Forwards SER Re Util 831107 Response to Generic Ltr 83-28, Item 1.1, Post-Trip Review. Addl Info to Correct Listed Deficiencies Requested within 60 Days of Ltr Receipt
ML20126L490
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/07/1985
From: Stolz J
Office of Nuclear Reactor Regulation
To: Beckham J
GEORGIA POWER CO.
Shared Package
ML20126L493 List:
References
GL-83-28, NUDOCS 8506200015
Download: ML20126L490 (3)


Text

r JUN 0 71985 Dockets Nos. 50-321 DISTRIBtJTION and 50-366 20cchet FHe JPartlow NRC PDR ACRS-10 L PDR RIngram ORB #4 Rdg GRivenbark Mr. J. T. Beckham, Jr. HThompson Gray File Vice President - Nuclear Generation OELD BGrimes Georgia Power Company EJordan P. O. Box 4545 Atlanta, Georgia 30302

Dear Mr. Beckham:

We have reviewed your November 7,1983 responses to Item 1.1, Post-Trip Review (Program Description and Procedure) of Generic Letter 83-28 concerning required actions based on generic implications of Salem anticipated transient without scram (ATWS) events.

We find that your response does not meet the guidelines developed for post-trip review in the following areas:

1. The criteria for determining the acceptability of the restart.
2. The responsibilities and authorities of the responsible personnel performing the Post-Trip Review.
3. The method and criteria for comparing the event with expected plant performance.
4. The criteria for determining the need for independent assessment of the event following a trip.
5. A systematic safety assessment program to assess unscheduled reactor trip.

These deficiencies are discussed in greater detail in Section III of the enclosed SER.

Acceptable responses to the noted deficiencies are required before we can complete our review of your Post-Trip Review Program and Procedures. We request that you submit the additional information needed to correct these deficiencies within 60 days of receipt of this letter.

i

T Mr. Beckham This request for additional information was approved by the Office of Management and Budget under clearance number 3150-0011 which expires June 30, 1985. Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D. C. 20503.

Sincerely,

' Conal sics sr Jus J giug,.

John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing

Enclosure:

Safety Evaluation Report cc w/ enclosure:

See next page ORB # ORBj4:DL GR'venbark;cr JStbTt' 6/p /85 6/'p/85' 1

l

A Mr. J. T. Beckhan, Jr. Edwin I. Hatch Nuclear Plant, Georgia Power Company Units Nos. I and 2 cc:

G. F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, D.C. 20036 Mr. L. T. Gucwa Engineering Department Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 Mr. H. C. Nix, Jr., General Manager Edwin I. Hatch Nuclear Plan Georgia Power Company P. O. Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc.

P. O. Box 2625 Birmingham, Alabama 3520:

Resident Inspector U.S. Nuclear Regulatory Comission Route 1. P. O. Box 279 Baxley, Georgia 31513 Dr. J. Nelson Grace, Regional Administrator U.S. Nuclear Regulatory Comission, Region II 101 Marietta Street, Suite 3100 Atlanta, Georiga 30303 Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, S.W.

Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Comissioner Department of Natural Resources 270 Washington Street, N.W.

Atlanta, Georgia 30334 Chairman Appling County Comissioners County Courthouse Baxley, Georgia 31513