ML20217G411
| ML20217G411 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 10/12/1999 |
| From: | Powers K CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9910210281 | |
| Download: ML20217G411 (1) | |
Text
.-
ConsumersEnergy A CMS Energy Company Big Rock Point Restoration Project M P. Powers 10269 US.31 North Site General Afanager Chartent, MI 49720 October 12, 1999 Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 DOCKET NUMBER 50-155, LICENSE DPR-6, BIG ROCK POINT PLANT -
DEFUELED EMERGENCY PLAN REVISION IN ACCORDANCE WITH 10 CFR 50.54(q).
In accordance with 10 CFR 50.54(q), nuclear power reactor licensees may make changes to emergency plans without Commission approval only if the changes do not decrease the effectiveness of the plan, and the plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to this part.
Section 1.1.1, Training of Plant Personnel, has been revised to clarify time requirements and the types of training that are acceptable. Section 1.1.1 now reads as follows:
" Plant personnel assigned emergency responsibilities will receive training every 12 months, +25%, in accordance with plant procedures. Training for these individuals may be obtained through classroom training, self study, problem sets, drill participation, exercise participation or other alternative training".
In addition to Section 1.1.1, the Letters of Agreement were updated. This routine activity resulted in the removal of one Letter of Agreement with the Boyne City Decontamination Facility which is no longer required as a result an exemption to the emergency plan granted by the Nuclear Regulatory Conunission by letter dated September 30,1998.
The plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements A
i E to this part.
ennneth P Powers Site General Manager f{ f> ~ J D
cc:
Administrator, Region III, USNRC NRC Reactor Decommissioning Inspector - Big Rock Point Plant NRR Project Manager - USNRC 9910210281 991012 PDR ADOCK 05000155 g
PDR 1a-