Enforcement Conference Rept 50-395/85-41 on 851008.Major Areas Discussed:Deficiencies Identified in Insp Rept 50-395/85-34,including Isolation of Both Trains of Low Head Safety Injection
ML20136H546
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/13/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20136H523 List:
References
50-395-85-41-EC, NUDOCS 8511250132
Download: ML20136H546 (2)


Text

I

-.

.

ENCLOSURE ENFORCEMENT MEETING SUMMARY Licensee: South Carolina Electi 'c and Gas Company Facility No.: NPF-12 Docket No.: 50-395 SUBJECT: ENFORCEMENT CONFERENCE TO DISCUSS DEFICIENCIES IDENTIFIED IN INSPECTION REPORT 50-395/85-34 An enforcement conference was held in the Region II Office on October 8,198 The Region II staff opened the meeting by expressing our concerns about the isolation of both trains of low head safety injection; the jumpers omitted from overpower delta temperature circuit cards; and the construction strainers in the suction of both reactor building spray pumps. These items are discussed in detail in Inspection Report 50-395/85-34. In response to these concerns, the licensee presented the findings of their review of these events and an overview of the completed and planned corrective action Based on the licensee's presentation and inspectica findings, the isolation of both trains of low head safety injection and the cmitted jumpers from the overpower delta temperature circuit cards are being considered for escalated enforcement action. However, the issue concerning the construction strainers in the suction of both reactor building spray pumps is unresolved pending review of the licensee's safety evaluatio The Deputy Regional Administrator summarized the issues and concerns of the NR A list of attendees at this meeting is attache Attachment:

Attendance List

.

O I

. _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - ATTACHMENT e

ATTENDANCE LIST October 8, 1985 NRC Attendees: 'J. A. Olshinski, Deputy Regional Administrator R. D. Walker, Director, Division of Reactor Projects (DRP)

A. F. Gibson, Director, Division of Reactor' Safety (DRS)

G. R. Jenkins, Director, Enforcement and Investigation Coordination Staff J. B. Hopkins, NRR Project Manager C. A. Julian,-Acting Chief, Operations Branch, DRS D. M. Verrelli, Chief, Reactor Projects Branch 1, DRP F. S. Cantrell, Chief, Reactor Projects Section IB, DRP C. W. Hehl, Section Chief, Region III R. L. Prevatte, Senior Resident Inspector, DRP P.'C. Hopkins, Resident Inspector, DRP L. P. Modenos, Enforcement Specialist, Enforcement and Investigation Coordination Staff A. H. Johnson, Project Inspector, DRP Licensee Attendees: 0. W. Dixon, Jr., Senior Vice President D. A. Nauman, Director, Vice President Nuclear Operations 0. S. Bradham, Director, Nuclear Plant Operations W. A. Williams, Special Assistant, Nuclear Operations R. Clary, Manager Nuclear Engineering M. N. Browne, Manager, Technical Support K. Woodward, Manager, Operations A. R. Koon, Associate Manager, 'legulatory Compliance H. L. O'Quinn, Shift Supervisor R. Karbach, Control Room Supervisor