Category:CORRESPONDENCE-LETTERS
MONTHYEARML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20248D6521989-07-20020 July 1989 Forwards Response to Util Re Bills D0184 & D0185 for Plant OL Application Review Costs by Various Program Ofcs Through June 1984 ML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20205C3521988-09-23023 September 1988 Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20237B4361987-12-14014 December 1987 Final Response to FOIA Request for Documents.App B Document, Board Notification 84-024,encl & Also Available in PDR ML20236X6141987-12-0808 December 1987 Final Response to FOIA Request All Documents.No Addl Records Subj to Request Located ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20235B3081987-09-21021 September 1987 Responds to FOIA Request for Documents,Including AEC to ACRS Forwarding Safety Evaluation Re Zimmer.App a Documents Cannot Be Located.App B Documents in Pdr.App C & D Documents Withheld (Ref 10CFR2.790) ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20235K1731987-07-0909 July 1987 Partial Response to FOIA Request for Info Re Certain Contracts Awarded by NRC for Reporting Svcs.Forwards App a & B Documents.Documents Also Available in PDR ML20234F0911987-06-26026 June 1987 Responds to Appeal Re Denial of FOIA Request for Documents. Forwards Document 5 in App F.Portions of Document 5 Withheld (Ref FOIA Exemptions 6 & 7).Other Requested Documents Withheld (Ref FOIA Exemption 6) ML20215K1981987-06-19019 June 1987 Final Response to FOIA Request for Documents Re Allegations Concerning Plant.Forwards App G & H Documents.Documents Also Available in Pdr.App H Documents Partially Withheld (Ref FOIA Exemption 6) ML20213F9351987-05-0808 May 1987 Partial Response to FOIA Request.Forwards App F Document & Weld Allegations.App G Documents Partially Withheld (Ref FOIA Exemption 6) ML20206H4951987-04-13013 April 1987 Partial Response to FOIA Request for Documents Re Bechtel Employment Discrimination.Forwards App E Documents.App D Documents Withheld (Ref FOIA Exemption 6) ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20211A9531987-02-13013 February 1987 Advises That Financial Info Submitted for 1987 in Util Satisfies Requirements of 10CFR140.21 That Each Licensee Maintain Guarantee of Payment of Deferred Premiums for Operating Reactors Over 100 Mwe ML20212M7651987-01-16016 January 1987 Informs That Due to Demands on Staff,Nrc Will Respond by 870430 to 850607 Request for Review of Invoices D0184 & D0185 Re OL Application Review Costs Through 840623 ML20207C0151986-12-19019 December 1986 Forwards Notice of Withdrawal of Application for OLs & Termination of Proceeding,Per Util 860711 Request & ASLB 861217 Memorandum & Order Granting Motion ML20207C1191986-12-18018 December 1986 Forwards Order Terminating CPPR-81 & CPPR-82 Based on Fact That Const of Facility Ceased,Units Inoperable & Site Environmentally Stable,Per Util 860701 Request to Withdraw Application to Amend CPs ML20215B9641986-12-0505 December 1986 Notifies Util of 870204-05 Early Emergency Responders Workshop in Chicago,Il to Discuss Lessons Learned & Current Problems in Coordination & Integration of Emergency Response Efforts.Meeting Agenda & Preregistration Form Encl ML20214Q0911986-11-24024 November 1986 Partial Response to FOIA Request for Documents Re Ofc of Inspector & Auditor Investigations.Forwards App B Documents. Documents Also Available in PDR ML20214A0761986-11-14014 November 1986 Forwards Insp & Evaluation of Plant for Adequacy of Stabilization Plan,Documenting 861015-16 Site Insp & Review & Insp of Site Stabilization Rept.Environ Stabilization Satisfactory ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20215M8851986-10-28028 October 1986 Forwards Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.No Violations Identified ML20211B5401986-10-0909 October 1986 Further Response to FOIA Request for Eight Categories of Documents Re Ee Kent Allegations Concerning Facilities. Forwards Documents Listed in App K ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20209E6621986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR IA-86-235, Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR1986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR ML20212K9061986-08-21021 August 1986 Forwards Request for Addl Info Re Environ Review of Util 860711 Request to Withdraw Applications for OL by 860828 ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20203B2351986-07-10010 July 1986 Informs That Review of 820622 Application to Receive Unirradiated Nuclear Fuel Assemblies Terminated,Per .Fission Chambers Should Be Disposed of & Licenses SNM-1904 & SNM-1905 Terminated,Per 10CFR70.38(b) ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203Q2891986-05-0606 May 1986 Forwards BNL Technical Rept, Surveillance & Maint..., Based on NRC 851014-18 Insp.No Violations Noted.Items Identified Could Have Impact on Later Project Restart. Evaluation of Rept Recommendations Requested within 60 Days ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued 1997-03-31
[Table view] Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC
MONTHYEARML20133H8841985-09-16016 September 1985 Discusses Ee Kent Allegations Re Plant,Per Encl . Decision Reflected in NRC Should Be Reconsidered. B Garde & T Devine of Gap Unwilling to Testify for Kent.Kent & Counsel Unable to Produce Expert Witnesses ML20133H9201985-05-0909 May 1985 Discusses Ee Kent Allegations Re Quality of Engineering & Const at Plant.Region III Could Quickly Dispose of Matters Held Open in NRC .Meeting to Facilitate Closure Suggested ML20095E2211984-08-0707 August 1984 Forwards Minutes of Monthly Third Party Assessment 840712 Meeting Re Status of Independent Assessment of Underpinning & Remedial Soils Work & Status of Const Implementation Overview Program ML20093H6381984-07-24024 July 1984 Solicits Support in Resolution to Call Public,Congress & Administration Attention to Concern Over Impending Electricity Shortage Due to Unnecessary Cancellations of near-term Plants Under Special Interest Group Pressure ML20090G1971984-07-18018 July 1984 Forwards Draft Topical Rept B-84-148, Idcvp:Control Room HVAC Sys Performance Requirements ML20093J5901984-07-18018 July 1984 Forwards Const Implementation Overview Weekly Rept 57 for 840709-13 ML20093E0781984-07-0606 July 1984 Forwards Const Implementation Overview Weekly Rept 55 for 840625-29 ML20095E2591984-07-0303 July 1984 Forwards Independent Assessment of Underpinning Weekly Rept 93 for 840624-0630.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering,Const & QA Personnel Encl ML20095E3051984-07-0202 July 1984 Forwards Const Implementation Overview Weekly Rept 54 for 840618-22.Rept Includes Summary of Activities & Open Items, Nonconformance Identification Repts & Hold Points ML20093A4091984-07-0202 July 1984 Forwards Summary of 10th General Status Review 840621 Meeting in Ann Arbor,Mi on Confirmed Items & Findings Re Idcvp ML20095E2451984-06-27027 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 92 for 840617-0623.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering Const & QA Personnel Encl ML20092P3621984-06-26026 June 1984 Notifies That 840619 Meeting Re Idcvp Rescheduled for 840628 in Ann Arbor,Mi to Discuss Civil/Structural Confirmed Items ML20092H5461984-06-22022 June 1984 Forwards Rev 5 to Project QA Plan, CPC Midland Idcvp. Signed Document Ack Requested by 840702 ML20095E2891984-06-22022 June 1984 Forwards Const Implementation Overview Weekly Rept 53 for 840611-15.Rept Includes Summary of Activities & Open Items, Nonconformance Identification Repts & Hold Points ML20095E2291984-06-20020 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 91 for 840610-16.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering,Const & QA Personnel Encl ML20092C3021984-06-18018 June 1984 Forwards Nonconformace Identification Rept 037 Re Orientation & Configuration of Support in Hanger Sketch ML20092C4021984-06-14014 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 90 for 840603-09 ML20092C9451984-06-14014 June 1984 Forwards Const Implementation Overview Weekly Rept 52 for Wk of 840604-08 ML20092A5641984-06-12012 June 1984 Forwards Info Re Closed Const Implementation Overview Item 080 Re Certified Personnel Not Listed in Available Certifications ML20095E2751984-06-0808 June 1984 Forwards Const Implementation Overview Weekly Rept 51 for 840528-0601.Rept Includes Summary of Activities & Open Items,Nonconformance Identification Repts & Hold Points ML20091M8761984-06-0707 June 1984 Forwards Open Const Implementation Overview Item 087 Re Liquid Penetrant Exam on Welds ML20091N3251984-06-0707 June 1984 Forwards Const Implementation Overview Nonconformance Identification Rept Nir 023 Re Work Print Station 209,for Info ML20092C9731984-06-0606 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 89 for 840527-0602 & Minutes of Daily Meetings ML20091Q8271984-06-0606 June 1984 Forwards Signed Affidavit & Resumes for Mj Huss & Je Walker. Huss & Walker Assigned to Const Implementation Overview Staff ML20091R6611984-06-0606 June 1984 Forwards Const Implementation Overview Weekly Rept 50 for 840521-25 ML20091J8471984-06-0404 June 1984 Forwards Const Implementation Overview Item/Hold Point Notification Forms for Items 072 & 073 Re ANSI N45.2, Section 7 & B&W QA Manual,Rev 3,respectively ML20091L0321984-06-0404 June 1984 Forwards Resumes & Statements of Independence for Jm Hendrie,Jm Biggs & JW Stanley to Conduct Idcvp ML20091N0281984-06-0404 June 1984 Forwards Closed Const Implementation Overview Item 060 Re Site Auditing ML20091N0421984-06-0404 June 1984 Forwards Closed Const Implementation Overview Nonconformance Identification Repts 022 & 027 ML20091N8001984-06-0101 June 1984 Forwards Closed Const Implementation Overview Items 070 & 086 Re Status Assessment Process & Nonconformance Identification Repts 022 & 023,respectively ML20091J8521984-05-31031 May 1984 Forwards Const Implementation Overview Weekly Rept 49 for 840514-18 ML20091H3931984-05-29029 May 1984 Forwards Open Const Implementation Overview Item 082/hold Point Notification.Audit Forms/Checklists Incomplete & Some Criteria of 10CFR50,App B Not Audited ML20091E7191984-05-24024 May 1984 Forwards Closed Nonconformance Identification Rept 019 Re Fddl Printouts Including Error in Unsolicited Drawings ML20091A2061984-05-23023 May 1984 Notifies of Idcvp 840531 Meeting W/Util & Bechtel in Ann Arbor,Mi to Discuss Status of Response to SEP Confirmed Items & to Obtain Info Re Standby Electric Power Sys Performance Requirements Review,Per 840530-0601 Visit ML20091E5051984-05-23023 May 1984 Forwards Closed Const Implementation Overview Item 063 Re Use of Fsk Prints Not Marked Status Assessment Print or W/Expiration Date ML20091J0021984-05-23023 May 1984 Informs That Tera Personnel Will Meet W/Bechtel in Ann Arbor,Mi on 840530-0601 to Discuss Idcvp Progress & Items Re Standby Electric Power Sys Performance Requirements Review ML20091N8801984-05-22022 May 1984 Forwards Independent Assessment of Underpinning Weekly Rept 87, for Wk of 840513-19 ML20092A6691984-05-22022 May 1984 Forwards 840510 Meeting Minutes Re Status of Independent Assessment of Underpinning & Remedial Soils Work ML20091E0691984-05-22022 May 1984 Forwards Tracked Action Item 086 Re Nir 022 & Nir 023. Requests One Reply Clarifying Initial Findings.Current Replies Provide Inaccurate & Conflicting Info ML20091E7521984-05-22022 May 1984 Forwards Closed Const Implementation Overview for Item 059 Re Failure to Maintain Audit Repts ML20091G9611984-05-22022 May 1984 Forwards Minutes of 840510 Meeting Re Third Party Assessment Activities Concerning Underpinning & Remedial Soils Work ML20091B4141984-05-21021 May 1984 Forwards Const Implementation Overview (Cio) Weekly Rept 48 for 840507-11.Rept Includes Summary of Cio Activity,Open Items,Nonconformance Identification Rept Summary & Hold Points ML20091B0711984-05-18018 May 1984 Forwards Const Implementation Overview Nonconformance Identification Rept 025 Re Inprocess Evaluation of Documents Received at Station 219.Item Closed ML20091C5691984-05-18018 May 1984 Forwards Open Const Implementation Overview/Hold Point Notification 085.Asterisked Items May Impact Phase I/Phase II Release ML20091J7711984-05-17017 May 1984 Forwards Open Const Implementation Overview Item 084 Re Verification of Quality Verification Program Activities in Module 800 E-G ML20091J7721984-05-17017 May 1984 Forwards Closed Const Implementation Overview Nonconformance Identification Repts 026 & 024 Re Deficiencies in Drawings, Including Rev 13 to Drawing C-130,Rev 7 to Drawing C-224, Drawing A-871 & Rev 17 to Drawing C-898 ML20091J9331984-05-17017 May 1984 Forwards for Action/Info,Const Implementation Overview Item 083 Hold Point Notification Re Noting on Visible Portion of Cable,Portion of Cable Not Inspected & Reason Why Cable Not Inspected ML20091C5021984-05-17017 May 1984 Forwards Independent Assessment of Underpinning Weekly Rept 86 for 840506-12.Minutes of Daily Meetings Encl ML20084R3661984-05-17017 May 1984 Forwards Open Nonconformance Identification Rept 033 Re Svc Water Pumphouse ML20090K5251984-05-16016 May 1984 Forwards Midland Nuclear Plant Units 1 & 2 Idcvp,Twelfth Monthly Status Rept for 840401-30.Next Ocr/Finding Status Review Meeting Will Be Held in mid-June.Meeting Notice & Agenda to Be Issued When Meeting Scheduled 1985-09-16
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20216E4721987-05-28028 May 1987 Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued ML20197F8331986-04-28028 April 1986 Advises That Response to Generic Ltr 86-04 Re Engineering Expertise on Shift Inapproriate at Present Because Midland Not Currently Under Const.Commitment to Provide Info Will Be Added to Commitment Tracking Sys ML20210L2351986-04-25025 April 1986 Forwards ALAB-106 Monthly Rept for Mar 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20203K8531986-04-23023 April 1986 Responds to NRC Re Allegation Concerning Adequacy of Pipe Whip Restraint Design.Project Records Placed in Storage & Personnel Performing Work Dispersed.Specific Design Approach Would Require Check of Records at Bechtel ML20203P1661986-04-21021 April 1986 Discusses 860407 Study Considering Options for Facility. Options Range from Abandonment of Facility to Completion as Nuclear Plant.Conversion of Plant to Combined Cycle gas-fired Plant Chosen as Most Favorable Option ML20209E6531986-03-28028 March 1986 FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order ML20140F8781986-03-25025 March 1986 Forwards ALAB-106 Monthly Rept for Feb 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20154H9651986-02-25025 February 1986 Forwards Nonconformance Repts Written or Closed During Jan 1986,per Memorandum & Order ALAB-106 ML20154D3581986-02-24024 February 1986 Confirms Items Agreed Upon in 860219 Telcon Re soil-related Issues.Util Will Discontinue Monitoring Dike Groundwater Wells During Shutdown & Site Maint.Authorization Given to Seal Weeping Wall Crack ML20198H2401986-01-24024 January 1986 Forwards ALAB-106 Monthly Rept for Dec 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20136F4771985-12-31031 December 1985 Forwards PNL-5718, Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20138Q5531985-12-31031 December 1985 Submits ALAB-106 Quarterly Rept 50.No New Individuals Assigned quality-related Duties Since 850930 Rept & No Const Activities Projected for Jan-Mar 1986 ML20136C5711985-12-20020 December 1985 Forwards Monthly Rept for Nov 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts,Quality Audit Findings,B&W Repts of Nonconformity & Util Nonconformance Repts,Per ALAB-106 ML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20137Z1481985-11-27027 November 1985 Advises That Response to 851029 IE Bulletin 85-001, Steam Binding of Auxiliary Feedwater Pumps, Inappropriate at Present Since Plant in Surveillance & Maint Status.Schedule for Response Will Be Provided When Status Changes ML20137F2541985-11-25025 November 1985 Forwards ALAB-106 Monthly Rept for Oct 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings,Per 730323 Order ALAB-106 & Amend 1 to Cp.Svc List Encl ML20138J4431985-10-25025 October 1985 Forwards Monthly Rept for Sept 1985,per Memorandum & Order ALAB-106 & Amend 1 to Cp,Including Bechtel Nonconformance Rept,Quality Action Requests,Mgt Corrective Action Repts, Quality Audit Findings & B&W Repts of Nonconformity ML20138D0031985-10-14014 October 1985 Informs That Util Will Submit Schedule for Meeting Requirements of 10CFR50.62(d) Per Generic Ltr 85-06 Re QA Guidance for ATWS nonsafety-related Equipment When & If Project Reactivated ML20133F7581985-10-0808 October 1985 Informs of Plans to Physically Disable Equipment Installed in & About Evaporator Bldg to Serve Process Steam to Dow Chemical Co,Per 850925 Resolution.Equipment & Structures Abandoned Are non-Q.Related Correspondence ML20137Y7921985-09-30030 September 1985 Submits Quarterly Rept 49,per ALAB-106.No New Individuals Assigned to quality-related Duties.Const at Plant Shut Down on 840716.No Const Projected for Fourth Quarter 1985.Next Quarterly Rept Will Be Submitted by End of Dec 1985 ML20133A3141985-09-27027 September 1985 Forwards Review of Section 4.7 of Technical Evaluation Rept PNL-5600, Review of Resolution of Known Problems in Engine Components for Tdi Emergency Diesel Generators, Reflecting Views Re Crankshafts for 16-cylinder Engines ML20133H1261985-09-25025 September 1985 Forwards Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings Written or Closed During Aug 1985,per Condition of Memorandum & Order ALAB-106 ML20138S0731985-09-17017 September 1985 Advises That Addl Excavation Between Tank Farm & Auxiliary Bldg Will Be Conducted Per NRC 850826 Authorization. Excavation Needed to Provide Supplemental Cathodic Protection.Svc List Encl.Related Correspondence ML20133H8841985-09-16016 September 1985 Discusses Ee Kent Allegations Re Plant,Per Encl . Decision Reflected in NRC Should Be Reconsidered. B Garde & T Devine of Gap Unwilling to Testify for Kent.Kent & Counsel Unable to Produce Expert Witnesses ML20140G8331985-08-23023 August 1985 FOIA Request for ACRS Documents Re Facility ML20137F7061985-08-12012 August 1985 Forwards Listed Documents Written or Closed During Jul 1985, in Accordance w/730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Only Nonconformance Repts Encl ML20133L8331985-08-0909 August 1985 Forwards Attachment 1 to Revised Exhibit D of Revised Compliance Filing & Application for Authorization to Issue Securities.Plan Is Requirement of Agreements W/Banks to Restructure Outstanding Debt.Related Correspondence ML20132B1841985-07-19019 July 1985 Forwards Monthly Repts for May & June 1985 Per Condition of 730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Related Correspondence 1989-04-28
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _
_ffRil CIPAL STAFF '
STONE & WEBSTER MICHIGAN, INC. ,(( f;j+ - '
P.O. Box 2325. BOSTON. M ASSACHUSETTS O2107 i "
ff?__ 5CS v J00, fL ;
&@p}- :
.~ l t o Q43v United States Nuclear Regulatory Commission March 15, 1984 Midland Site Resident Office Route 7, J.O. No. 14358 Midland, Michigan Ref. MPF 77 Attention: Mr. R. Cook DOCKET No. 50-339/330 MIDLAND PLANT UNITS 1 & 2 INDEPENDEtJT ASSESSMENT OF UNDERPINNING REPORT NO. 77 l l
A copy of the Independent Assessment of Underpinning Weekly Report No. 77 for the period of March 4, 1984 through March 10, 1984 is enclosed with this letter. Included as attachments are the minutes of the daily meecings held during the week between members of the Assessment Team and Site Engineering, Construction, and Quality Assurance personnel.
If you have any questions with respect to this report please contact me at (617) 589-2067.
[$ N . fan hk &t>
A. Stanley Lucks Project Manager Enclosures ASL/pd 8406010397 840518 6 MAR 1 9 Y gDRADOCK 05000329 PDR,
.T. O. No. 14358 1 Midland Plant, thits 1 & 2 Independent. Assessment of Underpinning Weekly Report No. 77 March 4, 1984 through March 10, 1984 Personnel on Site . _
Stdhe & Webster Michigan, Inc.
P. Majeski 3/4 - 3/8 D. Benvie 3/4 - 3/10 ,
R. Lykens 3/4 - 3/6 W. Kilker 3/6 - 3/10 D. Zito 3/7 - 3/9 '
L. Rouen 3/6 - 3/10 A. Lucks- 3/6 - 3/8 D. O' Nan 3/7.-3/8 Parsons Brinckerhoff, Michigan Inc.
J. Oliveira 3/4 - 3/6 B. Metros 3/6 - 3/10 Meetings Attended Date Represented Purpose 3/5 - 3/7, Stone & Webster Daily Assessment 3/9 Bechtel Team Meeting Consumers Power Parsons 3/6 Bechtel QAP Review Meeting Consumers Power Stone & Webster-MPQAD 3/7 Bechtel - Ehgineering/ Construction Consumers Power Co-ordination Meeting Stone & Webster MPQAD 3/8 .NRC Monthly Meeting with Const.mers Power NRC Stone & Webster 3/9 Bechtel Team Effectiveness Consumers Power Meeting MPQAD
' Stone & Webster Spencer, White & Prentis.
Mergentime .
HRDA (Course Consultant) l
2 J. O. No. 14358 Midland Plant Units 1 & 2 Independent Assessment of Underpinning Underpinning and Remedial Soils - Construction '
Kc-4 has pier:
been Excavation of the bell and installation of the bqll support steel completed.
Pier W-16: Excavation of the pier shaft is complete to El. 572'. Minor seepage into the shaft excavation is being removed by stanp pumping.
Piers CT-1/12: Excavation of the shaft to the subgrade has been completed.
The subgrade for each pier is presently being prepared for placement of mudmats.
Pier Kc-9: The pier concrete was placed and the lower leveling plate for the jackstands was grouted into place.
Pier E-13: Placement of concrete in the pier shaft was completed to El. 592.
Pier E-16: Excavation of the pier shaft is complete to El. 565.
Access Shaft level "C" Wales: Installation of rock bolts to support the west shaft Level C wale is in progress.
SWPS: Installation of the first level wales for the soldier pile wall on the north side is in progress.
1 Assessment Team Observations - Construction The Assessment Team observed the on-going excavation and lagging installations at five pier locations. he Subcontractor's personnel were careful to minimize over-excavation of the piers. Adequate spacing between lagging sets was maintained and backpacking was performed, as required, to fill any void areas.
In those pier excavations where minor water seepage continued, the Subcontractor took prudent measures to divert, collect and remove the water thereby minimizing the impact on the subgrade soils.
The Team believes these installations fulfilled the intent of the design and are in accordance with good underpinning practice.
Surface preparation for the pier Kc-9 upper and lower leveling plates and placement of the lower leveling plate grout was observed by the Assessment Team. The pier surface and the underside of the turbine building slab were roughened and moistened for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in accordance with the procedures to achieve a good bonding surface.
The efficient and continuous placement of the grout avoided segregation and bleeding.
Curing of the grout conformed with prescribed procedures. The Assessment Team believes that procedural, requirements were implemented properly resulting in a satisfactory installation.
Installation of the lateral wellpoints in the UATs began this week. The we11 points are being installed to remove perched groundwater from beneath the Control Tower.
The original method of installation required that the wellpoint be advanced through the soil by means of jacking. However, during installation of the first wellpoint, penetration was limited to a few feet due to the dense nature of the soil. To overcome this problem, the Contractor implemented an alternate method involving the jacking of a perforated open ended pipe into the soil in increments and cleaning out the soil inside the pipe prior to fitrther jacking of the pipe.
Once the pipe has been installed to its full length, the wellpoint will be' installed inside of the perforated pipe. The Assessment Team believes that this alternate installation method is satisfactory in that it minimizes the i potential for loss of_ ground in addition to expediting the installation.
3
' ~
J. 0. No. 14358-Midland Plant Units 1 & 2.
Independent Assessment of thderpinning Assessment Team Observations - QA/QC The Assessment Team perfomed an independent preplacement inspection prior l to concrete placement at pier E-13 and observed concrete placement activities at pier Kc-9. The required reinforcing steel for pier E-13 had beeft installed
~
.in'accordance with applicable drawing and specification requirements. Forms
.were adequately cleaned prior to concrete placement. Quality attributes relating to placement operations and field testing of concrete were evaluated i
by the Assessment Team during concrete placement for pier Kc-9. It is the
- i. Assessment Team's opinion that all concrete preplacemnt and placement activities l'
for piers E-13 and Kc-9, respectively, conformed to-the-appropriate procedures resulting in a satisfactory installation.
Cadwelder qualification testing was observed by the Assessment Team. Splices were tested in accordance with applicable procedures. The qualifications of the inspector performing the tensile test and the calibration data for the tensile testing machine were reviewedand found to be acceptable.
The Assessment Team attended one of the sessions of a " Team Effectiveness"
- course that is being given by a human resourse development consultant to various levels of management and supervision within the Midland Soils Organizations. At this particular session there were three levels of
+
responsibility represented within the respective organizations.(i.e.CP Co.
Site Management- Organization, MPQAD, Bechtel Field Soil Organization, Bechtel Engineering, and the Underpinning Subcontractors). The session dealt with group discussions on the importance of inter-organizational ~
4 communication and presentations of the 1983 goals of the various organizations.
The Assessment Team believes this type of group training is an effective method of promoting positive consnunication and understanding between groups
! and thereby enhance the overall quality of the project.
i Work Activity Packages ll The following Work Activity Package (WAP) overviews are'in the open response l stage or have been completed during the past' week.
WAP No. Title Status (dpened)(Closed)-
82 Repair and Reroute 3/8/84 3/9/84 l 1-1/2 In. Diameter Air Lines Nonconformance Identification Reports
[ 1he following Nonconfomance Reports (NIRs) remain open or have been closed'
, during the past week.
I- 'NIR No. Description Status-(Opcned)(Closed) 22 . Resident Engineering 2/21/84 Document Control Stations !
)
- 1 L ,
r ,
.l l_
~-. _ - .- - . .
. , , ~ . _ , , - ,, . , l
- g. o J. O. No. 14358 Midland Plant
. Units-1 & 2 Independent Assessc!9nt of Underpinning Open Items ,
, Items discussed during meetings are categorized as follows:
OPEN ITEMS - An item for whidi an action is required. The item will remain open until the required action has been taken. Tracking is required.
CLOSED ITEM - An item, usually brought forward by the Assessment Team that is discussed and adequately responded to. No tracking is required.
INFORMATION ITEM - An item, brought forward to provide general background infomation regarding work, such as work status or an upcoming design change. No tracking is required.
OPINION ITEM -- An opinion or suggestion,' given by the Assessment Team expressing an alternate construction or quality assurance technique.
The opinion or suggestion is given as a possible alternate that may facilitate an operation.
CLOSES ITEM -XX-XX - This notation identifies an action that closes a previously identified open item. Tracking of the open item stops.
The following is a listing of all Open items from the Daily Meeting Notes with Bechtel and the text of the Weekly Reports. Carry-over items from-past weeks which have been Closed this week are also listed.
Item No. Description -Closure 58-3 lbbular steel Lagging 77-16 64-7 QAP Review Program Open 64-10 Trend Analysis- .Open 71-9 US Testing QA & nual 23 71-17 Computerized. Civil Open Drawing Register s 71-29 Use of " Retired" FCRs Open 74-21 US Testing Corrective Open Action 74-25 Expansion Anchors. Open 75-9 RE Document Control- Open l 76-14 Lateral Wellpoints at' open
- Piers CT-1/12 l
f
5 f P
.J. O. No. 14358 Midland Plant i Units 1 & 2 l Independent Assessment of Underpinning
~
Item No. Description Closure 77-4
' Tracking Design 0[>en
~
Document Attachments 77-13 Drawing Attachment Open Stamp 77-29 QE Monitoring Open Activities N "-
(U E$l WN Sos- ksS.lueks Project Engineer " (drojset Manag6r Z
h 9
f 4
f
e Notes of Daily Meeting.
Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Consumers Power Company Held at Midland Site Midland, Michigan March 5, 1984 " -
Present For:
Consumers Power Bechtel MPQAD Stone & Webster G.: Wrray J. Fisher R. Sevo - D. Benvie R. Wheeler E. Cvikl P. Majeski R. Wieland J. Gaydos' R. Lykens Parsons Brinckerhoff J. Oliveira PURPOSE This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
DISCUSSION Status Items Item 77 Auxiliary Building Underpinning Activities.
Excavation of the pier shaft for pier Kc-4 is almost complete.
l Preparations are being made to pour the concrete for pier Kc-9 today- .
2 Drifting to pier W-16 continued.
Installation of rock bolts to support the Level C wale has began on the
~
West access shaft. *
( (INFORMATION ITEM)
Item 77 Dewatering Control Tower Area.
J. Fisher reported that while jacking the lateral drains in the UATs resistence had been encountered preventing further penetration of the lateral drains. The contractor plans to auger into the hole to determine the cause of resistance. Based upon the findings, the contractor may evaluate alternate methods to in,* tall the lateral drains. (INFORMATION ITEM)
Item 77-3,- .NIR # 22 - Resident Engineering Document Control Review.
E. Cviki stated that the Resident Engineering response to the QAR concerning NIR # 22 will be issued .today. (INFORMATION ITEM)
New Items Item 77-4 -- Tracking of Attachments to Design Documents.
- P. Majeski asked if a procedure exists designating responsibility for tracking the number of attachments to design documents to determine whenrevisions are necessary.. J. Fisher will respond., (OPEN ITDO
Notes cf Daily Meeting
' Independent Assessment of Uhderpinning Midland Plant, Units 1 & 2 Consumers Power Company Held at Midland Site-Midland, Michigan '
i- March 5, 1984 IEem77 QE Monitoring of Resident Ehgineering Controlled Documents.
P. Majeski questioned if QE monitoring of attachments to the Resident Engineers specifications was performed in 1983. In addition, the Assessment Team requested a copy of the results for the QE monitoring activities of the Resident Engineers controlled drawings and specifications performed in 1983. J. Fisher will respond. (OPEN ITEN)
Item 77 Corrections to the field Document Control Register.
P. Majeski questioned how Field Document Control notifies controlled document stations of corrections made to the register. J. Fisher will
, respond. (OPEN ITEN)
Response Items Item 77 Tubular Steel Lagging.
E. Cvikl providea the Assessment Teac, <ith the last of 3 DCNs issued to designate areas in the vicinity of the Auxiliary Building where filling of internal voids in the tubular steel lagging is required. (Item 58-3 remains OPEN) (INFORMATION ITEN) r t
l l
l n
L
~
Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Consumers Power Company s
Held at Midland Site Midland, Michigan
Present For:
Consumers Power Becht,el MPQAD , Stone & Webster R. Wieland J. Fisher J. McMaster D. Benvie E. Cviki R. Sevo P. Majeski J. Gaydos R. Lykens D. Anderson
,, Parsons Brinckerhoff J. Oliveira PURPOSE This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
DISCUSSION Status Items Item 77 Auxiliary Building Underpinning Activities.
Excavation of the bell for piers CT-12 'and Kc-4 has begun.
Concrete has been placed to the top of pier Kc-9.
Installation cf reshore members has began in preparhtion for excavation of pier W-16.
Engineering has completed their evaluation of the sand' layer at piers E-16 and E-17. As a result, pier E-17 will initially be constructed' as a straight shaft. The shaft will then be enlarged by constructing 2 additional piers directly adjacent to two sides of the initial shaft to create one singular pier.
(INFORMATION ITEM)
Item 77 US Testing QA Manual.
The Assessment Team received a copy of the revised US Testing QA manual.
(Item 71-9 remains OPEN) (INFORMATION ITEM)
Item 77.'10- 'ResidentEngineeringDocumentC5ntrol.
E. Cvik1 provideo the Assessment Team with copies of the QA and QE review report on Resident &lgineers' document control station. (Item 75-9 remains OPEN) (INFORMATION ITEM)
'9
' ~
Notes Cf Daily Meetir4 Independent Assessment of thderpinning Midland Plant, Units 1 & 2 Consumers Power. Company Held at Midland Site -
Midland, Michigan March 6, 1984 3 - -
Item 77 NIR # 22 - Resident Ehgineering Doc'ument Control Review.
The Assessment Te,am received a copy of the Resident Ehgineers response to t,he QAR initiate, concerning NIR # 22. (NIR # 22 remains OPEN)
~
(INIORMATION ITEM)
New Items Item 77 Processing of FCRs/FCNs and NCRs.
P. Njeski repoited that he had discussed the processing of FCR's, FCN's and NCR's with several FSO Engineers and Resident Ehgineers. Based upon these discussions, it is believed that critical path construction can be impacted because of the cumbersome coordination process. Review sequencing, multiple reviews by the same organization and definition of the roles of review organizations were identified as areas where improvements are considered necessary. The Assessment Team requested that the Contractor review these iterts to determine if modifications can improve the handling and disposition cycle. J. Fisher will respond. (OPEN ITEM)
Item 77 Drawing Attachment Stamp.
P. Majeski noted that in addition to attaching change documents to the back of design drawings, FSO also uses a block stamp on the front of the drawing to list attachments that are a part of the drawing. In accordance with administrative procedures, Resident Engineering is not required to use a block stamp listing attachments if the attachments are fastened to the back of the drawing. P. &jeski questioned if both FSO and Resident Ergineering should, for consistency use the same requirements to handle l drawing attachments. J'. Fisher will respond. (OPEN ITEM)
Item 77 US Testing Training Matrix.
J. Oliveira requested a copy of an. updated US Testing training matrix.
, J. Gaydos will respond. (OPEN ITEM)
Item 77 Supervision Responsibilities.
J. Oliveira stated that during pouring of concrete at pier Kc-9, an incident occurred involving vibration of the concrete in which it appeared that the MPQAD Inspector was directing the craftsmen. It was pointed.out that action should be taken by FSO to ensure that responsibilities of those organizations involved with the construction process are well defined.
J. Fisher stated that all'of those involved with construction activities
! on site are cognizent of their responsibilities. However, action will be taken to ensure that responsibilities are well defined. (OPEN ITEM) i e
e-- .
Notes cf Daily Meeting Independent Assessment of. Underpinning l
l Midland Plant,Iklits 1 & 2 Consumers Power Company Held at Midland Site '
Midland, Michigan Mtrch 6, 1984 Response Items Item 77 ,16 - Tubular Steel Lagging.
The Assessment Team has completed a review of DCNs issued to designate areas where filling of the internal voids in the tubular steel lagging is required at the Auxiliary Building and SWPS. Based on the review the Assessment Team believes that the DCNs are adequate. (CLOSES ITEN 58-3) 4 e
f e
Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Consumers Power Company Held at Midland Site '
Midland, Michigan March 7, 1984 Present For:
Consumers Power Bechtel MPQAD Stone & Webster R. Wieland J. Fisher R. Sevo 1 D. Eenvie R. Wheeler E. Cvik1 J. McMaster P. Majeski J. Schaub J. Gaydos W. Kilker -
G. M.trray W. Brandes L. Rouen D. Zito Parsons Brinckerhoff B. Metros PURPOSE This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
DISCUSSION Status Items Item 77 Auxiliary Building Activities.
Installation of the ring beam has started for pier CT-1 and has been completed for CT-12.
Excavation to the subgrade for pier Kc-4 has been completed.
Excavation for the shaft of pier W-16 has begun.
Grouting to stabilize the sand layer in pier E-16 is in progress.
(INFORMATION ITEM)
Item 77 SWPS Underpinning Activities.
J. Fisher reported that drilling of anchor bolt holes on the SWPS wall is on hold until a Balance of Plant NCR written against the SWPS wall is resolved. The NCR was written due to inadequate concrete cover over the rebar on the SWPS wall. This deficiency was discovered while preparing the wall to drill the anchor bolt holes.
A tear was found in the web of one of the wale sections installed on the soldier pile wall along the east side of the SWPS. The referenced Wale has been removed and will be replaced with a new section. (INEDRMATION ITEM)
Item 77 19 - Jacking of the W-8 Grillage.
J. Fisher stated that jacking of the W-8 grillage to increase the load on the grillage is scheduled to resume on 3/8/84. It is planned to jack the W-8 grillage to 130% of the specified design load in 5% increments. The load on the W-8 grillage is presently at 120% of the specified design load.
(INFORMATION ITEN)
3
. . Notes cf Daily Meeting Independent Assessment of Underpinnirs Midland Plant, Units 1 & 2 Consumers Power Company Held at Midland Site
-Midland,-Michigan '
m rch 7, 1984 New Items No new items were discussed.
Response Items Item 77 Corrections to the Field Document Control Register.
J. Fisher responded to the Assessment Team's questions concerning correction of errors to the Document Control register. When an error is found with the register,it is corrected and the register is revised. The affected documents or attachments to documents are then transmitted to the various site document control stations by Field Document Control or recalled by Field Document Control.
(CLOSES ITEM 77-6)
Item 77 US Testing Training Matrix.
J. Gaydos provided the Assessment Team with a copy of the US Testing Training Matrix. (CI.OSES ITEM 77-14)
Item 77 Supervision Responsibilities.
J. Fisher stated that the underpinning subcontractors have issued a memorandum to their workforce stating that superintendents are to ensure that craftsmen working under their supervision unde: stand that their direction is only to come from the Superintendent. The Assessment Team believes that the actim taken is appropriate to ensure that there is no conflict in direction of craftsmen. (CLOSES ITEN 77-15)
Item 77-23 -. US Testing QA &nual.
The Assessment Team has completed a review of the latest revision to the US Testing QA manual. All attached change notices to the prior revision have been incorporated into the text. Also, the new criteria for incorporating future change notices.into the body of the QA manual (i.e. change notices shall be incorcorated when the number of change notices exceeds five, but no later than 45 days after issuance of a change notice) has been added. (CIDSES ITEM 71-9) l l l a
at
i
- Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & 2 .
-Consumers Power Company Held at. Midland Site '
Midland , Michigan March 8, 1984 , ,
1 No meeting was held on this date.
S I
i o
e
, j I
. 1 Notes of Daily Meeting Independent Assessmentof Underpinning Midland Plant, Units 1 & 2 Consumers Power Company s
Held at Midland Site Midland, Michigan
&rch 9, 1984 - -
Present For:
Consumers Power Bechtel MPQAD ,
Stone & Webster G. Nrray J. Fisher J. Mc& ster D. Zito E. Cvikl L. Rouen J. Gaydos W. Kilker C. Miller
, Parsons Brinckerhoff B. Metros PURPOSE
- his meeting is held each day to discuss items regarding the Independent i Soils Assessment at the Midland Plant, Units 1 & 2.
DISCUSSION Status Items Item 77 Auxiliary Building Underpinning Activities.
h e shaft excavations for piers CT1 and CT12 are complete. -he mudmat will be installed shortly.
The casings for thehorizontal drains under the Control Tower are being jacked into place.
'"he ejector pump at well BB-2 is being removed in order to use the location to monitor the level of the perched groundwater. .
(IN ERMATION ITEM)
Item 77 SWPS Underpinning Activities.
~
J. Fisher reported the wale section removed because of the lamination tear from along the east side of the structure has been determined by Engineering to.be an adequate section and will be used at another location in the lateral-soil support system. (IN NRMATION ITEM)
New Items Item 77 Piers CT 1/12 Bell Bracing.
B. Metros asked what bell support is presently planned for piers CT 1/12.
J. Fisher said the nominal bell bracing required on the drawings will.be installed. Additional sheeting of the bell area (s) will be done only if soil or groundwater conditions warrant. (CI.DSED ITEN)
, , Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Consumers Power Company Held at Midland Site Midland, Michigan '
& rch 9, 1984 Iteh77 Review of Weekly Report No. 76.
'1he text of the report was reviewed. It was determined that all open items had been previously identified. (CLOSED ITEM)
Item 77 NCR on SWPS North Wall.
J. Fisher discussed the disposition of an NCR written due to inadequate concrete cover of reinforcing steel which resulted during original construction of the SWPS. - Conditional release to the NCR was given to allow resumption of the underpinning work. The conditional release was allowed because the underpinning work did not create the nonconforming condition, resolution of the NCR will not impact underpinning operations or conversely the underpinning operations will not impact the resolution of the NCR. The Assessment Team believes that issuance of the conditional release is appropriate as it applies to the SWPS underpinning work. (CLOSED ITEM)
Item 77 QE Monitoring Activities.
In response to an Assessment Team request, C. Miller provided the Assessment Team with copies of the QE monitoring activities perfccmed in 1983 on the RE controlled drawings and specifications. The Assessment Team will review this information. (CLOSES IIEM 77-5) (OPEN ITEM)
Item 77 Construction and Engineering Ccrrespondence.
E. Cviki provided a copy of the correspondence that took place between Construction and Engineering with respect to the SWO audits. (Item 75-9 remains OPEN) (CLOSED ITEM)
$