i May 28,.1998 Doris SchallerVemon Secretary Don't Waste Michigan - Northem Chapter 1028 Hoffman Street Petoskey, MI 49770 "A
Dear Ms.Vemon:
. This is in response to your letter dated May 11,1998, to Mr. Paul Harris, the NRC Licensing Project Manager for the Big Rock Point project.' Your letter requested that NRC retain a resident inspector at the Big Rock site to monitor the project for a period of five years.
The Region ill Division of Nuclear Materials Safety, which I head, is responsible for the inspection of this project As your letter indicated, we announced at the public meeting on i
November 13,1997, that we intended to assign an inspector to the site for about a year.
~
= The inspection program for reactor decommissioning projects is govemed by NRC Inspection Manual Chapter MC 2561, which provides flexibility regarding assignment of an inspector to a given project site. Various factors are considered, including the level of activities at the site, quality of licensee performance, availability of staff, proximity to the Regional inspection office, and others.
Because these factors can change, we are not prepared to make a five-year commitment regarding a site assignment. However, we continuously evaluate staffing factors, and may extend the period that we will retain an inspector at this particular site should circumstances warrant.
1 We appreciate your interest in these matters. You may contact Bruce Jorgensen, Chief of the I
i Decommissioning Branch, at (630) 829-9615 at any time conceming inspection of the Big Rock Point project.
Sincerely,
/s/ C. D. Pederson i
O Cynthia D. Pederson, Director 9806040204 980528 4_
Division of Nuclear Materials Safety I
l POR ADOCK 05000155 I
W PDR E
i
. DOCUMENT NAME: G:\\SEC\\AIT_M984.081
'See Previous Cor.currences To recohe t copy of this document, indicate in the box: "C" = Copy w/o attaWenci *E*A w/attaWenci"N* = No copy OFFICE Rlli:DNMS l
HQ:NRR l
Rill:DNN91 l
l NAME-
- Jorgensen/kje
' Roe (via e-mail)
Pedersod DATE 05/ /98 05/28/98 05/3 998 l-OFFICIAL RECORD COPY i
J
4 Doris Schaller Vernon Secretary Don't Waste Michigan - Northern Chapter 1028 Hoffman Street Petoskey, MI 49770
Dear Ms. Vernon:
This is in response to your letter dated May 11,1998, to Mr. Paul Harris, the NRC Licensing Project Manager for the Big Rock Point project. Your letter requested that NRC retain a resident inspector at the Big Rock site to monitor the project for a period of five years.
The Region lil Division of Nuclear Materials Safety, which I head, is responsible for the inspection of this project. As your letter indicated, we announced at the public meeting on November 13,1997, that we intended to assign an inspector to the site for about a year.
The inspection program for reactor decommissioning projects is govemed by NRC Inspection Manual Chapter MC 2561, which provides flexibility regarding assignment of an inspector to a given project site. Various factors are considered, including the level of activities at the site, quality of licensee performance, availability of staff, proximity to the Regional inspection office, and others.
Because these factors can change, we are not prepared to make a five-year commitment regarding a site assignment. However, we continuously evaluate staffing factors, and we are considering extending the period that we will retain an inspector at this particular site. A decision on a possible extension will likely be made within the next two months.
We appreciate your interest in these matters. You may contact Bruce Jorgensen, Chief of the Decommissioning Branch, at (630) 829-9615 at any time conceming inspection of the Big Rock Point project.
Sincerely, Cynthia D. Pederson, Director Division of Nuclear Materials Safety DOCUMENT NAME: G:\\SEC\\AIT_M984.081 To receive a copy of this document, indicate in the box: "C" = Copy w/o attach /end "E" = Copy w/ attach /end *N*
- No copy OFFICE-Rill:DNNIJijV) l (-
HQ:NRR l
Rill:DNMS l
l NAME Jorgens#kje Roe (via e-mail)
Pederson DATE 05/28/984 05/28/98 05/ /98 OFFICIAL RECORD COPY
.. ~
f' D. Vemon Distnbu
/
I
' PUBLIC IE 2
P. Harris, RR.
S. Weiss, NRR C. J. Paperiello, Rlli J. L. Caldwell, Rlli C. D. Pederson, Rlli J. Strasma, Rlll A. Greenman, Rill SRI, Big Rock I.'${lIj3'y