ML20205C352

From kanterella
Jump to navigation Jump to search
Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR
ML20205C352
Person / Time
Site: Mcguire, Palo Verde, Indian Point, Catawba, Saint Lucie, Byron, Summer, Diablo Canyon, Callaway, Waterford, San Onofre, Comanche Peak, Rancho Seco, Midland, 05000386, 05000000, Atlantic Nuclear Power Plant, Crane
Issue date: 09/23/1988
From: Grimsley D
NRC
To: Weissman S
CALIFORNIA, STATE OF
Shared Package
ML20204E909 List:
References
FOIA-88-99 NUDOCS 8810260468
Download: ML20205C352 (2)


Text

U.S. NUCLE AR REGULATORY COMMIS$10N uc sua tv.ast %wven s.

s

~%

Fo I A - U -9 9 ats.esi r a A

?..

[' '"' '"

c l I "'

E l

RESPONSE TO FREEDOM OF i -

/

INFORMATION ACT (FOIA) REQUEST SEfLL3J989 esee-

_ce t y i.- s...~._.-

@F l 5 5_F)g b T F V Ft/

50 - 2. 7 5 3 L 3 PART I -RECORDS RELE ASED OR NOT LOCATED (see c%cee,1 posesi No spy recoros soboct to tN rowest have been located No sod <taal agency recoros outpct to the teowest have teen beated Agency tocoros surpret to the reqwest that are centded e Appendia a o already 8.pitstre for put4< repec' n and copeng e t*e NaC Ph.c Docwwt Room.

1717 H Street. N W. W ashegton, DC Lgency reco<os subsect to the r* Quest t*Pt a o ideati'ed e Aprend.n _

. a o teeg ma3e avadatdo for publ< especton aN corv g e the NRC Pwtd.c Docwment e

F.oom, h St eet. N W. W uNn, ton. OC, e a foioe, unoet the FOt A numtee and f eawester new Thi nonpeopretary wson of the proposat:) tut you ag eed to accept e a tsaephone conve saton wth a memter of mv staN e now teeg mee s.aestae for putd.c especton and coveg at the NRC Pubac Ox6 nat Room.1717 H St'oet N W. W asNngica. OC. e a frecer undee the FOi A numt+ and ewes +er name he S RC PwbhC Docw*e4 Room. M $t eet, N W, W asNngton DC E Iceed e eforNton on how yow Ny Ot'tae access to and the Cha ges for CopyW reco'os placed en t e

Agonc, reco*os m t*ct to tre r* west a o enck> sed Any arp.catie cha se for copes of the reco os previoed and caiwt p oceo<es we noted e tre comments sectom Acconos set *ct to the request hs.e teen retened to anothe, Federal agency ++si for resca and daect cesponse to r w o

in *** of NRC a 'esponse to the request no fu thee act,on e te.ng taten on appeat eer cated r

PART 11 A-lNFORM ATION WITHHELO FROM PUBLfC DISCLOSURE Certae efxNton e tee rowested reco<ds e t+ng

  • thbe'd from puouc o.scicose pwrsweat to the FO:A enemctors oescr<+4 e aM for t*e reasons stated e Pa111. see tw3 8. C. and D Any reassed AAa.s of tN oxw%ets for which ont, paq of the exord a t+ng a tamed a o t+rg made e.saatde for putd.c especton aN copyeg e the NRC Pwt4.c Doewwt Room.1717 H St eet. N W. Washegton DC. e a fo6 der unoes the FOt A numter and requeste< r.ame Comment e

M GWA W b ~E('

Gkd /tscrk Ms-oAw k

  1. 4 cru

]

Joedub wt; p g. g u(M

' AJ w

m

~& w.W 4 h 46 9 c4w/o?

3 koat:per.

S4% 9 et p.n e ;ma pvs e% os a L%~- *.. I m

Rio9 8;p ooO m WEISSNAN80-99 PDR NIC FOIM a64 *s" s ar

I l

Re:

F01A-88-99 APPENDIX D RELEASED RECORDS 1.

11/5/81 From D. G. Eisenhut. NRR,

Subject:

INFORMATION ITEM-POTENTIAL DEFICIENCY IN THE SEISMIC ANALYSIS OF CERTAIN PIPING SYSTEMS AT DIABLO CANYON UNITS 1 AND 2 (BOARD NOTIFICATION NO. 81-38).

(27pages) 2.

1/27/82 From D. G. Eisenhut, NRR,

Subject:

INFORMATION ITEM-PG&E SUBMITTAL OF DESIGN VERIFICATION PROGRAM-PHASE II FOR DIABLO CANYON UNIT 1 (BOARD NOTIFICATION NO. 82-06).

(1 page) 3.

6/2/82 From D. G. Eisenhut, NRR

Subject:

INFORMATION ITEMS REGARDING THE DESIGN VERIFICATION PROGRAM-PHASE I FOR DIABLO CANYON, UNIT 1, (BOARD NOTIFICATION NO. 82-53).

(4 pages) 4.

6/4/82 From D. G. Eisenhut, NRR,

Subject:

INFORMATION ITEMS REGARDING THE DESIGN VERIFICATION PROGRAM-PHASE I FOR DIABLO CANYON, UNIT 1(BOARDNOTIFICATION82-67).

(3 pages) 5.

6/18/82 From D. G. Eisenhut NRR,

Subject:

INFORMATION ITEMS REGARDING THE DESIGN VERIFICATION PROGRAM-PHASE I FOR DIABLO CANYON, UNIT 1(B0ARDNOTIFICATION82-60).

(2pages) 6.

9/24/82 From D. G. Eisenhut. NRR,

Subject:

INFORMATION ITEM-RECENT INFORMATION WITH REGARD TO SEM! SCALE TEST RESULTS (BN 82-93).

(26 pages) 7.

9/29/82 From D. G. Eisenhut NRR,

Subject:

INFORMATION ITEMS REGARDING THE DESIGN VERIFICATION PROGRAM FOR DIABLO CANYON, j

UNIT 1 (BN 82-97).

(3 pages) 8.

1/7/83 From D. G. Eisenhut, NRR,

Subject:

INFORMATION ITEM-APPARENT J

DEFICIENCIES IN MIDLAND-ROSS "SUPERSTRUT" MATERIAL USED FOR l

CLASS 1E CABLE TRAY AND CONDUCT SUPPORT (BOARD NOTIFICATION NO. 83-02).

(2 pages) 9.

3/4/83 From D. G. Eisenhut, NRR,

Subject:

BOARD NOTIFICATION 83-27 ADDITIONAL RFLAP-5 CALCU'_ATION FOR SEMISCALE S-SR-2 TEST.

(17 pages)

'I2/83 From D. G. Eisenhut, NRR,

Subject:

UNANALYZED REACTOR VESSEL THERMAL STREE DURING C00LDOWN (B0ARD NOTIFICATION # BN-83-42).

(2 pages) 11.

10/14/83 From D. G. Eisenhut. NRR,

Subject:

INFORMATION ITEM REGARDING i

THE DIABLO CANYON NUCLEAR POWER PLANT (BOARD NOTIFICATION NO.83-158).

(2 pages)

I i

I i