ML20154M538

From kanterella
Jump to navigation Jump to search
Forwards Supplement to Plant Defueled TS & Bases, Incorporating Licensee Response to NRC 980416 RAI & Clarifying Listed Items
ML20154M538
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 10/14/1998
From: Powers K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20154M541 List:
References
NUDOCS 9810200325
Download: ML20154M538 (3)


Text

---

i A CMS Energy CanpanY Big Rock Point Nuclear Plant K m P,Puners 10269 L&31 Norm Site General Manager Charlevoix, MI 49720 October 14,1998 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 - 0001 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - SUPPLEMENT: BIG ROCK POINT NUCLEAR PLANT DEFUELED TECHNICAL SPECIFICATIONS AND BASES.

I Find attached to this letter a supplement to the Big Rock Point Defueled Technical Specifications and Bases that were first submitted to the Nuclear Regulatory Commission on September 19, I

1997. This supplement incorporates Consumers Energy's response to a NRC Request for Additional Information dated April 16,1998. Also, based cn discussions with the Staff during their review of the Defueled Technical Specifications, the following clarifications (shown in bold Italles ) have been incorporated:

6.4 TRAINING

((

A training program for the facility's CERTIFIED FUEL HANDLERS shall meet the requirements and recommendations of Section 5.5 of ANSI N18.1-1971. The Site General Manager has overall responsibilityfor implementation and maintenance of

'f-the trainingprogram.

I l

6.2.2 FACILITY ORGANIZATION During operations without FUEL HANDLING either the SHIFT Supervisor or the l

c.

Non-Certified Operator shall be qualified in radiation protection procedures; or a Radiation Protection Technician shall be on site. During FUEL HANDLING operations a qualified Radiation Protection Technician shall be on site.

i 9810200325 981014 l

PDR ADOCK 05000155 N

PDR I

l l

t

BIG ROCK POINT PLANT - SUPPLEMENT: BIG ROCK POINT NUCLEAR PLANT DEFUELED TECIINICAL SPECIFICATIONS AND BASES.

TABLE 6.2-1: MINIMUM SHIFT CREW COMPOSITION l

DURING PERMANENTLY DEFUELED CONDITION STAFFING FOR STAFFING POSITION OPERATIONS DURING FUEL WITHOUT HANDLING FUEL HANDLING OPERATIONS SHIFT Supervisor (CERTIFIED FUEL HANDLER) 1 1

/

Non-Certified Operator 1

1 CERTIFIED FUEL HANDLER 1

Radiation Protection Technician l'

1 If Shin Supenisor or Non-Certined Operator are not certined in Radiation Protection Procedures If there are any further questions with regard to this submittal, please contact Michael Bourassa, Licensing Supervisor (616-547-8244).

\\

William J l nibilowicz Acting Site General Manager C:

Administrator, Region III - USNRC NRC Decommissioning Inspector - Big Rock Point NRR Project Manager - OWFN, USNRC l

t

l l

l l

l CONSUMERS ENERGY COMPANY Big Rock Pomt Plant Docket 50-155 License DPR-06 SUPPLEMENT: BIG ROCK POINT NUCL, EAR PL. ANT DEFUELED TECIINICAL SPECIFICATIONS AND BASES.

At the request of the Commission and pursuant to the Atomic Energy Act of 1954 and the Energy Reorganization Act of 1974, as amended, and the Commission's Rules and Regulations thereunder, Consumers Energy Company submits our response to NRC letter dated April 16, 1998, entitled," SUPPLEMENT: BIG ROCK POINT NUCLEAR PLANT DEFUELED TECIINICAL SPECIFICATIONS AND BASES."

CONSUMERS ENERGY COMPANY To the best of my knowledge, information and belief, the contents of this submittal are truthful and complete.

By William'J Trubilowicz '

Acting site General h ger Sworn and subscribed to before me this 14th day of October,1998.