August 21, 1986 Docket Nos. 50-329/330
' Mr. James W. Cook '
Vice President-Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201
Dear Mr. Cook:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR ENVIRONMENTAL REVIEW OF APPLICANT'S REQUEST TO WITHDRAW THE MIDLAND PLANT, UNITS 1 AND 2, OPERATING LICENSE APPLICATION By motion dated July 11, 1986 filed with the Midland Atomic Safety and Licensing Board (ASLB), Consumers Power Company (Applicant) requested the issuance of an order authorizing the withdrawal of the application to operate Midland Units 1 and 2 as nuclear plants.
In order to prepare for response to the ASLB the NRC staff intends to conduct a review of the site to determine whether any conditions for protection of the environm<!nt are necessary. The information identified in the enclosure is needed for this review.
In order to firm up the schedule to complete our review, you should provide a date for response to the enclosed request within 7 days af the date of this letter.
y Sincerely, Original signed by Herbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:
1 Docket File NRC PDR Local PDR SSPD Reading
(
TMichaels p
CYCheng i,
0 Lynch
\\
AHodgdon, OGC o
b(g f'
HBerkow OGC()4 l )
- SEE PREVIOUS CONCURRENCE SHEET DPWRL-B:SSPD* PBEB*
DFWRL-B:SSPD*
3 DPWRL-BPS i m TMichaels CYCheng Olynch AHod gdon HBerkow 08/08/86 08/08/86 08/11/86 08/jp/86 08/j;/86 e600200115 a60001 PDR ADOCK 05000:109 A
PDH
. ~
jl e}gj A
~ Docket Nos. 50-329/330 Mr. James W. Cook i
hff
(' QNbJ )d -
d Vice President -- Projects c
Engineering and Construction f
l i
1945 West Parnall Road v
Jackson, Michigan 49201
=
l
/
Dear MF./ Cook:
7" j
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR ENVIRONMENTAL REVIEW o
OF APPLICANT'S REQUEST TO WITHDRAW THE MIDLAND PLANT, UNITS 1 AND 2, OPERATING LICENSE APPLICATION By motion dated July 11, 1986, filed with the Midland Atomic Safety and Licensing Board (ASLB), Consumers Power Company (Applicant) requested the issuance of an order authorizing the withdrawal of the application to operate Midland Units 1 and 2 as nuclear plants.
In order to prepare for response to the ASLB the NRC staff intends to conduct a review of the site to determine whether any conditions for protection of the environment are necessary. The information identified in the enclosure is needed for this review.
In order to firm up the schedule to complete our review, you should provide a date for response to the enclosed request within 7 days of the date of this letter.
Sincerely.
Herbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation
-cc:
See next page DISTRIBUTION:
Docket File NRC PDR Local PDR SSPD Reading TMichaels CYCheng Olynch AHodgdon 0GC HBerkow/.
((\\,[
DP 8:SSPD P!ftC / Q RUB:SSPD OGC DPWRL-BPSSPB TMi aels CYCh'en,g/ OL nEh AHodgdon HBerkow 08/og/86 08/g/86 08 gj /86 08/ /86 08/ /86 T. H~A
1 o
UNITED STATES g
[
g NUCLEAR REGULATORY COMMISSION 5
- j WASHINGTON, D. C. 20555 August 21, 1986 Docket Nos. 50-329/330
'l Mr. James W. Cook Vice President Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201
Dear Mr. Cook:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR ENVIRONMENTAL REVIEW 0F APPLICANT'S REQUEST TO WITHDRAW THE MIDLAND PLANT, UNITS 1 AND 2, OPERATING LICENSE APPLICATION By motion dated July 11, 1986 filed with the Midland Atomic Safety and Licensing Board (ASLB), Consumers Power Company (Applicant) requested the issuance of an order authorizing the withdrawal of the application to operate Midland Units 1 and 2 as nuclear plants.
In order to prepare for response to the ASLB the NRC staff intends to conduct a review of the site to determine whether any conditions for protectfan of the environment are necessary. The information identified in the enclosure is needed for this review.
t In order to firm up the schedule to complete our review, you should provide L
a date for response to the enclosed request within 7 days of the date of this letter.
l Sincerely.
l rbert N. Berkow, Director tandardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation cc: See next page
REQUEST FOR ADDITIONAL INFORMATION FOR ENVIRONMENTAL REVIEW 0F PROJECT TERMINATION 1.
Provide a site plan showing areas (including transmission corridors) disturbed by construction-related activities.
Identify the specific use of each disturbed area. Estimate acreage for each such disturbed area.
2.
Identify on the site plan all structures.
Indicate which structures will be removed and which will remain. Provide a schedule for removal of structures and describe the method of debris disposal.
3.
Describe the status of the site, with particular attention to disturbed areas and to related erosion and runoff control measures.
4.
Describe plans for future use of the site to the extent that such plans have influenced the selection' of site stabilization activity, if any.
Indicate the anticipated schedule for future use and describe how the future use influences the proposal for stabilization work.
5.
Describe proposed stabilization activities, if any, including procedures and schedules for grading, seeding, and planting which will be done to leave the site in a stable condition.
6.
Indicate what permits and approvals will be needed from other federal, state, or local agencies for any of the site stabilization work.
l l
l l
I l
l l
~
o Mr. J. W. Cook Midland Nuclear Plant Consumers Power Company Units I and 2 cc:
Michael I. Miller, Esq.
Mr. Don van Farrowe, Chief Ronald G. Zamarin, Esq.
Division of Radiological Health Alan S. Farnell, Esq.
Department of Public Health i
Isham, Lincoln & Beale P. O. Box 33035 Three First National Plaza, Lansing, Michigan 48909 51st floor Chicago, Illinois 60602 Mr. Steve Gadler 2120 Carter Avenue James E. Brunner, Esq.
St. Paul, Minnesota 55108 Consumers Power Company 212 West Michigan Avenue Ms. Barbara Stamiris Jackson, Michigan 49201 5795 N. River Freeland Michigan 48623 Ms. Mary Sinclair 5711 Summerset Drive Mr. Tom McNish, Secretary Midland, Michigan 48640 Consumers Power Company 212 W. Michigan Avenue Stewart H. Freeman Jackson, Michigan 49201 Assistant Attorney General State of Michigan Environmental Mr. Walt Apley
' Protection Division c/o Mr. Max Clausen 720 Law Building Battelle Pacific Northwest Labs Lansing, Michigan 48913 (PNWL)
SIGMA IV Building Mr. I. Charak, Manager Battelle Blvd.
NRC Assistance Project Richland, Washington 99352 Argonne National Laboratory 9700 South Cass Avenue Mr. R. B. Borsum Argonne, Illinois 60439 Nuclear Power Generation Division Babcock & Wilcox Regional Administrator, Region III 7910 Woodmont Avenue, Suite 220 U.S. Nuclear Regulatory Commission, Bethesda, Maryland 20814 799 Roosevelt Road Glen Ellyn, Illinois 60137 Cherry & Flynn Suite 3700 Ms. Julie Morrison Three First National Plaza Midland Daily News Chicago, Illinois 60602 124 Mcdonald Street l
Midland, Michigan 48640 Mr. Ron Callen Michigan Public Service Commission Billie Pirner Garde 6545 Mercantile Way Director, Citizens Clinic P. O. Box 30221 for Accountable Government Lansing, Michigan 48909 Government Accountability Project Institute for Policy Studies Mr. Howard Levin, Project Manager 1901 Que Street, N.W.
TERA Corporation Washington, D. C.
20003 7101 Wisconsin Avenue Bethesda, Maryland 20814 l
Ms. Lynne Bernabei l
Government Accountability Project 1901 Q Street, N.W.
Washington, D.C.
20009
_, _