Insp Rept 50-395/85-39 on 851001-31.No Violation or Deviation Noted.Major Areas Inspected:Tech Spec Compliance, Plant Tours,Operations Performance,Housekeeping,Site Security,Qa Practices & IE Bulletin & Notice Followup
ML20137A132
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/07/1985
From: Cantrell F, Hopkins P, Prevatte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20137A115 List:
References
50-395-85-39, NUDOCS 8511250422
Download: ML20137A132 (7)


Text

.-.

.

.

UNITED STATES

  • /pMfig#'o NUCLEAR REGULATORY COMMISSION

'

-[" n REGION 11 g Ij 101 MARIETTA STREET. * t ATL ANTA, GEORGI A 30323

~ %,.....,/

Report No.: 50-395/85-39 Licensee: South Carolina Electric and Gas Company Columbia, SC 29218 Docket No.: 50-395 License No.: NPF-12 Facility Name: V. C. Summer Inspection Conducted: October 1 - 31, 1985 Inspectors: kbMmd ,

-

m // /7 /Kc Richard L(JPrevatte (/ g Da1(e Jigned 0 Perr9 C. flopkins

$L6 ll/,/15 Date Yigned

[

Approved by: hMm f-,

FloydS.fantrell,(pct-iin Chief

// / //W5 Dat4 Signed DivisionofReactorProjects SUMMARY Scope: This routine, announced inspection involved 317 resident inspector-hours

~

on site in the areas of. technical specification compliance, plant tours, operations performance, reportable occurrences, housekeeping, site security, surveillance activities', maintenance activities, quality assurance practices, radiation control activities, outstanding items review, IE Bulletin and IE Notice-followup, organization and administration, independent inspection and enforcement action followup.

'

Results: Of the areas inspected, no violations or deviations were identifie .

A 8511250422 851113 PDR ADOCK 05000395 G PDR

. - _ _ _

i

!

  • .

.

.

l

+

REPORT DETAILS 1. Persons Contacted

-

Licensee Employees D. Nauman, Vice President, Nuclear Operations 0. Bradham, Director, Nuclear Plant Operations J. Connelly, Deputy Director, Operations and Maintenance ,

K. Woodward, Manager, Operations B. Croley, Group Manager, Technical and Support Services M. Quinton, Manager, Maintenance Services M. Browne, Manager, Technical Support G. Putt, Manager, Scheduling and Materials Management M. Williams, Manager, Nuclear Education and Training L. Blue, Manager, Support Services S. Hunt, Associate Manager, Quality Assurance Surveillance Systems A. Koon, Associate Manager, Regulatory Compliance J. Sefick, Associate Manager, Station Security B. Williams, Supervisor, Operations Other licensee employees contacted included engineers, technicians, operators, mechanics, security force members, and office personne . Exit Interview (30702, 30703)

The inspection scope and findings were summarized on October 31, 1985, with those persons indicated in paragraph 1 above. The inspector described the areas inspected and discussed the inspection findings. The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspectors during the inspection. One unresolved item was identifie Unresolved Item 85-39-01, " LOSS OF ELECTRICAL POWER TO SECURITY EQUIPMENT."

While performing preventive maintenance'on molded circuit breakers power was lost to the security inverter . Licensee Action on Previous Enforcement Matters (92702)

This area was not inspecte . Onsite Followup of Events and Subsequent Written Reports of Nonroutine Events at Power Reactor Facilities (92700, 90714, 93792)

For nonroutine events selected for onsite followup, the inspectors deter-mined'that the licensee had taken corrective action (s) as stated in written reports of the events and their responses were adequate and met regulatory requirements, license conditions, and commitment During the reporting period, the inspectors selected the following nonroutine events for onsite followup:

. .

.

.

(Closed) LER 84-047, " LIQUID EFFLUENT RADIATION MONITOR ISOLATION." The licensee reported this event to Region II on December 6, 1984. The inspectors reviewed the licensee's report, commitments, corrective action and associated documentation. The corrective action appears to be adequate to satisfactorily address this event and prevent recurrence. This item is close (Closed) LER 83-137, " BORIC ACID TANK LEVEL INDICATOR ILI 163A OUT OF CALIBRATION DUE TO INSTRUMENT DRIFT." The licensee reported this event to Region II on December 27, 1983. After calibration of above instrument on December 25, 1983, no other instances of failure or drift have been identifie Corrective action appears to be adequate. This item is close (Closed) LER 83-116, " DISCREPANCY OF 5% BETWEEN MAIN CONTROL BOARD AND CONTROL ROOM EVALUATION PANEL (CREP) INDICATION FOR BORIC ACID TANK LEVEL DUE TO INSTRUMENT DRIFT." The licensee, reported this event to Region II on October 24, 1983. The inspector reviewed the licensee's report, commit-ments, corrective action and associated documentatio The corrective action appears to be adequate to satisfactorily address this event and prevent recurrence. This item is close (Closed) LER 85-011, " ROD CONTROL SYSTEM FAILURE, A DEFECTIVE SLAVE CYCLER COUNTER CARD." The licensee reported this event to Region II on May 7, 1985. The inspector reviewed the licensee's report, commitments, corrective action and associated documentation. The corrective action appears to be adequate to satisfactorily address this event and prevent recurrence. This item is close .(Closed) LER 85-016, "FEEDWATER ISOLATION VALVE, AND ORIFICE WAS INSTALLED, INADVERTENTLY BY THE MANUFACTURER." The licensee reported this event to Region II on July 24, 1985. The inspectors reviewed the licensee's report, commitments, corrective action and associated documentation. The corrective action appears to be adequate to satisfactorily address this event and prevent recurrenc This item is close (Closed) LER 85-019, " LIQUID EFFLUENT GRAB SAMPLE." The licensee reported this event to Region II on August 22, 1985. The inspectors reviewed the licensee's report, commitments, corrective actions and associated documenta-tio The corrective action appears to be adequate to satisfactorily address this event and prevent recurrence. This item is close (Closed) LER 84-046, " ENGINEERED SAFETY FEATURE ACTUATION, DUE TO PERSONNEL ERROR." The licensee reported this event to Region II on December 3, 198 The inspectors reviewed the licensee's report, commitments, corrective action and associated documentation. The corrective action appears to be adequate to satisfactorily address this event and prevent recurrence. . This item is close . .

.

..

(Closed) Special Raport (SPR)84-008, The inspector reviewed the documenta-tion.and corrective action taken by the licensee and expresses no further concern pertaining to this special repor (Closed) Special Report (SPR)84-014, A Review of the licensee's actions appear to have been satisfactor (Closed) Special Report (SPR)84-015, Based upon review of documentation of the licensee's action and investigation, there are no further concerns with this special repor . Monthly Surveillance Observation (61726)

.The inspectors. selected and observed surveillance activities of safety-related systems, and. components to ascertain that these activities were conducted in accordance with technical specifications, limiting conditions for operations and other license requirement The inspectors observed portions of surveillance tests involving safety-related system The inspectors determined that the surveillance test procedure conformed to Technical Specifications (TS) requirements and verified that Limiting Conditions for Operations (LCOs).were met and that the surveillance test was completed at the required frequency. The inspectors also verified that the required administrative approvals and tagouts were obtained prior to initiating the test, or the testing was accomplished by qualified personnel in accordance with approved test procedures and that any required test instrumentation was properly calibrated. Upon completion of the testing, the inspectors observed that the recordeo test data was acetrate, complete and met TS requirements and verified that test discrepancies were corrected, and the systems were properly returned to service. The following specific surveillance activities were observed:

STP 147.001 - Reactor Building Penetration STP 601.003 - Boron Concentration of Refueling Canal MWR 85X0025 - Leak Test NI Detector Covers Within the areas inspected, no violations or deviations were identifie . Monthly Maintenance Observation (62703)

The inspectors observed maintenance activities of safety-related systems and components to ascertain that these activities were conducted in accordance with approved procedures, technical specifications (TS) and appropriate industry codes and standard The inspectors verified the following:

(a) activities were not violating limiting conditions for operations (LCOs);

(b) redundant components were operable; (c) the procedures used were adequate to control the activity; (d) QC hold points were established where required; (e) required administrative approvals and tagouts were obtained prior to work initiation; (f) proper radiological and appropriate ignition /

fire prevention controls were implemented; (g) replacement parts at:d

-

- .. .

.

.

materials used were properly certified; (h) activities were accomplished by qualified personnel using approved procedures; and- (i) equipment was properly tested 'before being returned to servic Additionally, the inspectors reviewed several outstanding job orders to determine that the licensee was giving priority to safety-related maintenance and a backlog which might _ affect its performance was not developing on a given syste The.following specific maintenance activities were observed:

MMP 180-012 Diesel Generator Individual Cylinder Overhaul MWR 85M0424 Support for STP 409-001 Refueling Inspection MWR 85M0391 Turbine Inspection MWR 8501557 Repair Steam Leak MWR 85M0392 "A" Turbine Stop Valve Isolation MWR 85M0394 "A" Turbine Control Valve MRF 20388A&E Rework of Condensate Pumps to Change from Variable to Constant Speed MRF 20891C&E Staging Rotopeening Equipment in Reactor Building and Cable Penetration Within the areas inspected, no violations or deviations were identifie . Onsite followup of Events at Operating Reactors (93702)

On October 7, 1985 at 9:38 p.m. with the plant in Mode 5, a safety injection occurred during the performance of surveillance test procedure STP 125.011, Safeguards Activation Test. The solid state protection system (SSPS) was being aligned in preparation for closing reactor trip breakers. During this step in the procedure, the A train of the SSPS was taken out of test with all safety injection blocks inserted. When the B train was taken out of test, the pressurizer pressure low signal was inadvertently not blocked and since the reactor system was approximately 50 psi a safety injection resulted. All systems functioned as designed and the pressurizer level went from 70% to 80% on the cold calibrated pressurizer leve The injection

. lasted approximately three minutes before being manually terminated by the operato All - equipment was then returned to normal in approximately 20 minutes. An LER 85-028 is being prepared by the licensee at this time addressing cause and effect and corrective action This item will be addressed in a subsequent repor On October 26, 1985, the plant was in a refueling mode with the vessel defuele While performing Electrical Maintenance Procedure EMP 280-007 (preventive maintenance) a major loss of physical security effectiveness was experienced for approximately twenty-five minute Preventive maintenance was being performed on the 120 VDC (1HA) circuit breakers, normally supplied by Bus IDA via a battery charger or from Battery 1 Prior to the test, battery 1A was isolated with the circuit breaker (CB) cpened supplying Bus 1HA1, the undervoltage relay for Bus IDA was de-energized. When the CB reclosed the undervoltage relay condition initiated the blackout sequence The sequencer opened the incoming breaker to Bus IDA preparing the Bus for diesel generator (DG) A loading. Due to the DG A being out of service, Bus IDA remained de-enerized for 25 minute .. .

.

.

The licensee is continuing to pursue the cause and consequences of this event and is performing an evaluation of its impact on the plant. This event is identified as an unresolved item (50-395/85-39-01). pending completion of the licensee's evaluation of this even . Refueling Activities (60710)

The inspectors reviewed licensee progress to ascertain whether pre-refueling activities specified in the technical specifications (TS) have been completed and whether refueling activities are being conducted as required by TS or approved procedures. Specifically, the inspectors verified the following: (a) surveillance testing required by the TS and licensee procedures for fuel handling had been completed prior to the handling of fuel in the core; (b) the periodic testing of refueling related equipment was performed as required by TS or licensee administrative procedures; (c) shift manning for fuel handling operations (removal, inspection, sipping and insertion) and other ongoing activities met the requirements of TS and approved procedures; (d) containment integrity was maintained; and (e) main-tenance of good housekeeping ire the refueling are Additionally, the following STPs including work requests were witnessed /

observed / tracke STP 110.001 Pre-Core Alterations Verification STP 118.006 Reactor Building and Exhaust Refueling Weekly Test STP 125.008(9) A & B D/G Refuel Operation Test STP 125.010(011) A & B Train Safeguards Test STP 360.001 (Stated Series Per TS Requirements During Refueling Activities and While in Mode 6)

Within the areas inspected, violations or deviations were identifie . ESF Syetem Walkdown (71710)

The inspectors verified the operability of engineered safety features (ESF)

systems by performing a walkdown of the accessible portions of the systems listed below. The inspectors confirmed that the licensee's system lineup procedures were consistent with plant drawings and the as-built configura-tio Specific equipment conditions and items that might degrade performance (e.g. , hangers and supports being operable and good house-keeping) were reviewed. Interiors of electrical and instrumentation cabinets were inspected for debris, loose material, jumpers, evidence of rodent The inspectors verified that valves, including instrumentation isolation valves, were in proper position, power was available, and valves were locked if require The inspectors compared both local and remote valve position indications for correctness.

-

)

, - . _ _ _ __ .

.

Q * ..o

.

\ '

The following systems were walked down with the licensee:

Auxiliary Feedwater System Emergency Boration System Containment Spray System Emergency Co:e Cooling System Within the areas inspected, no violations or deviations were identifie . Operational Safetv Verification (71707)

By _ independent system status verification, review of facility records, frequent plant tours and discussions with licensee personnel, the inspector concluded that the facility was being operated safely and in conformance with regulatory requirements for the plant status. The following systems and components or portions thereof was observed / verified as operable:

(a) various electrical boards throughout the plant for proper electrical alignment; (b) accessible portions of service water and component cooling water; (c) several accessible hydraulic snubbers; (d) diesel generators and support systems; and (e) portions of safety and non-safety system Within the areas inspected, no violations or deviations were identified.