ML20245H823

From kanterella
Jump to navigation Jump to search

Forwards Amend 98 to License DPR-06 & Safety Evaluation. Amend Requires Compliance W/Amended Physical Security Plan
ML20245H823
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 07/28/1989
From: Pulsifer R
Office of Nuclear Reactor Regulation
To: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20245H826 List:
References
TAC-66989, NUDOCS 8908170299
Download: ML20245H823 (5)


Text

_ _ _ _ - _ _ _ _ - _ - - - - _ _ _ - _ - - - - -

.I

[yag'o

,g UNITED STATES g

NUCLEAR REGULATORY COMMISSION 5,

j W ASHINGToN, D. C. 20S55 July 28, 1989 Docket No. 50-155 Mr. Kenneth W. Berry Director, Nuclear Licensing Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201

Dear Mr. Berry:

SUBJECT:

AMENDMENT NO. 98 TO FACILITY OPERATING LICENSE NO. DPR-6:

(TAC NO. 66989) 1he Commission has issued the enclosed Amendment No. 98 to Facility Operating License No. DPR-6 for the Big Rock Point Plant, in response to your application dated February 6, 1987 and supplemented by letter dated November 2, 1987.

This amendment modifies paragraph 2.C.(5) of the license to require compliance with the amended Physical Security Plan.

This Plan was amended to conform to the requirements ot' 10 CFR 73.55.

Consistent with the provisions of 10 CFR 73.55, search requirements must be implemented within 60 days and miscellaneous amendments within 180 days from the effective date of this amendment.

Our evaluation of the amendment of wer Physical Security Plan for the Big Rock Point Plant is contained in the enclosed Safeguards Evaluation Report.

Based on this evaluation, we find that you meet the requirements of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 and the recordkeeping requirements of 10 CFR 73.70.

i We find this amendment to your license is related solely to safeguards matters and does not involve any significant construction impacts.

Accordingly, this amendment meets the eligibility criteria for categorical exclusion set forth in l

10 CFR 51.22(c)(12).

Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment.

Based on the fact that this license amendment applies to the Physical Security Plan and incorporates into the license the latest requirements of your updated Physical Security Plan, we have concluded that there is reasonable assurance that the health and safety of the public will not be endangered by this action and that this action will be conducted in compliance with the Commission's regulations, and the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.

8908170299 890729 DR ADOCK 0500 W

Your Physical Security Plan consists of Safeguards Information required to be protected from unauthorized disclosure in accordance with the provisions of 10 CFR 73.21.

A Notice of Issuance will be included in the Commission's next bi-weekly Federal Reoister notice Sincerely,

/S/

Robert M. Pulsifer, Project Manager Project Directorate III-1 Division of Reactor Projet.ts - JII, IV, V h

& Special Projects Office of Nuclear Reactor Regulation

Enclosures:

1.

Amendment No. 98 to DPR-6 2.

Safety Evaluation cc w/ enclosures See next page DISTRIBUTION DOCKET FILE PSHUTTLEWORTH NRC & LOCAL PDRs LYANDELL PD31 GRAY FILE DHAGAN MVIRGILIO JCALVO RPULSIFER WANDA JONES OGC GPA/PA EJORDAN ARM /LFMB BGRIMES TMEEK(4)

ACRS(10)

RFSKELTON d

LA/PD31:DRSPj'@'

PM/PD31:DR,5f)

NRR/RS (A)D/PDf1:DRSP 3GC PSHUTTLEWORTH RPULSIFER/~/

RFSKEL LYANDEL C M,eand 7/f[/89 7/)/S9 7/JW89 7/g)/E9

  • 7/p//89 f

t!

i

Your Physical Security Plaa consists of Safeguards Information required to be protected from unauthorized disclosure in accordance with the provisions of 10 CFR 73.21.

A Notice of Issuance will be included in the Commission's next bi-weekly Federal Register notice Sincerely, U-Q.'

Robert M. Pulsifer, Project Manage 1 Project Directorate III-1 Division of Reactor Projects - III, IV, V

& Special Projects s

Office of Nuclear Reactor Regulation

Enclosures:

1.

Amendment No. 98 to DPR-6 2.

Safety Evaluation cc w/ enclosures See next page I

Mr. Kenneth W. Berry Consumers Power Company Big Rock Point Plant CC:

Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Mr. Thomas W. Elward Plant Manager Big Rock Point Plant 10269 U.S. 31 North Charlevoix, Michigan 49720 Mr. Bud Heeres County Commissioner 303 Sheridan Charlevoix, Michigan 49720 Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 U.S. Nuclear Regulatory Commission Resident Inspector Office 1

Big Rock Point Plant 10253 U.S. 31 North Charlevoix, Michigan 49720 i