ML20149G737

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 970504-0614.Violation Noted:Licensee Did Not Preclude Repetition of Failure to Implement Storage Requirements
ML20149G737
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/11/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20149G736 List:
References
50-395-97-05, 50-395-97-5, NUDOCS 9707240041
Download: ML20149G737 (2)


Text

,

t NOTICE OF VIOLATION ,

1 South Carolina Electric & Gas Company Docket No. 50 395 V. C. Summer Nuclear Station License No. NPF 12 l During an NRC inspection conducted on May 4 through June 14, 1997, a violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedures for NRC Enforcement Actions," NUREG 1600, the violation is listed below:

10 CFR 50 Appendix B, Criterion XVI, Corrective Actions, as implemented by the licensee's quality assurance program, South Carolina Electric &

Gas Company Operational Quality Assurance Plan, Section 12, Revision 23, collectively require that measures be established to assure that l conditions adverse to quality are promptly identified and corrected. i Additionally, in the case of significant conditions adverse to quality, measures shall assure that the cause of the condition is determined and l corrective actions taken to preclude repetition. l Contrary to the above, although measures were established, as documented in responses to Notice of Violations dated July 15, 1996, and December 11, 1996, they did not preclude repetition of a failure to implement storage requirements. On June 4, 1997, material stored in the l Control Building did not meet the requirements given on the engineering i review attached to the Designated Storage and Housekeeping Area Request. l This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, South Carolina Electric & Gas i Company is hereby required to submit a written statement or explanation to the i U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk Washington. l D.C. 20555 with a copy to the Regional Administrator, Region II, and a copy to i the NRC Resident Inspector at V. C. Summer, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for ,

each violation: (1) the reason for the violation, or, if contested, the basis l for disputing the violation, (2) the corrective steps that have been taken and the results achieved. (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. l Your response may reference or include previous docketed correspondence, if '

the correspondence adequately addresses the recuired res)onse. If an adequate reply is not received within the time specifiec in this ttice, an order or a Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be ) roper should not be taken. Where good cause is shown, consideration will ae given I to extending the response time.

Because your res)onse will be placed in the NRC Public Document Room (PDR), to the extent possiale, it should not include any personal privacy, )roprietary, ,

or safeguards information so that it can be placed in the PDR wit 1out redaction. If personal privacy or proprietary information is necessary to l Enclosure 1 9707240041 970711 PDR ADOCK 05000395 g PDR

\

l NOV 2 l

provide an acceptable response, then please provide a bracketed copy of your j

, response that identifies the information that should be protected and &

l redacted copy of your response that deletes such information. If you request l withholding of such material, you must s)ecifically identify the portions of l your response that you seek to have withield and provide in detail the bases ,

l for your claim of withholding (e.g., explain why the disclosure of information '

will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to support a request for withholding i confidential commercial or financial information). If safeguards information )

is necessary to provide an acceptable response, please provide the level of  !

protection described in 10 CFR 73.21. j Dated at Atlanta, Georgia l l this 11 day of July 1997 I