Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106
ML20211L036
Person / Time
Site: Midland
Issue date: 06/25/1986
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
32735, ALAB-106, NUDOCS 8607010182
Download: ML20211L036 (19)


Text

. _

\

+

Power O Consumers Company Vice President - hejects, Engineering 1

and Construction General offices: 1945 West Pernell Road, Jackson, MI 49201 e (517) 788-0453 June 25, 1986 Director of Office of Inspection and Enforcement Att Mr James M Taylor US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT - ALAB-106 M0hTHLY REPORT FOR MAY 1986 DOCKET NOS 50-329 AND 50-330 FILE 0.4.6 SERIAL 32735 In accordance with Condition of Memorandum and Order ALAB-106, dated March 23, 4

1973, and Amendment No 1 of the Midland Plant Construction Permit, enclosed are five copies of the following documents written or closed during the month; Bechtel Nonconformance Reports, Quality Action Requests, Management Corrective Action Reports, Quality Audit Findings; Babcock & Wilcox Reports of Noncon-formity; Consumers Power Company Nonconformance Reports, Audit Finding Re-ports, Quality Action Requests, Corrective Action Reports, and Management r

Corrective Action Requests / Reports.

}W ,

JWC/WRB/lr CC JGKeppler, USNRC Region III (w/ enc)

CBechhoefer, Esq. ASLB (w/ enc)

ALAB-106 Service List (w/ enc)

']

8607010182 860625 PDR ADOCK 05000329 S PDR f f5 OC0686-0043A-MP02

  1. 1:#ch,"

ALAB-106 MONTHLY REPORT SERVICE LIST Mr Frank J Kelley, Esq Mr Steve Cadler Attorney General of the 2120 Carter Avenue State of Michigan St Paul, MN 55108 Ms Carole Steinberg, Esq Assistant Attorney General Mr William Clements (2)

Environemntal Protection Div Docketing & Services 720 Law Building US Nuclear Regulatory Commission Lansing, MI 48913 Office of the Secretary Washington, DC 20555 Mr Myron M Cherry, Esq Cherry & Flynn Ms Mary Sinclair 3 First National Plaza 5711 Summerset Street Suite 3700 Midland, MI 48640 Chicago, IL 60602 i

Mr Joseph Rutberg Mr F C Williams, Esq Assistant Chief Hearing Council Isham, Lincoln & Beale US Nuclear Regulatory Commission 1120 Connecticut Ave, NW Office of the Executive Legal Director Suite 325 Washington, DC 20555 Washington, DC 20036 Ms Barbara Stamiris Mr P Robert Brown, Jr 5795 North River Road Clark, Klein & Beaumont Route 3 1600 First Federal Building Freeland, MI 48623 1001 Woodward Avenue Detroit, MI 48226 Mr John Demeester, Esq 1 Dow Chemical Building Ms Lynne Bernabei Michigan Division Government Accountability Midland, MI 48640 Project of the Institute for Policy Studies Mr Michael I Miller, Esq 1901 Q Street, NW i Isham, Lincoln & Beale Washington, DC 20009 3 First Naticnal Plaza 52nd Floor Mr James E Brunner, Esq Chicago, IL 60602 Consumers Power Company 212 West Michigan Avenue Jackson, MI 49201 l

OC0686-0043A-MP02 1

- - ~ , , - - ,, m... , --.-c -.,.---n- ee - < ~ , - . - w -. -, -, , , . vnw - - - , - , ,, , , , - ,

1 INDEX OF ATTACHMENTP ALAB-106 MONTHLY REPORT MAY 1986 Bechtel Nonconformance Reports - None Bechtel Quality Action Requests - None Bechtel Management Corrective Action Reports - None Bechtel Quality Audit Findings - None Babcock & Wilcox Reports of Nonconformity - None Consumers Power Company Nonconformance Reports -

Q-00072, Opened 5/1/86 Q-00073, Opened 5/8/86, closed 5/8/86 Q-00074, Opened 5/12/86, closed 5/12/86 Q-00075, Opened 5/12/86, closed 5/12/86 Q-00076, Opened 5/12/86, closed 5/12/86 Q-00077, Opened 5/12/86, Closed 5/12/86 Q-00078, Opened 5/14/86 Q-00079, Opened 5/19/86, Closed 5/29/86 Consumers Power Company Audit Finding Reports - None Consumers Power Company Quality Action Requests - None Consumers Power Company Corrective Action Reports - None Consumers Power Company Management Corrective Action Request / Reports - None 4

OC0686-0043A-MP02

15 NCR NO.

RECORDCOPY 17 REV.

QUALITY ASSURANCE Q-00072 0 DIVISION 16 DATE ISSUED FORM QAD-1 5/1/86 NONCONFORMANCE REPORT 18 PAGE 1 0F 2 1 ITEM LOCATION Various design drawings 2 DRAWING OR PART NO. AND REV. 3 PAPT NAME 4 SERIAL NO.

Various Various N/A 5 ITEM DESCRIPTION Various design drawings, as identified in the results of Construction System Associates Inc. (CSA) report on their computet processing of Midland design input (drawings) for Unit 2 containment.

6 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED Various QA-006, Rev. 4 No

~9 INSPECTION PLAN REV. 10 ACTION ORGANIZATION N/A . .. _ . . _ . _ - . Engineering Technical.. Support . . - - ._ _ . _ _

11 ACTIVITY HOLD REQUIRED: ACTIVITY HOLD ORDER NO.

YES X NO N/A 12 REQUIREMENT Section 4.2.2 of procedure QA-006, revision 4 states in part ... "When a nonconformance is reported to or detected by QAD personnel, QAD is responsible for: ... d. Documenting the nonconformance on a NCR (Appendix A)."

13 NONCONFORMANCE Consumers Power Company received a report from CSA on their computer processing of our design input (drawings) for Unit 2 containment. From approximately 1000 drawings processed, 86 Drawing Problem Notices (DPNs) were generated. These were made up of 34 interference and 52 dimension-labeling type problems. The discrepancies identified are considered indeterminate conditions due to DCNs, FCNs and FCRs which may have been in the process of being incorporated at the time of shutdown.

14 NCR 61 ED BY ,

(1 copy of DPNs sent to Document Control with original NCR; I copy of DPNs kept with copy of the NCR in the y ([//h[

gpg / A

  1. [/6(,

QAD NCR file.) 'DATE g,/ {

0 WCAns OF H0G TAGS OR SENE AREA 17 HOLD TAG APPLIED YES X NO ITEMS SEGREGATED YES X NO N/A r

I BY 21 NEED TO REVIEW FOR m REPORTABILITY YES X NO DATE f///// / uwMA 22 DETERMINED TO BE REPORTABLE 24 SECTION HEAD, ASSURANCE ENGINEERING YES NO N/A QA-006 Rev 4

25 CAUSE 33 PAGE 2 0F 2 j i

I 26 PROCESS CORRECTIVE ACTION REQUIRED l l YES I l NO 27 RECOMMENDED DISPOSITION l l REWORK l l SCRAP / REJECT l l REPAIR

  • l l USE AS IS*
  • REQUIRES TECHNICAL JUSTIFICATION ATTACHED 28 ADDITIONAL INFORMATION 29 DISPOSITION CONCURRENCE l

ACTION ORGANIZATION DATE QAD CONCURRENCE DATE i

ENGINEERING DATE A.N.I. (ASME) IF REQUIRED ,

30 DISPOSITION ACTION TAKTli )

l 31 METHOD OF DISPOSITION ACTION VERIFICATION 32 NCR CLOSED BY RESULTS OF DISPOSITION ACTION VERIFICATION 7 ACCEPTABLE l l UNACCEPTABLE QAD DATE l IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR A.N.I. (ASME) DATE IF REQUIRED QA-006 Rev 4 l

I

W-RECO3DCOPY ll QUALITY 15 ,NCR NO. 17 REY.

ASSURANCE O(- ODO78 O DIVISION TE ISSUED 16J/,Dp/4 FORM QAD-1 NONCONFORMANCE REPORT 18 PAGE / OF /

1 ITEM LOCATION Awc130Xr. R M .'2-1 ,

2 DRAWING OR PART NO. AND REV. 3 PART NAME 4 SERIAL NO.

Nik NA NA 5 ITEM DESCRIPTION SEE BLdV-\*3 6 ITEM STARTUP SYSTEM NO. 7 REFERENCE 90CUMENT 8 ASME A.N.I. REQUIRED NA W.0 Z29 M9 2- NA 9 INSPECTION PLAN REV. 10 ACTION ORGANIZATION WO(0009'L4lIRcVI__...._. .. 0 +04 . . _ _ . . _ - - _ _ . . _ . _ _ . - - . _ _ . . - _ _

11 ACTIVITY HOLD QUIRED: ACTIVITY HOLD ORDER NO.

YES Y NO x

12 REQUIREMENT St.o. 9fbf) 7,, STAT 66 IM ?"M " ( NT6E4 ort- oF PAcic i ries To Be Feer O P . . . STAgoiuc7 [Fuohe0 me% . . . . "

13 NONCONFORMANCE koX . 6 L-ON. [2, A4, g.( HM AFJ2f2cX. 3d op 3 tap piM W A T E R o g 7}.4 g 7LooR, Tidi$ iTgpir WA4 C CC/t-0i u A rsp w L-ru o fmtto N5 M 4h a/$

~fu f)6. DI2.AINGD, NOWc \/W, W Pl.Ar'c/L Q/(AlAll-lAS A10 7 (lET hGEASOf0W-

  • ~

14 NCR ORIGINATED BY AM dw #4hs DATE O LO W ION OF HO G TAGS OR SEGREAT E AREA 19 HOLD TAG APPLIED YES 'JO ITEMS SEGREGATED YES / NO Qh (

23 NCR M Y 21 NEED TO REVIEW FOR REPORTABILITY YES NO /

DATE

, 22 DETERMINED TO BE REPORTABLE 24 SECT 0 HEAD,' ASSURANCE EN61NEERIN6 '

YES NO QA-006 Rav 4 l

a l

25 CAUSE 33 PAGE 2 0F 2 Cause of water unknown. It is suspected that accumulation of leakage around the Con-tainment and Aux. bldg. wall coupled with a plugged floor drain led to the eventual water problem.

26 PROCESS CORRECTIVE ACTION RZQUIRED l l YES W NO 27 RECOMMENDED DISPOSITION W REWORK l l SCRAP / REJECT l l REPAIR

  • l l USE AS IS*
  • REQUIRES TECHNICAL JUSTIFICATION ATTACHED 28 ADDITIONAL INFORMATION Efforts are currently under way to drain off the 3-4" of standing water in this area, and work requests were, initiated when the problem was__first discovered, on 4/24/86., to _

j _ have the floor drains cleared. Forecast for completion: 6/15/86.

j 29 DISPOSITION CONCURRENCE ny crav, h  ! O ACTION ORGANIZATION DATE QAD CONCURRENCE DATE ENGINEERING DATE A. N. I. (ASME) IF REQUIRED 30 DISPOSITION ACTION TAKEN Water was drained on 5/19/86. Forecast date only for completion of work order.

31 METHOD OF DISPOSITION ACTION VERIFICATION 32 NCR CLOSED BY RESULTS OF DISPOSITION ACTION VERIFICATION l JACCEPTABL2 l l UNACCEPTABLE QAD DATE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR A.N.I. (ASME) DATE IF REQUIRED QA-006 Rev 4

-+ r - -- - - ~ - ry 7 ._,4 _.___,_,.--%,.g,,.,.,5 w-y e -,.y.g,,*,-< -9gg W g-

L. .

RECORDCOPY  !

QUALITY 15 NCR NO. 17 REY. ,

ASSURANCE d - Om > J d '

DIVISION 16 DATE ISSUED FORM QAD-1

,$/p//G NONCONFORMANCE REPORT / OF 2, 18 PAGE 1 ITEM LOCATION  !

Zack Fab shop area and QC Hold area - Poseyville Laydown area 2 DRAWING OR PART NO. AND REV. 3 PART NAME 4 SERIAL NO.

N/A 4 x 4 x % tube steel McN-C1060-2 5 ITEM DESCRIPTION Square tubing, 4 x 4 x \ - (20 f t lengths) 200 ft total 6 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED Zack Field Procedure PGM-00 MB-FQCP-1 rev. 4 N/A 9 INSPECTION PLAN REV. 10 ACTION ORGANIZATION

- ' ' - - ~ -~ ~-"- --"- - --

' - - - - - " - ~ - -"

__ _ _ _ . N / A - - 'N/A --

11 ACTIVITY HOLD REQUIRED: ACTIVITY HOLD ORDER NO.

YES X NO N/A 12 REQUIREMENT This NCR in innued in accordance with procedure QA-006, rev. 4 Midland Project Shutdown Organization Procedure Manual, to close original MPQAD NCR H-00379-ZZ for support of shutdown activities.

Zack Purchase Order C-1060 dated 2/7/80 specified 4 x 4 x \ square tubing and identified the line item to be 1060-2.

13 NONCONFORMANCE Square tubing, 4 x 4 x 3/16 was found in job site stock marked MCN #1060-2. No purchase orders have been found for 4 x 4 x 3/16 tube steel. Therefore, this material has no traceability.

Recommended Corrective Action: Identify all locations of installed material associated with McN-1060-2 and provide documented evidence that all material installed is of the correct size. 14 CR ORIGINATED BY

,n _ 578!Ad s Zimmerman / ITATE

}

O LOC m 0N OF HO D M S OR SEGREA M AREA 19 HOLD TAG APPLIED YES X NO 1 Za,c_k Fab Shop - OC Hold area ,

21 NEED TO REVIEW FOR 23 NCR R ' Y  % W4 REPORTABILITY YES X NO DATE -~[

22 DETERMINED TO BE REPORTABLE 24 SECTI IfEAD, %SSURANCE ENGIMEERING/ /

YES NO QA-006 Rev 4

25 CAUSE ,

Basedonmalerfakr ords. All usage of this material has been 3 M L OF L investigated for 3/16" wall thickness. All pieces have been identified in this NCR that have 3/16" wall thickness. Use of 3/16" wall material in Hanger #28.1, V07 sh 3 approved by FCR-C6093. One piece tagged at Fab Shop /Poseyville yard to be sent to an independent testing lab for chemical and physical properties testing. Other tagged piece to be scrapped.

2. 5/8/86 a) 3' piece 4 x 4 x 3/16 tube steel located in QC Hold area.

b) 6' piece 4 x 4 x 3/16 tube steel located at'Poseyville sold as scrap at last auction held in Fall of 1985.

c) Fca c-6091 annrnved 16' to be used in Her. 28.1. V07 sh 3.

26 PROCESS CORRECTIVE ACTION REQUIRED l l YES W NO 27 RECOMMENDED DISPOSITION l l REWORK I X l SCRAP / REJECT l l REPAIR

  • l lUSE AS IS*
  • REQUIRES TECHNICAL JUSTIFICATION ATTACHED 28 ADDITIONAL INFORMATION To allow disposal of 4 x 4 x 3/16 and 4 x 4 x !c tube steel marked MCN 1060-2 to Salvage /

Sales Dept. for support of shutdown activities.

5/8/86 - Inventory identified approximately 155 of 4 x 4 tube steel marked MCN 1060-2 located at Zack Fab Shop area.

Summary - QC Hold - 3' FCR C-6093 - 36' Poseyville - 6' Inventory - 155' total - 200' 29 DISPOSITION CONCURRENCE o.E- - 8l$ 3/flAL ION ORGANIZATIdR ' DATE p CONCURRENCE DATE WE&)W ENGINEERING rk/x DATE A.N.I. (ASME) IF REQUIRED 30 DISPOSITION ACTION TAKEN ht (_ pfn%k //Af f)43R) A4cousME3 fdA m NW'& MS 0W g2.g# SED 73 SAr Ei,lSM:M62 /cA C' t2M S/M O'J'bbfC- .

31 METHOD OF DISPOSITION ACTION VERIFICATION 32 NCR CLOSED BY

{blLAtlffSNSl/ W N W A O l 'Y RESULTS OF DISPOSITION ACTION VERIFICATION , ,

s78/z

@ ACCEPTABLE l l UNACCEPTABLE g / OATE l IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR A.N.I. (ASME) DATE IF REQUIRED i QA-006 Rev 4 l

l

~

RECOM C69Y QUALITY 15 NCR NO. 11 REY.

ASSURANCE 0-00074 0 DIVISION 16 DATE ISSUED FORM QAD-1 5/12/86 NONCONFORMANCE REPORT 18 PAGE 1 0F 1 1 ITEM LOCATION QA Hold Area - Zack Fab Shop 8'-10 " So of C 2'-0" West of 8.7 Module 102B - Aux b1dg. Duct C- elevation-616'-0" 2 DRAWING OR PART NO. AND REV. 3 FART NAME 4 SERIAL NO.

M504 Sh 2 Rev 26 V4 Sh 2 Rev 7 V4 Sh 2 Rev 7/ Duct 368 Duct 368/F25744 N/A 5 ITEM DESCRIPTION HVAC Duct segment 6 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED BPCo Tech Spec OGLB 7220-M-151A (Q) Rev 15 N/A 9 INSPECTION PLAN REY. 10 ACTION ORGANIZATION

..R-5-B (Log #58) . 1.._..___ . - _ _ _ _ _ . 4AD... .._.. . - - . . _ . . . . _ . . - . . - - - - - ._

11 ACTIVITY HOLD REQUIRED: ACTIVITY HOLD ORDER NO.

YES X NO N/A 12 REQUIREMENT

1. Bechtel Technical Spec. 7220-M-151A (Q) Rev 15, paragraph 14.8.2 states in part,

" Grinding...shall not reduce the weld or base metal to below the minimum thickness required by the design."

13 NONCONFORMANCE

1. Seven (7) grinder gouges exist in duct #368 which exceed the above stated require-ments.

NOTE: This NCR is issued closed and also closes MPQAD NCR H-00336-ZZ o :ed 1-20-84.

14 NCR ORIGINATED BY ITATE

[ L Zimmerman OCm0N OF H0D NS OR SEGREAM MEA 19 HOLD TAG APPLIED v YES NO ITEMS SEGREGATED X YES NO QA Hold Area - Zack Fab Shop i

21 NEED TO REVIEW FOR j REPORTABILITY YES 3 NO DATE 7 /d 22 DETERMINED TO BE REPORTABLE 24 SECT N IEADT ASSURANCE ENGINEERING /

YES NO QA-006 Rev 4

l25 CAUSE 33 PAGE  ? 0F 1 Item inspected during fabrication stage of duct segment at Zack Fab Shop. Zack Field Engineer disposition deemed inadequate and unacceptable.

26 PROCESS CORRECTIVE ACTION REQUIRED l lYES I XX l NO 27 RECOMMENDED DISPOSITION l l REWORK [ X l SCRAP /REXIEGEX l l REPAIR

  • l lUSE AS IS*
  • REQUIRES TECHNICAL JUSTIFICATION ATTACHED 28 ADDITIONAL INFORMATION l

29 DISPOSITION CONCURRENCE e^ m Sl/WN  :=~ - Sff$f6

' DATE ION ORGANIZATION DATE CONCURRENCE ff[ W Tfl 6 ENGINEERING DATE A.N.I. (ASME) IF REQUIRED 30 DISPOSITION ACTION TAKEN Duct segment removed from QC Hold Area (Zack) and transported to Poseyville Laydown scrap area for disposal 31 METHOD OF DISPOSITION ACTION VERIFICATION 32 NCR CLOSED BY

~

RESULTS OF DISPOSITION ACTION VERIFICATION -

d -

l lYa ACCEPTABLE I l UNACCEPTABLE Q

'DATE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR A.N.I. (ASME) DATE IF REQUIRED  !

QA-006 Rev 4 j l

l

! 1

REC 03DCOPY QUALITY 15 NCR NO. 17 REY.

ASSURANCE o-00075 o DIVISION 16 DATE ISSUED FORM QAD-1 s/12/86 NONCONFORMANCE REPORT 18 PAGE 1 0F  ?

1 ITEM LOCATION

'Zack Fab Shop 2 DRAWING OR PART NO. AND REV. 3 PART NAME 4 SERIAL NO.

V09 Sh 1 Rev 7 C848 Rev 14 Flex Connection #794 F16006 N/A 5 ITEM DESCRIPTION Flexible Duct Connection 6 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED 7220-M151A(Q) Rev 19 tv:T u nu c, r'AAA nov 1a N/A 9 INSPECTION PLAN REY. 10 ACTION ORGANIZATION

_ .H5D Log.84195 0 - -- - - - - -

QAD- - - - - - - - -- _ . - - - - _ _ - - . . - - - . -

11 ACTIVITY HOLD REQUIRED: ACTIVITY HOLD ORDER NO.

l YES 2 NO N/A 12 REQUIREMENT Bechtel Tech. Spec. 7220-M151A (Q), Rev 19, Section 10, para. 1.1 states in part,

" Duct work shall be fabricated...as shown on the drawing." Bechtel Dwg. C848, Rev 14 Detail #4 " Typical flexible connection for standard or gas tight duct work installa-tion."

13 NONCONFORMANCE Dwg. C848, Rev 14, Detail #4 (Flex Connection Detail) does not contain requirement, for the construction of the longitudinal seam splice of the 30 oz. neoprene coated fiber glass cloth.

1 NOTE: This NCR vill be issued closed. It is issued to complete closure of MPQAD 1 NCR H-00472-ZZ.

14 NCR ORIGINATED 8Y N/ N

' DATE

(/JLZimmerman 19 HOLD TAG APPLIED 2 YES NO ITEMS SEGREGATED 2 YES NO QC Hold Area - Zack Fab Shop 21 NEED TO REVIEW FOR REPORTABILITY YES X NO DAT b ' N 7/ t / M 22 DETERMINED TO BE REPORTABLE 24 SECT 10 HEAD! ASSURANCE ENGINEERINC /

YES NO QA-006 Rev 4

l25 CAUSE 33 PAGE 3 0F d .

Typical flexible connection does not specify the construction of the longitudinal seam splice.

26 PROCESS CORRECTIVE ACTION REQUIRED I lYES W NO 27 RECOMMENDED DISPOSITION l l REWORK l l SCRAP / REJECT l l REPAIR

  • W USE AS IS*
  • REQUIRES TECHNICAL JUSTIFICATION ATTACHED 28 ADDITIONAL INFORMATION .

Pg 2D of 2 NCR H-00472-ZZ states that "Bechtel Project Engineering has evaluated the

  • above non conformance and dispositions _it "Use as_is" _(as shown.on pg 2C.of 2). .The _

flexible connection longitudinal seam is not a structural member and will not affect '

the duct work structurally. Refer CALC 34-38(Q) Rev 2 Dwg. M-528 Sh 1(Q) & C-848,(Q) will be revised to reflect the changes.

29 DISPOSITION CONCURRENCE Elf Ll fG> =N -

SN3l$$

ION ORGANIZATION DATE CONCURRENCE DATE LE M ENGINEERING shhc DATE A.N.I. (ASME) IF REQUIRED 30 DISPCSITION ACTION TAKEN Remove NCR tag and relocate item to shelf in storage area.

3L METHOD OF DISPOSITION ACTION VERIFICATION 32 NCR CLOSED BY Vissually witnessed relocation of item RESULTS OF DISPOSITION ACTION VERIFICATION w s/Wfs ' DATE W ACCEPTABLE l l UNACCEPTABLE Q /

IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR A.N.I. (ASME) DATE IF REQUIRED QA-006 Rev 4

!' RPOD CSPY QUALITY 15 NCR NO. 17 REY.

ASSURANCE O-00076 0 DIVISION 16 DATE ISSUED FORM QAD-1 .

5/12/86 NONCONFORMANCE REPORT 18 PAGE 1 0F 1 I

1 ITEM LOCATION Zack Fab Shop 2 DRAWING OR PART NO. AND REV. 3 PART NAME 4 SERIAL NO.

V09 Sh 1 Rev 7 C848 Rev 14 Flex Connection #293 F1608 i N/A 5 ITEM DESCRIPTION Flexible duct connection i 6 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED

~

^

  • OGLB nm cau um, 1A N/A 9 INSPECTION PLAN REY. 10' ACTION ORGANIZATION

. g5g . . - - . . .

g.. - - . . - - - qgg --.. . - - . - - . . . . - - - - .-- .-- --

ll ACTIVITT HOLD REQUIRED: ACTIVITY HOLD ORDER NO.

YES 1 NO N/A

12 REQUIREMENT

! Bechtel Tech Spec 7220-M151A(Q), Rev 19, Section 10, para 1.1 states in part, " Duct work shall be fabricated ... as shown on the drawing." Bechtel Dwg C848 Rev 14, I Detail #4 " Typical flexible connection for standard or gas tight duct work installation i

13 NONCONFORMANCE Drawing C848 Rev 14, Detail #4 (Flex connection detail) does not contain requirements for the construction of the longitudinal seam splice of the 30 oz neoprene coated fiber glass cloth.

NOTE: This NCR will be issued closed. It is issued to complete closure of MPQAD NCR H-00474-ZZ.

14 NCR ORIGINATED BY fr .

Sh/fY, I t- -W ~

pJLZimmerman / DATE 0 Lo m 0N OF H0 D TAGS OR SEGREA M AREA 19 HOLD TAG APPLIED 1 YES NO ITEMS SEGREGATED 1 YES NO QC Hold Area - Zack Fab Shop j 23 NCR EWED Y H' C WDC v 21 NEED TO REVIEW FOR REPORTABILITY YES Y NO '

DATE , <

22 DETERMINED TO BE REPORTABLE 24 SECTI %D," ASSURANCE ENGINEERING /

YES NO QA-006 Rev 4

'25 CAUSE 33 PAGE 2 0F 2 .

Typical flexible connection dons not spacify the construction of the longitudinal seam splice.

l 26 PROCESS CORRECTIVE ACTION REQUIRED l l YES R NO 27 RECOMMENDED DISPOSITION l l REWORK l l SCRAP / REJECT l l REPAIR

  • W USE AS IS*
  • REQUIRES TECHNICAL JUSTIFICATION ATTACHED 28 ADDITIONAL INFORMATION Page 2D of 2 - NCR H-00474-ZZ states that Bechtel Project Engineering has evaluated the above nonconformance and dispositions it "Use as is" (as shown on page 2C of 2).

- The flex connection longitudinal seam is- not a structural member and will not affect --

the duct work structurally. Ref CALC 34-38 (Q) Rev 2 Dwg M-528 Sh 1 (Q) and C-848(Q)

> will be revised to reflect the changes.

29 DISPOSITION CONCURRENCE 5?/d$6 -

$/2h ION ORGANIZATION / I DATE CONCURRENCE /' DATE xxcJK ENGINEERING sAgu DATE A.N.I. (ASME) IF REQUIRED 30 DISPOSITION ACTION TAKEN Remove NCR tag and relocate item to shelf in storage area.

31 OD OF DISPOSITION ACTION VERIFICATION 32 NCR CLOSED BY

~-

RESULTS OF DISPOSITION ACTION VERIFICATION

/ 4 l X l ACCEPTABLE l l UNACCEPTABLE Q / 'DATE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR A.N.I. (ASME) DATE IF REQUIRED QA-006 Rev 4 l

RE00]3 COPY QUALITY 15 NCR NO. 17 REY.

ASSURANCE o.00077 o DIVISION 16 DATE ISSUED FORM QAD-1 s/1?/A6 NONCONFORMANCE REPORT 18 PAGE 1 0F 2 1 ITEM LOCATION Zack Fab Shop 2 DRAWING OR PART NO. AND REV. 3 PART NAME 4 SERIAL NO.

F21946 V25 Sh 2 Rev 6 C848 Rev 14 Flex Connection #125 N/A 5 ITEM DESCRIPTION Flexible Duct Connection 6 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED 2GLC 7220-M151A(Q) Rev 19 N/A Dwn C848 Rev 14 9 INSPECTION PLAN REY. 10 ACTION ORGANIZATION G

__.H5 g A -- 0 -- - - QAD - - - -- - - - - --- - - - - -

11 ACTIVITY HOLD REQUIRED: ACTIVITY HOLD ORDER NO.

YES 1 NO N/A 12 REQUIREMENT Bechtel Tech Spec 7220-M151A (Q), Rev 19, Section 10, para 1.1 states in part, " Duct work shall be fabricated ... as shown on the drawing." Bechtel Drawing C848, Rev 14, Detail #4, " Typical flexible connection for standard or gas tight duct work instal-lation."

13 NONCONPORMANCE Drawing C848 Rev 14, Detail #4 (Flex connection detail) does not contain requirements for the construction of the longitudinal seam splice of the 30 oz neoprene coated fiber glass cloth.

NOTE: This NCR will be issued closed. It is issued to complete closure of MPQAD NCR H-00488-ZZ.

NCR ORIGINATED BY s

}Q (D E E p L Zimmerman AREA 19 HOLD TAG APPLIED y YES NO ITEMS SEGREGATED y YES NO QC Hold Area - Zack Fab Shop ,

3 NC I B q;jo L 2 OJG 21 NEED TO REVIEW FOR REPORTABILITY YES X NO DAT M c 77 / / EN l 22 DETERMINED TO BE REPORTABLE 24 SE HEAD, ASSURANCE ENGINEERING /

YES NO h QA-006 Rev 4 j

. I

33 PAGE 2 T)F _2 Typical flexible connaction doas not specify the construction of the longitudinal seam splice.

26 PROCESS CORRECTIVE ACTION REQUIRED l l YES I X l NO 27 RECOMMENDED DISPOSITION l l REWORK l l SCRAP / REJECT l_ _ _ _

l REPAIR

  • W USE AS IS*
  • REQUIRES TECHNICAL JUSTIFICATION ATTACHED 28 ADDITIONAL INFORMATION Page 2D of 2, NCR H-00488-ZZ states that Bechtel Project Engineering has evaluated the above nonconformance and dispositions it "Use as is" (as shown on page 2C of 2). The

~

flex connection longitud'inal seam is not a structural member and will not affect the duct work structurally. Ref CALC 34-38 (Q) Rev 2. Dwg M528 Sh 1 (Q) and C848 (Q) wil ,

be revised to reflect the changes.

29 DISPOSITION CONCURRENCE w ~

$&kb

/ DATE

:; % Sfn_/ft'.

/ '

DATE gCONCURRENCE fEDW NIONORGANIZATION ENGINEE2ING shhc DATE A.N.I. (ASME) IF REQUIRED 30 DISPOSITION ACTION TAKEN Remove NCR tag and relocate item to shelf in storage area.

31 OD OF DISPOSITJON ACTION VERIFICATION 32 NCR CLOSED BY 6 _ - __ m RESULTS OF DISPOSITION ACTION VERIFICATION

  • W g'g&

r/ ~

W ACCEPTABLE l l UNACCEPTABLE DATE IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR

[

A.N.I. (ASME) DATE IF REQUIRED QA-006 Rev 4

~

~

RECORDCOPY QUALITY 15 NCR NO. 17 REY.

. ASSURANCE Q-00079 0 DIVISION 16 DATE ISSUED FORM QAD-1 5/19/86 NONCONFORMANCE REPORT 18 PACE 1 0F 2 1 ITEM LOCATION Auxilliary building rooms 700 & 701 2 DRAWING OR PART NO. AND RM. 3 PART NAME 4 SERIAL NO.

N/A N/A N/A 5 ITEM DESCRIPTION Control Rod Drive Breakers 1&2B-91A&C and 1&2B-92B&D 6 ITEM STARTUP SYSTEM NO. 7 REFERENCE DOCUMENT 8 ASME A.N.I. REQUIRED ENFC-1 Section 3.3.2.5 N/A ENME-1 Section 3.2.2 N/A l 9 INSPECTION PLAN REV. 10 ACTION ORGANIZATION WO-600175 0

~ - - - - ~ ~

WO-600178~ -- - - ~ 0 -- U&K- ' --~ - - -

11 ACTIVITY HOLD REQUIRED: ACTIVITY HOLD ORDER NO.

YES X NO N/A 12 REQUIREMENT ENFC-1 Section 3.3.2.5 states: "If rooms 700 & 701 cannot be effectively isolated and filtered air provided, then panels 1&2B-091A&C and 162B-92B&D shall be covered with fireproof material to prevent entry of dust...a) vacuum clean interior and exterior surfaces of equipment. b) cover enclosures with a fireproof material such as polyscran or red fire blanket taking care to close seams to prevent entry of dust. Covers need not be sirtight, however, as dehumidified air shall be allowed to infiltrate at or near floor leve: ."

ENME-1 Gection 3.2.2 states: "l&2B-091, 092A-D(0) require a level A environment. Vacuum clean units and cover with firenroof material to nrevent entry of dust. An an alternate 13 NONCONE0RMANCE filtered room air may be provided."

During the inspection of work orders 22600175 & 22600178, which were issued per the Preven-tive Maintenance requirement CP-F10-160, it was discovered that the requirements above had not been implemented.

14 N R 0 IGINATED BY

- Yhb

' ITATE EFAmmersJr[

O M N OF HO W TAGS OR SEG M AREA 19 HOLD TAG APPLIED YES y NO ITEMS SEGREGATED TES y NO N/A ,

21 NEED TO REVIEW FOR b NO REPORTABILITY YES X NO DAT 3/ 1]C% 9 cf[e 22 DEIERMINED TO BE REPORTABLE 24 SE I HEAD', ASSURA(gE ENGINBfRING/

YES NO N/A N/A QA-006 Rev 4

l

- 25 CAUSE 33 PAGE 2 , OF 2 The cause of this non-conformance is the failure to issue a work order that was a '

practical and coat effective method to accomplish the work. Although the work order that was issued did cover the requirements of ENFC-1, the method chosen was imprac-tical and cost ineffective. This non-conformance is an isolated case and is not representative.

, 26 PROCESS CORRECTIVE ACTION REQUIRED l l YES R NO 27 RECOMMENDED DISPOSITION l X lREWORK l l SCRAP / REJECT l l REPAIR

  • l l USE AS IS*

CREQUIRES TECHNICAL JUSTIFICATION ATTACHED 28 ADDITIONAL INFORMATION The work required by ENFC-1 that was not implemented under the original work order, is being accomplished by supplemental work orders #22600220 and #22600221. _. .

Completion forecast: 5/23/86.

29 DISPOSITION CONCURRENCE

'\ $h0/8b W ww . $YN'hb ACTION ANIZATION / j/DATE QAD C0ffCURRENCE DATE

/V/A A///1 ENGINEERING DATE A.N.I. (ASME) IF REQUIPJiI) 30 DJSPOSITIONACTIONTAKEN fEWC,5g it/dA;K dAWLE7Eb Af' /dWA.366t?2 E.e A *'A W 2 2 4 m s.t. /.,

dhi/M f/klsNB /wwEi A4nt) Frue2. &#At$Nsratier derou.es no

& OBb'fS W 31 METHOD OF DISPOS TION ACTION VERIFICATION 32 NCR CLOSED BY

& /$ 0 W $" W YY ~~ &queprH&

RESULTS OF DISPOSITION ACTION 7ERIFICATION (W, '

sta/n ACCEPTABLE l l UNACCEPTABLE / I DATE 1 i

IF UNACCEPTABLE, REFERENCE SUPERSEDING NCR A,N.I. (ASME) DATE IF REQUIRED QA-006 Rav 4 )

I i

<-+ , - - - - - - - , - ,