ML20245G513
| ML20245G513 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 08/10/1989 |
| From: | Pulsifer R Office of Nuclear Reactor Regulation |
| To: | Berry K CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20245G518 | List: |
| References | |
| GL-83-28, TAC-53963, NUDOCS 8908160053 | |
| Download: ML20245G513 (4) | |
Text
- - _ _
\\
- f., " ~ Docket No. 50-155 DISTRIBUTION iDocketli)e BGrimes NRC & Local PDR TMeek (4)
Mr. Kenneth W. Berry MVirgilio Wanda Jones Director, Nuclear Licensing PShuttleworth EButcher' i
Consumers Power Company RPulsifer ACRS (10) 1 1945 West Parnall Road OGC PD31PlantFilf Jackson, Michigan 49201 DHagan EJordan ARM /LFMB GPA/PA
Dear Mr. Berry:
SUBJECT:
SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEM 4.5.3, REACTOR TRIP RELIABILITY ON-LINE FUNCTIONAL TESTING 0F THE REACTOR TRIP SYSTEM (TAC NO. 53963)
Generic Letter 83-28 Item 4.5.3, required confirmation from all licensees and applicants that on-line functional testing of the reactor trip system, including independent testing of the diverse trip feature, was being performed.
By letters dated September 6, 1983, November 7, 1983 and June 1, 1984 you submitted responses to Generic Letter 83-28, Item 4.5.3.
Therein you indicated that the reactor trip system was reviewed as part of the Systematic Evaluation Program (SEP), specifically SEP Topic VI-10.A.
Your submittal dated March 29, 1982, describes in detail the Reactor Protection System (RPS), RPS Components, RPS Trip Function Description based on inputs from the RPS sensors, and the test program which is performed during refueling and at power operation. We conclude that the existing intervals for on-line functional testing at Big Rock Point are consistent with achieving high reactor trip system availability.
The enclosed safety evaluation provides the details and basis for our conclusion.
Therefore, we consider Generic Letter 83-28, Item 4.5.3 to be complete.
This completes all staff activities related to TAC No. 53963.
Sincerely,
'sfj%8tw Robert M. Pulsifer, Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V
& Special Projects Office of Nuclear Reactor Regulation
Enclosures:
As stated cc w/ enclosures:
See next page
[ BIG ROCK POINT SE]
Of0f
- SEE PREVIOUS CONCURRENCE L$ $ l05 I \\
S&Q(RPulsifer:jw J M:PD31:DRSP r ()
NRR:SICB (A)D: PD$1: DRSP
< /' 8/(()'/89
- SNewberry LYande1 6 a
7/19/89 8/b/89
/
' g//d 8908160053 890810 7
PDR ADOCK 05000155
_ _ _ _ _ _ _ _ _ _ _ _ _ _ -__ P_
W f*
' Dodet No. 50-155 DISTRIBUTION Docket File BGrimes l-NRC & Local PDR TMeek (4)
Mr. Kenneth W. - Berry MVirgilio Wanda Jones Director, Nuclear Licensing PShuttleworth EButcher-LL Consumers Power Company RPulsifer ACRS (10)
.1945 West Parnall Road OGC PD31 Plant Fi l
Jackson, Michigan 49201 DHagan EJordan ARM /LFMB GPA/PA
SUBJECT:
-SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEM 4.5.3, REACTOR TRIP RELIABILITY ON-LINE FUNCTIONAL TESTING 0F THE REACTOR TRIP SYSTEM (TAC NO. 53963)
Generic Letter 83-28 Item 4.5.3, required confirmation from all licensees and applicants that on-line functional testing of the reactor trip system, including independent testing of the diverse trip feature, was being performed.
By letters dated September.6, 1983, November 7, 1983 and June 1, 1984 you submitted responses to Generic Letter 83-28, Item 4.5.3.
Therein you indicated that the reactor trip system was reviewed as part of the Systematic Evaluation Program (SEP), specifically SEP Topic VI-10.A.
Your submittal dated March 29, 1982, describes in detail the Reactor Protection System (RPS), RPS Components, RPS Trip Function Description based on inputs from the RPS sensors, and the test-program which is performed during refueling and at power operation. We conclude that the existing intervals for on-line functional testing at Big Rock Point are consistent with schieving high reactor trip system availability.
The enclosed safety evaluation provides the details and basis for our conclusion.
Therefore, we consider Generic Letter 83-28, Item 4.5.3 to be complete.
This completes all staff activities related to TAC No. 53963.
Sincerely, y, W y;-
Robert M. Pulsifer, Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V
& Special Projects Office of Nuclear Reactor Regulation
Enclosures:
As stated cc w/ enclosures:
See next page
[ BIG ROCK POINT SE]
- SEE PREVIOUS CONCURRENCE gM4 M:PD31:DRSP r,
NRR:SICB (A)D:PD 1:DRSP Pulsifer:jw (
- SNewberry LYandel v
g/
< Y 8/g*/89 7/19/89 8/b/89 di'rq
[
k PJ
- o UNITED STATES
- P
' ~
NUCLEAR REGULATORY COMMISSION n
h' WASHINGTON, D. C. 20555 La August 10, 1989 Docket No; 50-155 Mr. Kenneth W. Berry Director, Nuclear Licensing Consumers Power Company
-1945 West Parnall Road Jackson, Michigan '49201 1
Dear.Mr. Berry:
SUBJECT:
SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEM 4.5.3, REACTOR TRIP RELIABILITY ON-LINE FUNCTIONAL TESTING 0F THE REACTOR TRIP SYSTEM (TAC NO. 53963)
'{
Generic Letter 83-28 Item 4.5.3, required confirmation from all licensees and applicants that on-line functional testing of the reactor trip system, including independent testing of the diverse trip feature,.was being performed.
By letters dated September 6, 1983, November 7, 1983 and June 1, 1984 you submitted-responses to Generic Letter 83-28,-Item 4.5.3.
Therein you indicated that the' reactor trip system was reviewed as part of the Systematic Evaluation Program (SEP),~specifically SEP Topic VI-10.A.
Your submittal dated March 29,-
1982, describes in detail the Reactor Protection System (RPS), RPS Components, RPS Trip Function Description based on inputs from the RPS sensors, and the test program which is performed during refueling and at power operation.
We conclude that the existing intervals for on-line functional testing at Big Rock Point are consistent with achieving high reactor trip system availability.
The enclosed safety evaluation provides the details and basis for our
. conclusion.
Therefore, we consider Generic Letter 83-28, Item 4.5.3 to be complete.
This completes all staff activities related to TAC No. 53963.
Sincerely, r
obert M. Pulsifer, roject Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V
& Special Projects Office of Nuclear Reactor Regulation
Enclosures:
As stated l
cc w/ enclosures:
See next page L
L Mr. Kenneth W. Berry-
' Consumers Power Company Big Rock Point Plant r
1
.CC: z Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L Bacon, Esquire
~
Consumers Power Company 212 West Michigan Avenue Jackson, Michigan '49201 Mr. Thomas W. Elward i
Plant' Manager-Big Rock Point Plant i
10269 U.S. 31 North
.Charlevoix, Michigan 49720 Jane E. Brannon. County Clerk County Building Charlevoix, Michigan 49720 Office of'the Governor Room 1 - Capitol Building-Lansing, Michigan 48913 Regional Administrator, Region III U.S. Nuclear. Regulatory Commission
'799 Roosevelt Road Glen Ellyn, Illinois 60137 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. 0. Box 30035 Lansing, Michigan. 48909 i
U.S. Nuclear Regulatory Commission Resident Inspector Office Big Rock Point Plant 10253 U.S. 31 North Charlevoix, Michigan 49720 i
i 1
_ _ _ _.