Forwards Insp Rept 50-155/90-10 on 900723-27 & 0806-10 & Notice of Violation
ML20059N008
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 09/28/1990
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20059N011 List:
References
NUDOCS 9010090030
Download: ML20059N008 (4)


See also: IR 05000155/1990010

Text

w

<

,

$

>$

<

.

lp

.*

,

M 5,

'

s

,

SEP B 8 m3

,

[

4 3

[L '

-f'

f

Docket No. 50-155

b

Consumers Power Company

'!

ATTN:

r.r. David P. Hoffman

'

-Vice President

Nuclear Operations-

1945 West Parnall Road

4

Jackson, MI 49201

Gentlemen:

,

Yhis letter refers to the spcial maintenance team inspection conducted by

F

tir. H. A. Walker and others of this office on July 23 through 27, and August. 6

,

,

through 10, 1990. During this i..spection, we evaluated activities at the Big

Rock Point Nuclear Power Plant, authorized by NRC Operating License No. DPR-6.

We discussed our inspection findings with Mr. W. L. Beckman and others of your

staff on August 17, 1990.

'

The first week of the inspection was conducted during an unplanned outage for

s

repair of cooling system leaks and the second week was conducted during p12nt

'

power operations. The inspection was conducted to assess and eva'luate your

support to and implema tation of maintenance and engineering to assure that

plant structures, systems, and components reliably perform on demand. We

evaluated various activities to determine if maintenance and engineering were

accomplished, effective, and adequately assessed by your own quality

verification process.

s

The enclosed copy of our inspection report identifies specific areas examined

j

"

during the inspection.

Within these areas, we selectively examined procedures

and representative records, made observations, and interviews with your

personnel,

Overall, the inspection team concluded that implementation of the maintenance

r.

program at the Big Rock Point Nuclear Power Plant was satisfactory.

Section

3.0 of-the inspection report provides a synopsis of the effectiveness of your

maintenance program.-

The team identified strengths as well as weaknesses in implementation of the

'

maintenance programs. The most signifiont strengths were the long-term,

highly skilled, and dedicated employees wno were supported by a dedicated and

W

knowledgeable management staff and the close and effective coordination

4

between organizations in completing maintenance.

The material condition of

'

the' plant was good, and there was a very low backlog of equipment awaiting

,

repair. The most significant weaknesses were the lack of effective

engineering support in several' instances, untimely corrective action in the

areas of audit findings and controlling. limited life materials, and instances

where electrical components were not periodically tested because replacement

parts were not available.

In addition, the team noted some procedural and

'

9010090030 900928

PDR. ADOCK 05000153

(

,

'

.

.

, . ' . '

'

.

' Consumers Power Company.

2

EP 2 81990

maintenance trending weaknesses. These appeared to be less significant since,-

'for the most'part, these were compensated for by the experience-and' dedication

of selected individuals.

Consideration should.be given to providing

improvements in these areas to allow for possible personnel turnover.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice. A written response

is required.

In addition, an unresolved item is included on actions to be-

taken to resolve concerns on core spray valve 7071.

Please address this in

'

your response as well.

In accordance with 10 CFR 2.790 of the Commission's

regulations, a copy of this letter, the enclosures, and your response to this

letter will be placed in the NRC Public Document Room.

,

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

!

Sincerely,

ORIGINAL SIGNED BY HUBERI J. MILLER

Hubert J. Miller, Director

Division of Reactor Safety

'

Enclosures:

l.

1.

Notice of Violation

2. . Inspection Report

No. 50-155/90010(DRS)

3.

Appendix A - A on.yms

See Attached Distribution

1..

l

l-

l~

.i

RIII

RIII

RIII

RIII

RIII

RIII

RIII

(see p. wious concurrences)

,

Walker /lc Jablonski

DeFayette

Schumacher

Ring

Martin

1

'r

I

9/ /90

9/ /90

9/ /90

9/ /90

9/ /90 9/ /90

. 90

l

,

i

l

l

. -

-

- -

- -

- - .-

. .

.

--.

'

w

>

.

SEP B B 1990

. 4

Consun.ars Power Company

2

'

s

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified _in the enclosed Notice: A written response

_is required.- -In addition,= an unresolved-item is included on actions-to be

i

taken to resolve c.oncerns on core spray valve 7071.

Please address this in

+

your response as well.

In accordance with 10 CFR 2.790 of the Commission's

regulations, a copy of this letter, the enclosures, and your response to this

letter will be placed in.the NRC Public Document Room.

1

The responses directed by this letter and the accompanying Notice are not

subject _to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 90-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C

Hubert J. Miller, Director

Division of Reactor Safety

,

.

Enclosures:

'

1.

Notice of Violation

2.

Inspection Report

No. 50-155/90010(DRS)

3.

Appendix A - Acronyms

cc w/ enclosures:

'

Mr. Kenneth W. Berry, Director

Nuclear-Licensing-

William L. Beckman, Plant Manager

DCD/DCB (RIDS)

Licensing Fee Management Branch ~

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Michigan Department of Public Health

' ;

Armando Masciantonio, LPM, NRR

Commissioner Curtiss, OCM/JC

Tom Foley, NRR/LPEB

,

L

. Director / Division of Reactor

lf

'

Safety RI, RII, RIV, RV

-l

+

RI

RI

RI I

RI

g

RIII

RIII

, -

9a'lker/lc JabMnski

D Fqyette

Schumacher

R:.ig

M

in

Miller

i

?

-9/ f/90

9/gf/90

9/24 90

9/;,fe/90 ,j

9/2'7/90 9/t1/90

9/ /90

7

L &

g

It

3

a

'

. . .

,

- '

Ij

'

g_,

SEP 2 81990

~

consumers' Power Company.

3--

,

f

-i

Distrib'ution.

,

!

. cc w/ enclosures:

Mr.-Kenneth W . Berry, Director

,

Nuclear Licensing-

-

William L. Beckman: Plant Manager

'

DCD/DCB.(RIDS)

!!

!

Licensing Fee Management Branch

Resident:Inspectorr RIII

',

!

,

Ronald Callen, Michigan

Public Service Commission

!

Michigan Department of Public Health

l

-Armando Masciantonio, LPM, NRR

i

Commissioner Curtiss, OCM/JC

a

Tom Foley, NRR/LPEB

Director / Division of Reactor

Safety RI, RII, RIV, RV

l

..;

i

.

I

,

.;

e

,.

,.e

<1

,

t

-)

i

r

..-

<

,

'

.

1

--

-.

,