Annual Assessment Letter for Summer Nuclear Station, Unit 1, Report 05000395/2012001
ML13063A283
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/04/2013
From: Gerald Mccoy
NRC/RGN-III/DRP/RPB5
To: Gatlin T
South Carolina Electric & Gas Co
References
IR-12-001
Download: ML13063A283 (7)


Text

March 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - REPORT 05000395/2012001

Dear Mr. Gatlin:

On February 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Virgil C. Summer Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Virgil C. Summer Nuclear Station, Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Virgil C. Summer Nuclear Station, Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. We also plan on conducting two non-ROP inspections which include: Temporary Instruction (TI)

2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 1, and an Initial Operator License Exam.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4551 with any questions you may have regarding this letter.

Sincerely,

/RA/

Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects

Docket No.: 50-395 License No.: NPF-12

Enclosure:

Virgil C. Summer Inspection / Activity Plan

(03/01/2013 - 06/30/2014)

cc w/encl: (See page 3)

_________________________

X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP

SIGNATURE SON:/RA/

GJM:/RA/

NAME SNinh GMcCoy

DATE 2/27/2013 2/27/2013 3/ /2013 3/ /2013 3/ /2013 3/ /2013 3/ /2013 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl:

J. B. Archie Senior Vice President Nuclear Operations and Chief Nuclear Officer South Carolina Electric & Gas Company Electronic Mail Distribution

George A. Lippard, III General Manager Nuclear Plant Operations South Carolina Electric & Gas Company Electronic Mail Distribution

Andy T. Barbee Director Nuclear Training South Carolina Electric & Gas Company Electronic Mail Distribution

Wayne D. Stuart (Acting) General Manager Engineering Services South Carolina Electric & Gas Company Electronic Mail Distribution

Robin R. Haselden General Manager Organizational Development &

Effectiveness South Carolina Electric & Gas Company Electronic Mail Distribution

Shaun M. Zarandi General Manager Nuclear Support Services South Carolina Electric & Gas Company Electronic Mail Distribution

Robert L. Justice Manager Nuclear Operations South Carolina Electric & Gas Company

Bruce L. Thompson Manager Nuclear Licensing (Mail Code 830)

South Carolina Electric & Gas Company Electronic Mail Distribution

Donna W. Railey Licensing Technician Nuclear Licensing South Carolina Electric & Gas Company Electronic Mail Distribution

Susan E. Jenkins SC Department of Health & Environmental Control Bureau of Land and Waste Management Electronic Mail Distribution

Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution

Kathryn M. Sutton, Esq.

Morgan, Lewis & Bockius LLP Electronic Mail Distribution

Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532

Senior Resident Inspector Virgil C. Summer Nuclear Station U.S. NRC 576 Stairway Road Jenkinsville, SC 29065 Electronic Mail Distribution Electronic Mail Distribution Letter to Thomas from Gerald J. McCoy dated March 4, 2013

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION - NRC INTEGRATED INSPECTION REPORT 05000395/2013

Distribution w/encl:

C. Evans L. Douglas OE Mail)

RIDSNRRDIRS PUBLIC RidsNrrPMSummer Resource ROP Assessment Institute of Nuclear Power Operations (INPO)

Summer Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 1 of 2 03/04/2013 08:32:46 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title

TI-182

- TI-182 BURIED PIPING/TANK - PHASE 1

03/11/2013 03/15/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping

OL EXAM

- INITIAL EXAM PREP

07/29/2013 08/02/2013 V23400 SUMMER U1/AUGUST 2013 INITIAL EXAM AT POWER FACILITIES

OL RQ

- REQUAL INSPECTION

08/05/2013 08/09/2013 IP 7111111B Licensed Operator Requalification Program

EP

- EMERGENCY PREPAREDNESS EXERCISE

10/07/2013 10/11/2013 IP 7111401 Exercise Evaluation

10/07/2013 10/11/2013 IP 71151 Performance Indicator Verification

OL EXAM

- INITIAL EXAM WEEK 1

08/19/2013 08/23/2013 V23400 SUMMER U1/AUGUST 2013 INITIAL EXAM AT POWER FACILITIES

RP

- RP OCCUPATIONAL BASELINE

08/19/2013 08/23/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

08/19/2013 08/23/2013 IP 71124.02 Occupational ALARA Planning and Controls

08/19/2013 08/23/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

08/19/2013 08/23/2013 IP 71124.04 Occupational Dose Assessment

08/19/2013 08/23/2013 IP 71124.05 Radiation Monitoring Instrumentation

08/19/2013 08/23/2013 IP 71151 Performance Indicator Verification

OL EXAM

- INITIAL EXAM WEEK 2

08/26/2013 08/30/2013 V23400 SUMMER U1/AUGUST 2013 INITIAL EXAM AT POWER FACILITIES

RP

- RP OCCUPATIONAL BASELINE WEEK2

09/09/2013 09/13/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

09/09/2013 09/13/2013 IP 71124.02 Occupational ALARA Planning and Controls

09/09/2013 09/13/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

09/09/2013 09/13/2013 IP 71124.04 Occupational Dose Assessment

09/09/2013 09/13/2013 IP 71124.05 Radiation Monitoring Instrumentation

09/09/2013 09/13/2013 IP 71151 Performance Indicator Verification

HS

- TRIENNIAL HEAT SINK PERFORMANCE

09/16/2013 09/20/2013 IP 7111107T Heat Sink Performance

MODS

- PLANT MODIFICATIONS INSPECTION

11/04/2013 11/08/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications

11/18/2013 11/22/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications

ISI

- UNIT 1 IN-SERVICE INSPECTION

04/14/2014 04/18/2014 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Summer Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 2 of 2 03/04/2013 08:32:46 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title

RP

- RP OCCUPATIONAL BASELINE

04/14/2014 04/18/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

04/14/2014 04/18/2014 IP 71124.02 Occupational ALARA Planning and Controls

04/14/2014 04/18/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

04/14/2014 04/18/2014 IP 71124.04 Occupational Dose Assessment

04/14/2014 04/18/2014 IP 71124.05 Radiation Monitoring Instrumentation

04/14/2014 04/18/2014 IP 71151 Performance Indicator Verification

SGISI

- UNIT 1 SG IN-SERVICE INSPECTION

04/21/2014 04/25/2014 IP 7111108P Inservice Inspection Activities - PWR

RP

- RP OCCUPATIONAL BASELINE WEEK2

04/28/2014 05/02/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

04/28/2014 05/02/2014 IP 71124.02 Occupational ALARA Planning and Controls

04/28/2014 05/02/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

04/28/2014 05/02/2014 IP 71124.04 Occupational Dose Assessment

04/28/2014 05/02/2014 IP 71124.05 Radiation Monitoring Instrumentation

04/28/2014 05/02/2014 IP 71151 Performance Indicator Verification Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure