ML20148D401

From kanterella
Revision as of 03:14, 24 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-445/88-15 & 50-446/88-11 on 880203-0301.No Violations or Deviations Noted
ML20148D401
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/18/1988
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20148D405 List:
References
NUDOCS 8803240031
Download: ML20148D401 (4)


See also: IR 05000445/1988015

Text

~ _ .

.

.

. .

^

.

MAR I 81988

In Reply Refer To:

Dockets: 50-445/8 -15

l

50-446/ 8-11

TU Electric

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, Texas 75201

Gentlemen:

This refers to the inspection conducted by Mr. M. F. Runyan and a

NRC consultant during the period February 3 through March 1, 1988,

of activities authorized by NRC Construction Permits CPPR-126 and

CPPR-127 for the Comanche Peak Steam Electric Station, Units 1

and 2, and to the discussion of our findings with you and other

members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies. areas

examined during the inspection. Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspectors.

Within the scope of the inspection, no violations or deviations

were identified.

.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

ORIGINAL SIGNED DY R. F. WAItNIC"

R. F. Warnick, Assistant Director

for Inspection Programs

Comanche Peak Project Division

Office of Special Projects

l- Enclosure:

l Inspection Report 50-445/88-15; 50-446/88-11

(

L cc w/ enclosure:

l See next page

W R FU)

AD:IP:CPPD:OSP

hj

2'

IP:CPPD:OSP IP:CPPD:OSPjf/ l

MRunyan HLivermore if RWarnick j

,

3/ t1/88 3/gy/88 3/ 16/88

k

1

j 8803240031 880318

PDR ADOCK 05000445

! ---Q _

DCD __ _. ,,. _ _ _ _ _ _ , _____

_

_

.

.

.

.

'

'# o,, UNITED STATES

g NUCLEAR REGULATORY COMMIMilON

[ E WASHING TON, D. C. 20565

3

MAR I 81988

.....

In Reply Refer To:

Dockets: 50-445/88-15

50-446/88-11

TU Electric

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, Texas 75201

Gentlemen:

This refers to the inspection conducted by Mr. M. F. Runyan and a

l

' NRC consultant during the period February 3 through March 1, 1988,

,

of activities authorized by NRC Construction Permits CPPR-126 and

'

CPPR-127 for the Comanche Peak Steam Electric Station, Units 1

and 2, and to the discussion of our findings with you and other

members of your staff at the conclusion of the inspection.

I

The enclosed copy of our inspection report identifies areas

l

-

examined during the inspection. Within these areas, the inspection

! consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspectors.

Within the scope of the inspection, no violations or deviations

I

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

i

placed in the NRC Public Document Room.

! Should you have any questions concerning this inspection, we will

( be pleased to discuss them with you.

1 Sincerely,

R F l.1) J

i

l

t

l

R. F. Warnick, Assistant Director

i for Inspection Programs

Comanche Peak Project Division

l

Office of Special Projects

l

l

l Enclosure:

l Inspection Report 50-445/P8-15; 50-446/88-11

cc w/ enclosure:

See next page

l

!

l

-. -

I .

.

.

..

TU Electric

cc w/ enclosure:

Roger D. Walker Nancy H. Williams

Manager, Nuclear Licensing CYGNA Energy Services

Texas Utilities Electric Company Suite 390

Skyway Tower 2121 N. California Blvd

400 North Olive Street, L.B. 81 Walnut Creek, CA 94596

Dallas, TX 75201

Robert A. Wooldridge, Esq.

Juanita Ellis Worsham, Forsythe, Sampels

President - CASE and Wooldridge

1426 South Polk Street 2001 Bryan Tower

Dallas, TX 75224 Suite 2500

Dallas, TX 75201

Renea Hicks, Esq.

Assistant Attorney General Mr. Homer C. Schmidt

Environr. ental Protection Division Director of Nuclear

P.O.. Box 12548, Capitol Station Services

Austin, TX 78711-2548 TU Electric

Skyway Tower

Administrative Judge Peter Bloch 400 N. Olive St., L.B. 81

U.S. Nuclear Regulatory Commission Dallas, TX 75201

Washington, DC 20555

Elizabeth B. Johnson Kenneth A. McCollom

Administrative Judge Administrative Judge

Oak Ridge National Laboratory 1107 West Knapp

Post Office Box X, Building 3500 Stillwater, OK 74075

Oak Ridge, TN 37830

GDS Associates, Inc.

Jack R. Newman, Esq. 1850 Parkway Place, Suite 720

Newman & Holtzinger, P.C. Marietta, GA 30067-8237

1615 L Street, N.W., Suite 1000

Washington, D.C. 20036 Mr. Robert E. Ballard, Jr.

Director of Projects

Walter H. Jordan Gibbs and Hill, Inc.

Administrative Judge 11 Penn Plaza

881 West Outer Drive New York, NY 10001

Oak Ridge, Tennesee 37830

Mr. R. S. Howard

Anthony Z. Roisman, Esq. Westinghouse Electric

Suite 600 Corporation

1401 New York Avenue, N. W. Post Office Box 355

Washington, DC 20005 Pittsburgh, PA 15230

Ms. Billie Pirner Garde, Esq. Lanny A. Sinkin

Government Accountability Project Christic Institute

Midwest Office 1324 N. Capitol Street

104 East Wisconsin Avenue - B Washington, DC 20002

Appleton, WI 54911-4897

.

.

.

.

.

'

TU Electric

cc w/ enclosure: (continued)

David R. Pigott, Esq.

Orrick, Herrington & Sutcliffe

600 Montgomery Street

San Francisco, CA 94111

Robert Jablon

Bonnie S. Blair

Spiegel & McDiarmid

1350 New York Avenue, NW

Washington, DC 20005-4798

George A. Parker, Chairman

Public Utility Committee

Senior citizens Alliance of

Tarrant County, Inc.

6048 Wonder Drive

Fort Worth, TX 76133

Joseph F. Fulbright

Fulbright & Jaworski

1301 McKinney Street

Houston, TX 77010

Mr. Jack Redding

c/o Bethesda Licensing

TU Electric

3 Metro Center, Suite 610

Bethesda, MD 20814

William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

Heron, Burchette, Ruckert &

Rothwell

Suite 700

1025 Thomas Jefferson St., NW

Washington, DC 20007

Regional Administrator, Region IV

U.S. Nuclear Regulatory Commission

611 Ryan Plaza Drive, Suite 1000

Arlington, Texas 76011

'

_ - - - _ ._- ._. __ __ . _ _ _ _ .