ML20151C118

From kanterella
Revision as of 16:25, 25 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-416/88-03 on 880220-0318 & Notice of Violation
ML20151C118
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/05/1988
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kingsley O
SYSTEM ENERGY RESOURCES, INC.
Shared Package
ML20151C122 List:
References
NUDOCS 8804120163
Download: ML20151C118 (2)


See also: IR 05000416/1988003

Text

. ..._ _. . _ _ _

. s .

.

  • '

- <

, ,,

APR 0 5 1988

Docket No. 50-416

License No. NPF-29

System Energy Resources, Inc.

ATTN: Mr. O. D. Kingsley, Jr.

Vice President, Nuclear Operations

P. O. Box 23054

Jackson, MS 39205

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-416/88-03)

,

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted

by R. C. Butcher on February 20 - March 18, 1988. The inspection included

a review of activities authorized for your Grand Gulf facility. At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures ,

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. The violation, references to pertinent requirements, and

elements to be included in your response are described in the enclosed Notice

of Violation.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

I

hhk DO h6 \\\

Q \ i

33

60I j

.

-

,

.

.. ,

APR 0 5 1%S

System Energy Resources, Inc. 2

APR 05 m*

Should you have any questions concerning this letter, please contact us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosures:

1. Notice of Violatien

2. NRC Inspection Report

cc w/encls:

T. H. Cloninger, Vice President, Nuclear

Engineering and Support

J. E. Cross, GGNS Site Director

C. R. Hutchinson, GGNS General Manager

J. G. On;:re, Director, Nuclear Licensing

R. T. Lally, Manager of Quality Assurance

Middle South Services, Inc.

R. B. McGehee, Esquire

Wise, Carter, Child, Steen and Caraway

N. S. Reynolds, Esquire

Bishop, Cook, Purcell & Reynolds

R. W. Jackson, Project Engineer

bec w/encls:

NRC Resident Inspector

DRS Technical Assistant

L. Kintner, NRR

Document Control Desk

State of Mississippi

RI y ,[,97 RII

HDance:er LH e d t->s DVerpelli

/ /88 4/r/W 0(/ 3 /88

\