ML20236Y044

From kanterella
Jump to navigation Jump to search
Forwards Summary of Decommissioning Insp Plan Through March 1999.Plan Will Be Updated Approx Twice Each Yr & May Be Revised at Any Time Based on Future Insp Findings,Events & Resource Availability
ML20236Y044
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 08/05/1998
From: Jorgensen B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Powers K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 9808110113
Download: ML20236Y044 (5)


Text

L August 5, 1998 i

Mr. K. P. Powers Plant General Manager Big Rock Point Nuclear Plant Consumers Energy Company 10269 US 31 North Charlevoix, MI 49720

SUBJECT:

DECOMMISSIONING INSPECTION PLAN

Dear Mr. Powers:

Enclosed for your information is a summary of our decommissioning inspection plan through March 99. This plan will be updated approximately twice each year, and may be revised at any time based on future inspection findings, events, resource availability, etc. We will promptly inform you of any major changes to the enclosed inspection plan.

The plan provides for increased focus on the performance of the radiation protection program (RP). We will be closely monitoring your future programmatic assessments of the RP program and your progress in addressing issues which you or we have identified in the RP program.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, and the l

enclosure will be placed in the NRC Public Document Room. If you have any questions, please j

contact Dr. Ross Landsman at (630) 829-9609 or myself at (630) 829-9615.

Sincerely, Original Signed by R. Landsman for Bruce L. Jergensen, Chief Decommissioning Branch t

Docket No. 50-155

)

License No. DPR-6 hf

){

Enclosure:

As stated See Attached Distribution DOCUMENT NAME: G:\\SEC\\lNSPPLAN.BRP Ta receive a copy of this document, Indicate in the box:"C" = Copy without enclosure *E* = Copy with enclosureN"- No copy OFFICE Rlli 0

Rill

. F l

NAME Landsman:ib $/')hJorgensen k/) N

  1. P 08bf?98 l

DATE 08/of/98 OFFICIAL RECORD COPY

<...,,c 9aO911011i3 990905 PDR ADOCK 05000155 P

PDR 1

j i

l K Powers cc w/ encl:

R. A. Fenech, Senior Vice President, Nuclear, Fossil, and Hydro Operations Richard Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Department of Attomey General (MI) f Emergency Management Division, l

Michigan Department of State Police D. W. Minnaar, Chief, Michigan Department of Health Distribution:

)

Docket File w/ encl PUBLICUSWf%/enci Rlli PRR w/enct S. Weiss, NRR w/enci M. Masnik, NRR w/enci LPM, NRR w/enci C. J. Paperiello, Riti w/enci J. L. Caldwell, Rlll w/enci C. D. Pederson, Rill w/ encl Rill Enf. Coordinator w/enci SRI, BRP w/ encl TSS w/enci Greens w/o enci i

MASTER INSPECTION PLAN Big Rock Point Reactor i

IP No, INSPECTION PROCEDURE TITLE Planned Date l

Facility Manaaement and Control l

CORE INSPECTION 36801 Organization, Management & Cost Controls Ongoing at Permanently Shut Down Reactors 37801 Safety Reviews, Design Changes, and Mods Ongoing at Permanently Shut Down Reactors 40801 Self-Assessment, Auditing, Corrective Action Nov.98 71801 Decommissioning Performance and Status Review Ongoing at Permanently Shut Down Reactors INITIATIVE INSPECTION 35701 Quality Assurance - Annual Review Sept. 98 36800 Organization Sept. 98 39701 Records Program Sept. 98 l

40500 Eval. Licensee Self-Assessment Capability Sept. 98 42700 Plant Procedures Ongoing l

92700 Onsite Follow-up, Written Reports of Upon receipt i

Non-routine Events At Power Reactor Facilit;es 92701 Follow-up Ongoing l

f

MASTER INSPECTION PLAN Big Rock Point Reactor IP No. INSPECTION PROCEDURE TITLE Planned Date Decommissioning Support Activities CORE INSPECTION 62801 Maintenance and Surveillance at Permanently Ongoing Shut Down Reactors 71714 Cold Weather Preparations Nov.98 81XXX Physical Security Assessment at Permanently Shut Down Reactors Sept. 98 INITIATIVE INSPECTION 37700 Design Changes and Modifications Nov.98 37001 Facility Modifications Nov.98 62703 Maintenance Observation Ongoing 71707 Operational Safety Verification Ongoing Spent Fuel Safety CORE INSPECTION 60801 Spent Fuel Pool Safety at Permanently Shut Down Reactors Ongoing 60705 Preparation for Reactor Fuel Handling When required 60851 Design Control of ISFSI Components TBD 60852 ISFSI Component Fab. by Outside Fabricators TBD INITIATIVE INSPECTION 86700 Spent Fuel Pool Activities When required i

2

r i

i l

MASTER INSPECTION PLAN Big Rock Point Reactor I

IP No. INSPECTION PROCEDURE TITLE Planned Date Radiological Safety l

CORE INSPECTION 83750 Occupational Radiation Exposure Sept. 98 Then Bi-monthly l

84750 RadWaste Treatment, Effluent & Environ Monitoring Sept. 98 Then Bi-monthly 86750 Solid RadWaste Management & Transportation of Sept. 98 Rad Mat'Is using Tl 2515/133, " Implementation of Then Bi-monthly Revised 49 CFR Parts 100-179 and 10 CFR Part 71" INITIATIVE INSPECTION 83725 Intemal Exposure Control and Assessment When required 83726 Control of Radioactive Materials and Contamination, March 99 Surveys and Monitoring 83728 Maintaining Occupational Exposures ALARA Nov.98 i

l r

i 3

L_____________________..__

_. _