Inspection Report

cc w/ enc 1: (See page 2)

8802110058 880115

DR ADOCK 050 1

g g

.rfoI

-

- .

Georgia Power Company 2

,

-

JAN 151988

cc w/ enc 1:

J. T. Beckham. Vice President, Plant Hatch

H. C. Nix, Pla9. Manager

0. M. Fraser, Eite Quality Assurance (QA)

Supervisor

L. Gucwa, Managir, Nuclear Safety

and Licensing

E. Baker, NRR

J. T. Conway, Nl:R

J. Blake, RII

bec w/ enc 1:

NRC Resident Inspector

DRS Technical Assistant

Hugh S. Jordan, Executive Secretary

Document Control Desk

State of Georgia

i

i

l

R RII

b h l

P almain:er MSinkule '

f D.9

f \fPP

!

l