ML20205C352
| ML20205C352 | |
| Person / Time | |
|---|---|
| Site: | Mcguire, Palo Verde, Indian Point, Catawba, Saint Lucie, Byron, Summer, Diablo Canyon, Callaway, Waterford, San Onofre, Comanche Peak, Rancho Seco, Midland, 05000386, 05000000, Atlantic Nuclear Power Plant, Crane |
| Issue date: | 09/23/1988 |
| From: | Grimsley D NRC |
| To: | Weissman S CALIFORNIA, STATE OF |
| Shared Package | |
| ML20204E909 | List: |
| References | |
| FOIA-88-99 NUDOCS 8810260468 | |
| Download: ML20205C352 (2) | |
Text
U.S. NUCLE AR REGULATORY COMMIS$10N uc sua tv.ast %wven s.
s
~%
Fo I A - U -9 9 ats.esi r a A
?..
[' '"' '"
c l I "'
E l
RESPONSE TO FREEDOM OF i -
/
INFORMATION ACT (FOIA) REQUEST SEfLL3J989 esee-
_ce t y i.- s...~._.-
@F l 5 5_F)g b T F V Ft/
50 - 2. 7 5 3 L 3 PART I -RECORDS RELE ASED OR NOT LOCATED (see c%cee,1 posesi No spy recoros soboct to tN rowest have been located No sod <taal agency recoros outpct to the teowest have teen beated Agency tocoros surpret to the reqwest that are centded e Appendia a o already 8.pitstre for put4< repec' n and copeng e t*e NaC Ph.c Docwwt Room.
1717 H Street. N W. W ashegton, DC Lgency reco<os subsect to the r* Quest t*Pt a o ideati'ed e Aprend.n _
. a o teeg ma3e avadatdo for publ< especton aN corv g e the NRC Pwtd.c Docwment e
F.oom, h St eet. N W. W uNn, ton. OC, e a foioe, unoet the FOt A numtee and f eawester new Thi nonpeopretary wson of the proposat:) tut you ag eed to accept e a tsaephone conve saton wth a memter of mv staN e now teeg mee s.aestae for putd.c especton and coveg at the NRC Pubac Ox6 nat Room.1717 H St'oet N W. W asNngica. OC. e a frecer undee the FOi A numt+ and ewes +er name he S RC PwbhC Docw*e4 Room. M $t eet, N W, W asNngton DC E Iceed e eforNton on how yow Ny Ot'tae access to and the Cha ges for CopyW reco'os placed en t e
Agonc, reco*os m t*ct to tre r* west a o enck> sed Any arp.catie cha se for copes of the reco os previoed and caiwt p oceo<es we noted e tre comments sectom Acconos set *ct to the request hs.e teen retened to anothe, Federal agency ++si for resca and daect cesponse to r w o
in *** of NRC a 'esponse to the request no fu thee act,on e te.ng taten on appeat eer cated r
PART 11 A-lNFORM ATION WITHHELO FROM PUBLfC DISCLOSURE Certae efxNton e tee rowested reco<ds e t+ng
- thbe'd from puouc o.scicose pwrsweat to the FO:A enemctors oescr<+4 e aM for t*e reasons stated e Pa111. see tw3 8. C. and D Any reassed AAa.s of tN oxw%ets for which ont, paq of the exord a t+ng a tamed a o t+rg made e.saatde for putd.c especton aN copyeg e the NRC Pwt4.c Doewwt Room.1717 H St eet. N W. Washegton DC. e a fo6 der unoes the FOt A numter and requeste< r.ame Comment e
M GWA W b ~E('
Gkd /tscrk Ms-oAw k
- 4 cru
]
Joedub wt; p g. g u(M
' AJ w
m
~& w.W 4 h 46 9 c4w/o?
3 koat:per.
S4% 9 et p.n e ;ma pvs e% os a L%~- *.. I m
Rio9 8;p ooO m WEISSNAN80-99 PDR NIC FOIM a64 *s" s ar
I l
Re:
F01A-88-99 APPENDIX D RELEASED RECORDS 1.
11/5/81 From D. G. Eisenhut. NRR,
Subject:
INFORMATION ITEM-POTENTIAL DEFICIENCY IN THE SEISMIC ANALYSIS OF CERTAIN PIPING SYSTEMS AT DIABLO CANYON UNITS 1 AND 2 (BOARD NOTIFICATION NO. 81-38).
(27pages) 2.
1/27/82 From D. G. Eisenhut, NRR,
Subject:
INFORMATION ITEM-PG&E SUBMITTAL OF DESIGN VERIFICATION PROGRAM-PHASE II FOR DIABLO CANYON UNIT 1 (BOARD NOTIFICATION NO. 82-06).
(1 page) 3.
6/2/82 From D. G. Eisenhut, NRR
Subject:
INFORMATION ITEMS REGARDING THE DESIGN VERIFICATION PROGRAM-PHASE I FOR DIABLO CANYON, UNIT 1, (BOARD NOTIFICATION NO. 82-53).
(4 pages) 4.
6/4/82 From D. G. Eisenhut, NRR,
Subject:
INFORMATION ITEMS REGARDING THE DESIGN VERIFICATION PROGRAM-PHASE I FOR DIABLO CANYON, UNIT 1(BOARDNOTIFICATION82-67).
(3 pages) 5.
6/18/82 From D. G. Eisenhut NRR,
Subject:
INFORMATION ITEMS REGARDING THE DESIGN VERIFICATION PROGRAM-PHASE I FOR DIABLO CANYON, UNIT 1(B0ARDNOTIFICATION82-60).
(2pages) 6.
9/24/82 From D. G. Eisenhut. NRR,
Subject:
INFORMATION ITEM-RECENT INFORMATION WITH REGARD TO SEM! SCALE TEST RESULTS (BN 82-93).
(26 pages) 7.
9/29/82 From D. G. Eisenhut NRR,
Subject:
INFORMATION ITEMS REGARDING THE DESIGN VERIFICATION PROGRAM FOR DIABLO CANYON, j
UNIT 1 (BN 82-97).
(3 pages) 8.
1/7/83 From D. G. Eisenhut, NRR,
Subject:
INFORMATION ITEM-APPARENT J
DEFICIENCIES IN MIDLAND-ROSS "SUPERSTRUT" MATERIAL USED FOR l
CLASS 1E CABLE TRAY AND CONDUCT SUPPORT (BOARD NOTIFICATION NO. 83-02).
(2 pages) 9.
3/4/83 From D. G. Eisenhut, NRR,
Subject:
BOARD NOTIFICATION 83-27 ADDITIONAL RFLAP-5 CALCU'_ATION FOR SEMISCALE S-SR-2 TEST.
(17 pages)
'I2/83 From D. G. Eisenhut, NRR,
Subject:
UNANALYZED REACTOR VESSEL THERMAL STREE DURING C00LDOWN (B0ARD NOTIFICATION # BN-83-42).
(2 pages) 11.
10/14/83 From D. G. Eisenhut. NRR,
Subject:
INFORMATION ITEM REGARDING i
THE DIABLO CANYON NUCLEAR POWER PLANT (BOARD NOTIFICATION NO.83-158).
(2 pages)
I i
I i