Forwards Request for Addl Info Re Util 860506 Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Info Requested within 1 Month of Ltr Date
ML20154E682
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 05/11/1988
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Heins G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
IEB-85-003, IEB-85-3, NUDOCS 8805200289
Download: ML20154E682 (4)


Text

  • U S80 3 UNITED STATES 9

. $4, NUCLEAR REGULATORY COMMisslON

,q  % REClON W

$ %f

. O ctew tu.vn, stusois soin

.MAY 11 888 f>Rket No. 50-155 Consumers Power Company ATTN: Gordon t.. Heins Senior Vice President Energy Supply 212 West Michigan Avenue Jackson, MI 49201 Gentlemen:

Consumers Power Company's letter of May 6, 1986, perta' W

  • Big Rock Point, .

contained your response to IEB 85-03, "Motor-0perated , t,ommon Mode Failures During Plant Transients Due to Improper Switch Settings . Our review of the responses indicates the need for additional information before the program to assure valve operability can be approved. The specific infonnation necessary for the completion of our review is enclosed. Additional information is requested within one month of the date of this letter.

The written report shall be submitted to the Regional Administrator, Region III, under oath of affirmation und'er provisions of Section 182a, Atomic ,

Energy Act of 1954, as amended. Also, the original copy of the cover letter and a copy of the report shall be transmitted to the U.S. Nuclear Regulatory Commission Document Control Desk, Washington, DC 20555 for reproduction and distribution.

Questions addressing this issue may be forwarded to Richard J. Kiessel, NRR (301)492-1154.

Sincerely, f& k. k = : -

Edward G. Greenman, Director  !

Division of Reactor Projects

Enclosure:

Request for Additional Information l See Attached Distribution 1

f 8805200289 880511 [  ;

PDR ADOCK 05000155 ) 1 o ncn

Consumers Power Company 2 gggyg gggg Distribution cc w/ enclosure:

Mr. Kenneth W. Berry, Director Nuclear Licensing Thomas W. Elward, Plant

.., Manager. ,. ,rc 20CD/DCS;(RIOS)2#

"Licensing Fee Management Branch Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission Michigan Department of Public Health R. J. Kiessel, NRR T. R. Quay, NRR i

s 1

'.i.-

. . Pcge 1 of 2 f . REQUEST FOR ADDITIONAL INFORMATION

~

Review of Responses to Action Item e of IE Bulletin 85-03 Licensee: Unit (s): Big Rock Point 1 Date of Response 05-06-86 Consumers Power Company 1945 West Parnell Road Respondent:

Jackson, Michigan 49201 Kenneth W. Berry, Director Nuclear Licensing The response of 05-06-86 indicates that IEB 85-03 does not apply to Big Rock Point 1. The reason given is that "high differential pressures do not occur across safety-related motor-operated valves as discussed in the bulletin . "

NRC Inspection Report 87-22 (11-25-87) provides a review of the utility response dated 05-06-86 and of the plant's Post Accident System (Core Spray), in Section 2 on the subject of IEB 85-03 fo11ovup. The inspectors remark that "two MOVs (MO-7061 and M0-7071) may be required to open against full reactor pressure trapped between these and two upstream check valves when the reactor coolant system is depressurized after an accident." The inspectors not apply.

question the licensee's position that IEB 85-03 does Letters dated 12-28-87 and 02-01-88 are addressed to the Nuclear Regulatory Commission Document Control Desk in Washington by Ralph R. Frisch (Consumers Power), in reply to Inspection Report 87-22 mentioned above. Revision of Test Procedure T 30-22 and the need for additional action are mentioned. IEB 85-03 is not mentioned in these letters.

In view of additional information provided in Inspection Report 87-22 and the utility responses of 12-28-87 and 02-01-88, the present position of the NRC is that the requirements of IEB 85-03 apply to Big Rock Point 1.

Therefore, the information provided in your response to Action Item e of IE Bulletin 85-03 was found to be deficient in some areas. Provide the additional information necessary to resolve the following comments and questions:

1. Describe the additional actions needed to revise Test Procedure T 30-22 (see the response of 02-01-88).

Pago 2 ef 2 RAI for Big Rcek Point 1

2. In addition to MO-7070 and MOV-7071, which are identified in the response of 02-01-88 to the inspection report, include at least the following motor-operated valves in your r'esponse to IEB 85-03, or justify their exclusion:

M0-7051 MO-7066 MO-7071 MO-7061 M0-7060 MO-7072 MO-7064 MO-7070 MO-7080 Our reference is Drawing 0740G40123, Sheet 2, Revision G (12-18-86), which may have been updated.

3. Provide e, scheduled date for submittal of a final report, in response to Action Item f of IEB 85-03.