_.
.
[4R QEag%
UPSITED STATES
'
NUCLEAR REGULATORY COMMISSION
[ "'
R EGION 11
"
n lt j
101 MAnlETTA STREET, N.W.
- t ATLANTA, GEORGI A 30323
%
4..... s&
Report No.:
50-395/88-08 Licensee:
South Carolina Electric and Gas Company Columbia, SC 29218 Docket No.:
50-395 License No.:
NPF-12 Facility Name:
Summer Inspection Conducted:
March 1-31, 1"88 Inspec rs: -r
~7).
c *C Y
'
Rich rd L. Prevatte Date Signed 6 /$U{m WC/W e Ferry. Hopkins Date Signed
_ u f
,4Ab b e Y!M[
Approved;by: Hugh C. Dance, Section Chief Date Signed DivisionofReactorProjects
'
SUMMARY
,
Scope:
This routine, announced inspection was conducted by the resident inspectors onsite, in the areas of licensee action on previous inspection findings, monthly surveillance observations, monthly maintenance observation, operational safety verification engineered safety features system walkdown, radiological arotection, physical security subsequent wr tten reports, and other areas., onsite followup of events and Results: No violations or deviations were identified.
j
'8804150386 880408
.PDR ADOCK 05000395 Q
_
-..-.
. -
__
_
.
..
_
.
.
'
-
.
.,
.
'
REPORT DETAILS 1.
Persons Contacted Licensee Employees 0. Nauman, Vice President Nuclear Operations 0. Bradham Director, Nuclear Plant Operations D. Moore,deneralManager,En
- M. Williams, General Manager,gineering Services Nuclear Services K. Nettles, General Manager Nuclear Safety
- J. Skolds, General Manager,, Station Operations M. Browne, General Manager, Station Support G. Moffatt, Manager Maintenance Services
- G. Soult, Manager perations
- A. Koon, Manager,,N clear Licensing C. Bowman, Manager, Scheduling and Modifications K. Woodward, Manager Nuclear Operations Education and Training W.Baehr, Manager,CbemistryandHealthPhysics
- S. Hunt, Manager,QualitySystems K. Beale C. Price, Manager, Nuclear Protection Services D. Warner, Manager, Technical Oversite Manager, Core Engineering and Nuclear Computer Services J. Shepp,, Associate Mana Operations
- W.Higgins, Supervisor,keregulatory Compliance NRC Resident Inspectors R. Prevatte, Senior Resident Inspector P. Hopkins, Resident Inspector Other licensee employees contacted included engineers, technicians, operators, mechanics, security force members, and office personnel.
- Attended exit interview 2.
ExitInterview(30702,30703)
The inspection scope and findings were summarized on March those persons indicated in paragraph 1 above.
The inspectors descr31, 1988,ibed with the areas inspected and discussed the inspection findings.
The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspectors during the inspection.
3.
LicenseeActiononPreviousInspectionFindings(92701,92702)
(Closed) Violation 87-24-02'censee provided a written response to thisFailur operation per 50.59.
The 11 violation in letters to Region II, dated November 9,1987 and February 1, 1988.
The inspector reviewed the licensee's responses and corrective i
d
- - -
y---,
-,mw-,--re--,
e--4--,4.
+ - > - - - - - -
-
-m,-rw--
- + - -
-
.--e
,
,y-..
-w
--
ee e-w----
--w-
--
-t&
.
.
_
.
_
'
..
.
.
I
actions taken to prevent recurrence.
These included performing a 10 CFR 50-59 analysis, revision of the 7.2 KV switch gear operating procedure, additional training to licensed operators on this and similar events and revising the Final Safety Analysis Report (FSAR) to address operations with one 115/7.2 KV transformer.
These actions appear to be adequate.
This item is closed.
(Closed)
Violation 87-24-01,ided a written response to this violation in Failure to implement fire protection procedures.
The licensee prov an LER to Region II, dated November 2, ions taken as a result of thisThe inspecto 1987.
licensee's response and corrective act j
event.
The corrective action included additional training of personnel, procedural improvements and the addition of five fire protection shift leaders to track fire protection items on each shift.
The corrective actions were extensive and appear adequate to prevent recurrence.
This item 1s closed.
(Closed)
Violation 88-03-01, Failure to take compensatory action on loss of the Integrated Fire Computer System (IFCS).
The licensee provided a written response to this violation in a letter to Region II, dated March 16,1988.
The inspector reviewed the licensee's response which included additional staffing in the shift fire protection area and additional training of personnel.
This action appears adequate to prevent recurrence.
This item is closed.
,
(Closed)
Violation 88-03-02, Use of outdated procedure.
The licensee provided a written response to this violation in a letter to Region II, dated March 16, 1988.
The inspector reviewed the licensee's response and actions taken as a result of this violation.
The procedure has been corrected and a revision issued.
The two year hold stamp, now used to distinguish procedures on hold, has been changed to a red color to make it more noticeable.
The fire protection supervisor has made a presentation to other supervisors to reemphasize the importance of completing four year procedural reviews.
The above actions should prevent recurrence of this item.
This item is closed.
4.
Monthly Surveillance Observation (61726)
The inspectors observed surveillance activities of safety related systems and components to ascertain that these activities were conducted in accordance with license requirements.
The inspectors observed portions of 11 selected surveillance tests including all aspects of Nuclear Instrumentation System Power Range Calibration.
The inspectors also verified that required administrative approvals were obtained prior to initiating the test, testing was accomplished by qualified personnel S) quired test instrumentation was properly calibrated, data met Technical re ecification (TS) requirements, test discrepancies were rectified, and tie systems were properly returned to service.
No violations or deviations were identifie _
_ _ _ _._
_
__
.
..
__
'
.
..
5.
Monthly Maintenance Observation (62703)
The inspectors observed maintenance activities of safety related systems and components to ascertain that these activities were conducted in accordance with approved procedures, TS and aapropriate industry codes and standards.
The inspectors also determined t1at the procedures used were adequate to control the activity, l.and that these activities were accomplished by cualified personne The inspectors independently verified that equ pment was properly tested before being returned to service.
Additionally, the inspectors reviewed several outstanding job orders to determine that the licensee was giving ariority to safety related maintenance and a backlog which micht affec; its performance was not developing on a given system.
The fo' lowing specific maintenance activities were observed:
WR 205280024 Modify component cooling breaker enclosure and install cell switch linkage hardware PMTS P0099964 gpect and lubricate diesel generator building sump pump PMTS P0100314 Replace gaskets on fuel pump and associated inline gaskets
.
on diesel generator "A" engine i
PMTS P0100316 Inspect,adjustandsetintakeandexhaustvalvesbacklash WR 8703008 Rgair fuel oil leak on fuel oil pump for diesel generator WR 8800229 Repair oil leak above cylinder number 12 on diesel generator "A" i
WR 8700052 Inspect and repair gasket of leaking flange on snubber WR 8840063 Establish flow rate, total pressure, amperage and voltage
,
for damper on air handling unit XDP00728 WR 100380054 Perform Visual Inspection (VT-2) on component cooling piping installed per MRF 10038
,
WR 100380053 Perform VT-2 on liquid waste system piping FMR 209040002 Perform electrical work to change switch from motor operated to manually operated in the component cooling pump switchgear(XPP00018)
WR 88E0044 Perform degraded voltage testing WR 88V0010 Visual inservice hangers inspection
__
._.
.
.
.
..
.
MWR 87E0216 Remove battery, clean and paint battery rack for diesel fire pump PMTS P0101339 Electrical test / calibration of molded case circuit breaker for charging pump "B" lube oil pump PHTS P0102169 Electrical test / calibration of molded case circuit breaker for XVT8104-CS No violations er deviations were identified.
6.
Operational Safety Verification (71707)
'
a.
The inspectors toured the control room, reviewed 31 ant logs, records and held discussions with plant staff personnel
- o verify that the plant was bein operated safely and in conformance with applicable requirements.
cific items inspected in the control room included:
adequacy of sta fing and attentiveness of control room personnel, TS and procedural adherence, operability of equipment and indicated control room status, control room logs, tagout books, operating orders jumper / bypass controls, ccmputer printouts and annunciators.
Tours,of other plant areas were conducted to verify equipment o)erability, control of ignition sources and combustible materials, tie condition of fire de ecticn and extinguishing equipment the control of maintenance and surveillance activities in progres,s, the implementation of radiation protective controls and the physical security plan.
Tours were conducted during normal and random off hour periods, b.
The inspectors reviewed ifcensee nonconformance notices 2929, 2930, i
2319 dispositions 1 and 2, 2926 and 2933 to verify that the
associated deficiencies were properly documented, reviewed for reportability and correctly dispositioned.
This review indicates that the above were reviewed for reportability and a 10 CFR 50.59
'
evaluation was performed when required.
No discrepancies were identified in the above reviews.
The inspectors also reviewed the licensee's Quality Assurance Finding Trend Analysis Report dated January 28, 1988 and Nuclear Quality Control Biannual Trend Report dated February 18 1988.
These reports were developed and provided to management to dlrect their attention to positive and negative trends that are occurring in their areas of
'
responsibility.
The most significant negative trend identified in
'
the above reports, was in the areas of procedural violations.
Discussions with plant management indicates that additional management and supervisory attention has been directed to this area
'
and that this item will be closely monitored for any further adverse trend.
No violations or deviations were identified.
i
-,
, _..
--.---v
,,, -., - - - - -
.
.
__
.
.
.
7.
ESF System Walkdown (71710)
The inspectors verified the operability of an engineered safety features (ESF) system by performing a walkdown of the accessible portions of the Residual Heat Removal System.
The inspectors confirmed that the licensee's system lineu as-built configuration. p procedures matched plant drawings and theThe inspect and items that might degrade performance (hangers and supports were operable, housekeeping, etc.) and inspected the interiors of electrical andinstrumentationcabinetsfordebris,loosematerial, jumpers, evidence of rodents, etc.
The inspectors verified that valves, including instrumentation isolation valves, were in proper aosition, power was available and valves were locked as appropriate.
The inspectors com)ared bothlocaIandremotepositionindications.
Minor deficiencies, suc1 as missing tags, identified during the inspection were corrected by the licensee.
No violations or deviations were identified.
8.
Radiological Protsetion (71709)
,
TM inspectors,iation controlled area (RCA) of the plant, observed and as a part of other routine inspections and work activities inside the rad inspected selected areas of the licensee radiological program and controls.
The inspectors additionally selected a Radiation Work Permit (RWP),
performance of inservice inspection for residual heat removal piping snubbers and supports in "B" residual heat removal pumproom, 88-0076 and verified that the RWP contained the information required by the licen,see's procedures to perform the work in a safe manner under controlled conditions.
The inspectors observed the activities and health physics coverage provided under this RWP.
No violations or deviations were identified.
9.
Physical Security (71881)
The inspectors verified that the security organization shift manning met the requirements of the licensee physical security plan.
Special inspections and routine observations conducted during the performance of other duties and inspections verified that installed access control equipment barriers and systems were maintained operational and utilized tocontrolpersonnel,packagesandequipmentaccesstoprotectedandvital t
areas of the plant.
Positive control is maintained over authorized visitors.
Compensatory action is taken on each occasion when search equipment, alarm systems or protective barriers become inoperable.
Plant areas are adequately illuminated and adequate patrols are maintained.
The licensee's security procedures are enforced.
Installed detection and assessment equipment and systems are well maintained and properly used by the security forc :
.
.
.
No violations or deviations were identified.
10.
Onsite Followup of Events and Subsequent Written Reports (92700, 93713, 93702)
The inspectors reviewed the following Licensee Event Re3 orts (LER's) to ascertain whether the licensee's review, corrective action and report of the identified event or deficiency was in conformance with regulatory requirements, TS, license conditions, and licensee procedures and
,
controls.
Based upon this review the following items are closed.
'
LER 87-027 Reactor trip resulting from power loss to process rack panel XPN 7008 LER 87-028 Reactor trip due to power loss for source range nuclear instrumentation
<
LER 87-030 Failure to establish a continuous fire watch due to personnel error LER 87-031 Missed fire watch due to inadequate procedure LER 88-002 Reactor trip during surveillance testing with N-42 inoperable No violations or deviations were identified.
11.
Other Areas
The Region II Reactor Projects Section Chief for V.C. Summer, the NRR a.
Project Manager and the inspectors observed the licensee's off hour emergency preparedness exercise conducted on March 16, 1988.
Portions of this exercise was also observed b,y an NRC inspection team
'
to evaluate the capability of the licensee s emergency response facilities to support the emergency managers, See IR 50-395/88-06.
b.
The senior resident inspector met and discussed the site with the three members of the South Carolina Public Service Authority's (SCPSA) Nuclear Oversight Committee on March 24, 1988.
SCPSA is one third owner of the Summer plant and recently initiated this group to provide oversight of the Summer plant.
These individuals were visiting the site on an orientation tour.
The resident inspector visited the H.B. Robinson plant during the c.
week of March 21-25, 1988, to complete the annual site spec' fic training, renew his badging and familiarize himself with site, equipment and procedural changes that have occurred in the past year.
This visit is required for the back up resident inspector program, d.
The senior resident inspector participated as a member of the two week operational readiness team inspection at the Farley plant that was completed on March 11, 1988.
l t