March 4, 2013
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - REPORT 05000395/2012001
Dear Mr. Gatlin:
On February 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Virgil C. Summer Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Virgil C. Summer Nuclear Station, Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Virgil C. Summer Nuclear Station, Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. We also plan on conducting two non-ROP inspections which include: Temporary Instruction (TI)
2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 1, and an Initial Operator License Exam.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4551 with any questions you may have regarding this letter.
Sincerely,
/RA/
Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects
Docket No.: 50-395 License No.: NPF-12
Enclosure:
Virgil C. Summer Inspection / Activity Plan
(03/01/2013 - 06/30/2014)
cc w/encl: (See page 3)
_________________________
X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP
SIGNATURE SON:/RA/
GJM:/RA/
NAME SNinh GMcCoy
DATE 2/27/2013 2/27/2013 3/ /2013 3/ /2013 3/ /2013 3/ /2013 3/ /2013 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl:
J. B. Archie Senior Vice President Nuclear Operations and Chief Nuclear Officer South Carolina Electric & Gas Company Electronic Mail Distribution
George A. Lippard, III General Manager Nuclear Plant Operations South Carolina Electric & Gas Company Electronic Mail Distribution
Andy T. Barbee Director Nuclear Training South Carolina Electric & Gas Company Electronic Mail Distribution
Wayne D. Stuart (Acting) General Manager Engineering Services South Carolina Electric & Gas Company Electronic Mail Distribution
Robin R. Haselden General Manager Organizational Development &
Effectiveness South Carolina Electric & Gas Company Electronic Mail Distribution
Shaun M. Zarandi General Manager Nuclear Support Services South Carolina Electric & Gas Company Electronic Mail Distribution
Robert L. Justice Manager Nuclear Operations South Carolina Electric & Gas Company
Bruce L. Thompson Manager Nuclear Licensing (Mail Code 830)
South Carolina Electric & Gas Company Electronic Mail Distribution
Donna W. Railey Licensing Technician Nuclear Licensing South Carolina Electric & Gas Company Electronic Mail Distribution
Susan E. Jenkins SC Department of Health & Environmental Control Bureau of Land and Waste Management Electronic Mail Distribution
Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution
Kathryn M. Sutton, Esq.
Morgan, Lewis & Bockius LLP Electronic Mail Distribution
Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532
Senior Resident Inspector Virgil C. Summer Nuclear Station U.S. NRC 576 Stairway Road Jenkinsville, SC 29065 Electronic Mail Distribution Electronic Mail Distribution Letter to Thomas from Gerald J. McCoy dated March 4, 2013
SUBJECT:
VIRGIL C. SUMMER NUCLEAR STATION - NRC INTEGRATED INSPECTION REPORT 05000395/2013
Distribution w/encl:
C. Evans L. Douglas OE Mail)
RIDSNRRDIRS PUBLIC RidsNrrPMSummer Resource ROP Assessment Institute of Nuclear Power Operations (INPO)
Summer Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 1 of 2 03/04/2013 08:32:46 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title
TI-182
- TI-182 BURIED PIPING/TANK - PHASE 1
03/11/2013 03/15/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping
OL EXAM
- INITIAL EXAM PREP
07/29/2013 08/02/2013 V23400 SUMMER U1/AUGUST 2013 INITIAL EXAM AT POWER FACILITIES
- REQUAL INSPECTION
08/05/2013 08/09/2013 IP 7111111B Licensed Operator Requalification Program
- EMERGENCY PREPAREDNESS EXERCISE
10/07/2013 10/11/2013 IP 7111401 Exercise Evaluation
10/07/2013 10/11/2013 IP 71151 Performance Indicator Verification
OL EXAM
- INITIAL EXAM WEEK 1
08/19/2013 08/23/2013 V23400 SUMMER U1/AUGUST 2013 INITIAL EXAM AT POWER FACILITIES
- RP OCCUPATIONAL BASELINE
08/19/2013 08/23/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
08/19/2013 08/23/2013 IP 71124.02 Occupational ALARA Planning and Controls
08/19/2013 08/23/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation
08/19/2013 08/23/2013 IP 71124.04 Occupational Dose Assessment
08/19/2013 08/23/2013 IP 71124.05 Radiation Monitoring Instrumentation
08/19/2013 08/23/2013 IP 71151 Performance Indicator Verification
OL EXAM
- INITIAL EXAM WEEK 2
08/26/2013 08/30/2013 V23400 SUMMER U1/AUGUST 2013 INITIAL EXAM AT POWER FACILITIES
- RP OCCUPATIONAL BASELINE WEEK2
09/09/2013 09/13/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
09/09/2013 09/13/2013 IP 71124.02 Occupational ALARA Planning and Controls
09/09/2013 09/13/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation
09/09/2013 09/13/2013 IP 71124.04 Occupational Dose Assessment
09/09/2013 09/13/2013 IP 71124.05 Radiation Monitoring Instrumentation
09/09/2013 09/13/2013 IP 71151 Performance Indicator Verification
HS
- TRIENNIAL HEAT SINK PERFORMANCE
09/16/2013 09/20/2013 IP 7111107T Heat Sink Performance
MODS
- PLANT MODIFICATIONS INSPECTION
11/04/2013 11/08/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications
11/18/2013 11/22/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications
- UNIT 1 IN-SERVICE INSPECTION
04/14/2014 04/18/2014 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Summer Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 2 of 2 03/04/2013 08:32:46 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title
- RP OCCUPATIONAL BASELINE
04/14/2014 04/18/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
04/14/2014 04/18/2014 IP 71124.02 Occupational ALARA Planning and Controls
04/14/2014 04/18/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation
04/14/2014 04/18/2014 IP 71124.04 Occupational Dose Assessment
04/14/2014 04/18/2014 IP 71124.05 Radiation Monitoring Instrumentation
04/14/2014 04/18/2014 IP 71151 Performance Indicator Verification
SGISI
- UNIT 1 SG IN-SERVICE INSPECTION
04/21/2014 04/25/2014 IP 7111108P Inservice Inspection Activities - PWR
- RP OCCUPATIONAL BASELINE WEEK2
04/28/2014 05/02/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
04/28/2014 05/02/2014 IP 71124.02 Occupational ALARA Planning and Controls
04/28/2014 05/02/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation
04/28/2014 05/02/2014 IP 71124.04 Occupational Dose Assessment
04/28/2014 05/02/2014 IP 71124.05 Radiation Monitoring Instrumentation
04/28/2014 05/02/2014 IP 71151 Performance Indicator Verification Comments:
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure