Forwards Exam Rept 50-321/OL-85-02 of Exams Administered on 850715-18 for Units 1 & 2.Encls 2 & 5 Withheld (Ref 10CFR2.790)
ML20135G400
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/09/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20135G401 List:
References
NUDOCS 8509180531
Download: ML20135G400 (2)


Text

r --

N(ll62)

September 9,1985 Georgia Power Company ATTN: Mr. R. J. Kelly Executive Vice President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

EDWIN I. HATCH EXAMINATION REPORT 321/0L-85-02 The NRC administered examinations on July 15-17, 1985, to employees of your company who had applied for licenses to operate the Edwin I. Hatch Nuclear Plant.

Additionally, the NRC administered requalification examinations to employees of your company who currently' hold licenses to operate the Edwin I. Hatch Nuclear Plant. At the conclusion of the examinations, the examination questions and preliminary findings were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

A table summarizing the examination results for each examined individual is provided as Enclosure 2.

Copies of the written replacement and requalification examination questions and answer keys are included in this report as Enclosures 3 and 4, respectively.

A Requalification Program Evaluation Report is included as Enclosure 5.

In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosures 1, 3, and 4 will be placed in NRC's Public Document Room. Enclosures 2 and 5 are exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (Original signed by VL0rownlee)

Virgil L. Brownlee, Chief Reactor Projects Branch 2 Division of Reactor Projects

Enclosures:

(See page 2) h O

D 321 PDR TKO lh

W I

e Georgia Power Company 2 September 9,1985

Enclosures:

1. Examination Report 50-321/0L-85-02
2. Table of Examination Results (Official Use Only - Privacy Act Information)
3. SR0 Exam Questions and Answer Key -

Replacement Exam

4. .RO/SRO Exam Questions and Answer Key - Requalification Exam
5. Requalification Program Evaluation Report cc w/encls. 1, 2 & 5:

J. J. Badgett, Corporate Training Manager H. C. Nix, Site General Manager cc w/encls. 1, 2, 3, 4 & 5:

C. T. Moore, Site Training Superviscr.

bec w/encls. 1, 2, 3, 4 & 5:

Senior Resident Inspector bec w/ enc 1. 1:

Project Manager, NRR State of Georgia M. King, EG&G Idaho bec w/encls. 1, 3 & 4:

Operating Licensing Branch, OHFS, NRR Document Control Desk 9

/

RII RII RI' RII \ R U

PRSh :bhg e

KBrockman dw bah 1 son c

CAJ ian VP ciera 8/M 85 8/2f/85 8/gj/85 8/ /85 f/85 f/3/D