Category:CORRESPONDENCE-LETTERS
MONTHYEARML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20248D6521989-07-20020 July 1989 Forwards Response to Util Re Bills D0184 & D0185 for Plant OL Application Review Costs by Various Program Ofcs Through June 1984 ML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20205C3521988-09-23023 September 1988 Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20237B4361987-12-14014 December 1987 Final Response to FOIA Request for Documents.App B Document, Board Notification 84-024,encl & Also Available in PDR ML20236X6141987-12-0808 December 1987 Final Response to FOIA Request All Documents.No Addl Records Subj to Request Located ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20235B3081987-09-21021 September 1987 Responds to FOIA Request for Documents,Including AEC to ACRS Forwarding Safety Evaluation Re Zimmer.App a Documents Cannot Be Located.App B Documents in Pdr.App C & D Documents Withheld (Ref 10CFR2.790) ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20235K1731987-07-0909 July 1987 Partial Response to FOIA Request for Info Re Certain Contracts Awarded by NRC for Reporting Svcs.Forwards App a & B Documents.Documents Also Available in PDR ML20234F0911987-06-26026 June 1987 Responds to Appeal Re Denial of FOIA Request for Documents. Forwards Document 5 in App F.Portions of Document 5 Withheld (Ref FOIA Exemptions 6 & 7).Other Requested Documents Withheld (Ref FOIA Exemption 6) ML20215K1981987-06-19019 June 1987 Final Response to FOIA Request for Documents Re Allegations Concerning Plant.Forwards App G & H Documents.Documents Also Available in Pdr.App H Documents Partially Withheld (Ref FOIA Exemption 6) ML20213F9351987-05-0808 May 1987 Partial Response to FOIA Request.Forwards App F Document & Weld Allegations.App G Documents Partially Withheld (Ref FOIA Exemption 6) ML20206H4951987-04-13013 April 1987 Partial Response to FOIA Request for Documents Re Bechtel Employment Discrimination.Forwards App E Documents.App D Documents Withheld (Ref FOIA Exemption 6) ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20211A9531987-02-13013 February 1987 Advises That Financial Info Submitted for 1987 in Util Satisfies Requirements of 10CFR140.21 That Each Licensee Maintain Guarantee of Payment of Deferred Premiums for Operating Reactors Over 100 Mwe ML20212M7651987-01-16016 January 1987 Informs That Due to Demands on Staff,Nrc Will Respond by 870430 to 850607 Request for Review of Invoices D0184 & D0185 Re OL Application Review Costs Through 840623 ML20207C0151986-12-19019 December 1986 Forwards Notice of Withdrawal of Application for OLs & Termination of Proceeding,Per Util 860711 Request & ASLB 861217 Memorandum & Order Granting Motion ML20207C1191986-12-18018 December 1986 Forwards Order Terminating CPPR-81 & CPPR-82 Based on Fact That Const of Facility Ceased,Units Inoperable & Site Environmentally Stable,Per Util 860701 Request to Withdraw Application to Amend CPs ML20215B9641986-12-0505 December 1986 Notifies Util of 870204-05 Early Emergency Responders Workshop in Chicago,Il to Discuss Lessons Learned & Current Problems in Coordination & Integration of Emergency Response Efforts.Meeting Agenda & Preregistration Form Encl ML20214Q0911986-11-24024 November 1986 Partial Response to FOIA Request for Documents Re Ofc of Inspector & Auditor Investigations.Forwards App B Documents. Documents Also Available in PDR ML20214A0761986-11-14014 November 1986 Forwards Insp & Evaluation of Plant for Adequacy of Stabilization Plan,Documenting 861015-16 Site Insp & Review & Insp of Site Stabilization Rept.Environ Stabilization Satisfactory ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20215M8851986-10-28028 October 1986 Forwards Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.No Violations Identified ML20211B5401986-10-0909 October 1986 Further Response to FOIA Request for Eight Categories of Documents Re Ee Kent Allegations Concerning Facilities. Forwards Documents Listed in App K ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20209E6621986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR IA-86-235, Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR1986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR ML20212K9061986-08-21021 August 1986 Forwards Request for Addl Info Re Environ Review of Util 860711 Request to Withdraw Applications for OL by 860828 ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20203B2351986-07-10010 July 1986 Informs That Review of 820622 Application to Receive Unirradiated Nuclear Fuel Assemblies Terminated,Per .Fission Chambers Should Be Disposed of & Licenses SNM-1904 & SNM-1905 Terminated,Per 10CFR70.38(b) ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203Q2891986-05-0606 May 1986 Forwards BNL Technical Rept, Surveillance & Maint..., Based on NRC 851014-18 Insp.No Violations Noted.Items Identified Could Have Impact on Later Project Restart. Evaluation of Rept Recommendations Requested within 60 Days ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued 1997-03-31
[Table view] Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC
MONTHYEARML20133H8841985-09-16016 September 1985 Discusses Ee Kent Allegations Re Plant,Per Encl . Decision Reflected in NRC Should Be Reconsidered. B Garde & T Devine of Gap Unwilling to Testify for Kent.Kent & Counsel Unable to Produce Expert Witnesses ML20133H9201985-05-0909 May 1985 Discusses Ee Kent Allegations Re Quality of Engineering & Const at Plant.Region III Could Quickly Dispose of Matters Held Open in NRC .Meeting to Facilitate Closure Suggested ML20095E2211984-08-0707 August 1984 Forwards Minutes of Monthly Third Party Assessment 840712 Meeting Re Status of Independent Assessment of Underpinning & Remedial Soils Work & Status of Const Implementation Overview Program ML20093H6381984-07-24024 July 1984 Solicits Support in Resolution to Call Public,Congress & Administration Attention to Concern Over Impending Electricity Shortage Due to Unnecessary Cancellations of near-term Plants Under Special Interest Group Pressure ML20090G1971984-07-18018 July 1984 Forwards Draft Topical Rept B-84-148, Idcvp:Control Room HVAC Sys Performance Requirements ML20093J5901984-07-18018 July 1984 Forwards Const Implementation Overview Weekly Rept 57 for 840709-13 ML20093E0781984-07-0606 July 1984 Forwards Const Implementation Overview Weekly Rept 55 for 840625-29 ML20095E2591984-07-0303 July 1984 Forwards Independent Assessment of Underpinning Weekly Rept 93 for 840624-0630.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering,Const & QA Personnel Encl ML20095E3051984-07-0202 July 1984 Forwards Const Implementation Overview Weekly Rept 54 for 840618-22.Rept Includes Summary of Activities & Open Items, Nonconformance Identification Repts & Hold Points ML20093A4091984-07-0202 July 1984 Forwards Summary of 10th General Status Review 840621 Meeting in Ann Arbor,Mi on Confirmed Items & Findings Re Idcvp ML20095E2451984-06-27027 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 92 for 840617-0623.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering Const & QA Personnel Encl ML20092P3621984-06-26026 June 1984 Notifies That 840619 Meeting Re Idcvp Rescheduled for 840628 in Ann Arbor,Mi to Discuss Civil/Structural Confirmed Items ML20092H5461984-06-22022 June 1984 Forwards Rev 5 to Project QA Plan, CPC Midland Idcvp. Signed Document Ack Requested by 840702 ML20095E2891984-06-22022 June 1984 Forwards Const Implementation Overview Weekly Rept 53 for 840611-15.Rept Includes Summary of Activities & Open Items, Nonconformance Identification Repts & Hold Points ML20095E2291984-06-20020 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 91 for 840610-16.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering,Const & QA Personnel Encl ML20092C3021984-06-18018 June 1984 Forwards Nonconformace Identification Rept 037 Re Orientation & Configuration of Support in Hanger Sketch ML20092C4021984-06-14014 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 90 for 840603-09 ML20092C9451984-06-14014 June 1984 Forwards Const Implementation Overview Weekly Rept 52 for Wk of 840604-08 ML20092A5641984-06-12012 June 1984 Forwards Info Re Closed Const Implementation Overview Item 080 Re Certified Personnel Not Listed in Available Certifications ML20095E2751984-06-0808 June 1984 Forwards Const Implementation Overview Weekly Rept 51 for 840528-0601.Rept Includes Summary of Activities & Open Items,Nonconformance Identification Repts & Hold Points ML20091M8761984-06-0707 June 1984 Forwards Open Const Implementation Overview Item 087 Re Liquid Penetrant Exam on Welds ML20091N3251984-06-0707 June 1984 Forwards Const Implementation Overview Nonconformance Identification Rept Nir 023 Re Work Print Station 209,for Info ML20092C9731984-06-0606 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 89 for 840527-0602 & Minutes of Daily Meetings ML20091Q8271984-06-0606 June 1984 Forwards Signed Affidavit & Resumes for Mj Huss & Je Walker. Huss & Walker Assigned to Const Implementation Overview Staff ML20091R6611984-06-0606 June 1984 Forwards Const Implementation Overview Weekly Rept 50 for 840521-25 ML20091J8471984-06-0404 June 1984 Forwards Const Implementation Overview Item/Hold Point Notification Forms for Items 072 & 073 Re ANSI N45.2, Section 7 & B&W QA Manual,Rev 3,respectively ML20091L0321984-06-0404 June 1984 Forwards Resumes & Statements of Independence for Jm Hendrie,Jm Biggs & JW Stanley to Conduct Idcvp ML20091N0281984-06-0404 June 1984 Forwards Closed Const Implementation Overview Item 060 Re Site Auditing ML20091N0421984-06-0404 June 1984 Forwards Closed Const Implementation Overview Nonconformance Identification Repts 022 & 027 ML20091N8001984-06-0101 June 1984 Forwards Closed Const Implementation Overview Items 070 & 086 Re Status Assessment Process & Nonconformance Identification Repts 022 & 023,respectively ML20091J8521984-05-31031 May 1984 Forwards Const Implementation Overview Weekly Rept 49 for 840514-18 ML20091H3931984-05-29029 May 1984 Forwards Open Const Implementation Overview Item 082/hold Point Notification.Audit Forms/Checklists Incomplete & Some Criteria of 10CFR50,App B Not Audited ML20091E7191984-05-24024 May 1984 Forwards Closed Nonconformance Identification Rept 019 Re Fddl Printouts Including Error in Unsolicited Drawings ML20091A2061984-05-23023 May 1984 Notifies of Idcvp 840531 Meeting W/Util & Bechtel in Ann Arbor,Mi to Discuss Status of Response to SEP Confirmed Items & to Obtain Info Re Standby Electric Power Sys Performance Requirements Review,Per 840530-0601 Visit ML20091E5051984-05-23023 May 1984 Forwards Closed Const Implementation Overview Item 063 Re Use of Fsk Prints Not Marked Status Assessment Print or W/Expiration Date ML20091J0021984-05-23023 May 1984 Informs That Tera Personnel Will Meet W/Bechtel in Ann Arbor,Mi on 840530-0601 to Discuss Idcvp Progress & Items Re Standby Electric Power Sys Performance Requirements Review ML20091N8801984-05-22022 May 1984 Forwards Independent Assessment of Underpinning Weekly Rept 87, for Wk of 840513-19 ML20092A6691984-05-22022 May 1984 Forwards 840510 Meeting Minutes Re Status of Independent Assessment of Underpinning & Remedial Soils Work ML20091E0691984-05-22022 May 1984 Forwards Tracked Action Item 086 Re Nir 022 & Nir 023. Requests One Reply Clarifying Initial Findings.Current Replies Provide Inaccurate & Conflicting Info ML20091E7521984-05-22022 May 1984 Forwards Closed Const Implementation Overview for Item 059 Re Failure to Maintain Audit Repts ML20091G9611984-05-22022 May 1984 Forwards Minutes of 840510 Meeting Re Third Party Assessment Activities Concerning Underpinning & Remedial Soils Work ML20091B4141984-05-21021 May 1984 Forwards Const Implementation Overview (Cio) Weekly Rept 48 for 840507-11.Rept Includes Summary of Cio Activity,Open Items,Nonconformance Identification Rept Summary & Hold Points ML20091B0711984-05-18018 May 1984 Forwards Const Implementation Overview Nonconformance Identification Rept 025 Re Inprocess Evaluation of Documents Received at Station 219.Item Closed ML20091C5691984-05-18018 May 1984 Forwards Open Const Implementation Overview/Hold Point Notification 085.Asterisked Items May Impact Phase I/Phase II Release ML20091J7711984-05-17017 May 1984 Forwards Open Const Implementation Overview Item 084 Re Verification of Quality Verification Program Activities in Module 800 E-G ML20091J7721984-05-17017 May 1984 Forwards Closed Const Implementation Overview Nonconformance Identification Repts 026 & 024 Re Deficiencies in Drawings, Including Rev 13 to Drawing C-130,Rev 7 to Drawing C-224, Drawing A-871 & Rev 17 to Drawing C-898 ML20091J9331984-05-17017 May 1984 Forwards for Action/Info,Const Implementation Overview Item 083 Hold Point Notification Re Noting on Visible Portion of Cable,Portion of Cable Not Inspected & Reason Why Cable Not Inspected ML20091C5021984-05-17017 May 1984 Forwards Independent Assessment of Underpinning Weekly Rept 86 for 840506-12.Minutes of Daily Meetings Encl ML20084R3661984-05-17017 May 1984 Forwards Open Nonconformance Identification Rept 033 Re Svc Water Pumphouse ML20090K5251984-05-16016 May 1984 Forwards Midland Nuclear Plant Units 1 & 2 Idcvp,Twelfth Monthly Status Rept for 840401-30.Next Ocr/Finding Status Review Meeting Will Be Held in mid-June.Meeting Notice & Agenda to Be Issued When Meeting Scheduled 1985-09-16
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20216E4721987-05-28028 May 1987 Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued ML20197F8331986-04-28028 April 1986 Advises That Response to Generic Ltr 86-04 Re Engineering Expertise on Shift Inapproriate at Present Because Midland Not Currently Under Const.Commitment to Provide Info Will Be Added to Commitment Tracking Sys ML20210L2351986-04-25025 April 1986 Forwards ALAB-106 Monthly Rept for Mar 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20203K8531986-04-23023 April 1986 Responds to NRC Re Allegation Concerning Adequacy of Pipe Whip Restraint Design.Project Records Placed in Storage & Personnel Performing Work Dispersed.Specific Design Approach Would Require Check of Records at Bechtel ML20203P1661986-04-21021 April 1986 Discusses 860407 Study Considering Options for Facility. Options Range from Abandonment of Facility to Completion as Nuclear Plant.Conversion of Plant to Combined Cycle gas-fired Plant Chosen as Most Favorable Option ML20209E6531986-03-28028 March 1986 FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order ML20140F8781986-03-25025 March 1986 Forwards ALAB-106 Monthly Rept for Feb 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20154H9651986-02-25025 February 1986 Forwards Nonconformance Repts Written or Closed During Jan 1986,per Memorandum & Order ALAB-106 ML20154D3581986-02-24024 February 1986 Confirms Items Agreed Upon in 860219 Telcon Re soil-related Issues.Util Will Discontinue Monitoring Dike Groundwater Wells During Shutdown & Site Maint.Authorization Given to Seal Weeping Wall Crack ML20198H2401986-01-24024 January 1986 Forwards ALAB-106 Monthly Rept for Dec 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20136F4771985-12-31031 December 1985 Forwards PNL-5718, Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20138Q5531985-12-31031 December 1985 Submits ALAB-106 Quarterly Rept 50.No New Individuals Assigned quality-related Duties Since 850930 Rept & No Const Activities Projected for Jan-Mar 1986 ML20136C5711985-12-20020 December 1985 Forwards Monthly Rept for Nov 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts,Quality Audit Findings,B&W Repts of Nonconformity & Util Nonconformance Repts,Per ALAB-106 ML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20137Z1481985-11-27027 November 1985 Advises That Response to 851029 IE Bulletin 85-001, Steam Binding of Auxiliary Feedwater Pumps, Inappropriate at Present Since Plant in Surveillance & Maint Status.Schedule for Response Will Be Provided When Status Changes ML20137F2541985-11-25025 November 1985 Forwards ALAB-106 Monthly Rept for Oct 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings,Per 730323 Order ALAB-106 & Amend 1 to Cp.Svc List Encl ML20138J4431985-10-25025 October 1985 Forwards Monthly Rept for Sept 1985,per Memorandum & Order ALAB-106 & Amend 1 to Cp,Including Bechtel Nonconformance Rept,Quality Action Requests,Mgt Corrective Action Repts, Quality Audit Findings & B&W Repts of Nonconformity ML20138D0031985-10-14014 October 1985 Informs That Util Will Submit Schedule for Meeting Requirements of 10CFR50.62(d) Per Generic Ltr 85-06 Re QA Guidance for ATWS nonsafety-related Equipment When & If Project Reactivated ML20133F7581985-10-0808 October 1985 Informs of Plans to Physically Disable Equipment Installed in & About Evaporator Bldg to Serve Process Steam to Dow Chemical Co,Per 850925 Resolution.Equipment & Structures Abandoned Are non-Q.Related Correspondence ML20137Y7921985-09-30030 September 1985 Submits Quarterly Rept 49,per ALAB-106.No New Individuals Assigned to quality-related Duties.Const at Plant Shut Down on 840716.No Const Projected for Fourth Quarter 1985.Next Quarterly Rept Will Be Submitted by End of Dec 1985 ML20133A3141985-09-27027 September 1985 Forwards Review of Section 4.7 of Technical Evaluation Rept PNL-5600, Review of Resolution of Known Problems in Engine Components for Tdi Emergency Diesel Generators, Reflecting Views Re Crankshafts for 16-cylinder Engines ML20133H1261985-09-25025 September 1985 Forwards Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings Written or Closed During Aug 1985,per Condition of Memorandum & Order ALAB-106 ML20138S0731985-09-17017 September 1985 Advises That Addl Excavation Between Tank Farm & Auxiliary Bldg Will Be Conducted Per NRC 850826 Authorization. Excavation Needed to Provide Supplemental Cathodic Protection.Svc List Encl.Related Correspondence ML20133H8841985-09-16016 September 1985 Discusses Ee Kent Allegations Re Plant,Per Encl . Decision Reflected in NRC Should Be Reconsidered. B Garde & T Devine of Gap Unwilling to Testify for Kent.Kent & Counsel Unable to Produce Expert Witnesses ML20140G8331985-08-23023 August 1985 FOIA Request for ACRS Documents Re Facility ML20137F7061985-08-12012 August 1985 Forwards Listed Documents Written or Closed During Jul 1985, in Accordance w/730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Only Nonconformance Repts Encl ML20133L8331985-08-0909 August 1985 Forwards Attachment 1 to Revised Exhibit D of Revised Compliance Filing & Application for Authorization to Issue Securities.Plan Is Requirement of Agreements W/Banks to Restructure Outstanding Debt.Related Correspondence ML20132B1841985-07-19019 July 1985 Forwards Monthly Repts for May & June 1985 Per Condition of 730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Related Correspondence 1989-04-28
[Table view] |
Text
.
i l STONE & WEBSTER MICHIGAN, INC.
P.O. box 2325. BOSTON. MASSACHUSETTS 02107 j.
HfRINCIPAL STAFF cM.%6; ?kP ;
D/RA OE
- >c DRMA' hpo '
SCS &f Q ML -
Mr. J. G. Keppler, Administrator, Region III y : File,} g gg, ggg4 Nuclear Regulatory Commission 799 Roosevelt Road J.0. No. 14509 Glen Ellyn, Illinois 60137 SWM-064
- Docket No. 50-329/330 CIO Weekly Report No. 41 Construction Implementation Overview Midland Nuclear Power Plant The Construction Implementation Overview (CIO) Weekly Report Number 41, for the period March 19, 1984 through March 23, 1984, is enclosed.
This report includes a summary of CIO activities for the week and open Items, NIRs, and Hold Points.
M 4 J. E. Karr
, CIO Program Manager Enclosures JEK:NL CC" DLQuamme, CPCo Midland (site)
NIReichel, CPCo Midland (site)
RAWells, CPCo Midland (site)
JJHarrison, US NRC Glen Ellyn, IL RJCook, US NRC Midland (site)
Public Document Room 84060 PDR g 7 j4MPDR h -
.G. 3$
l
)
Stone & Webster Michigan, Inc.
CONSTRUCTION IMPLEMENTATION OVERVIEW
- CIO -
WEEKLY REPORT NUMBER 41 PERIOD - March 19, 1984 through March 23, 1984 Contents Page
, I.
0verview........................................ 1 II. Act i v ity Sunma ry. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
- III. Activity Details................................ .
2 IV. Ge ne ra l . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 V. Attachments..................................... 6 A. CIO Item Summary B. Hold Point Summary C. Nonconformance Identification Report (NIR) Summary D. Meeting Summary VI. ~ Exhibits-t
- 1. CCP Phase I Activity '
i 400-001A
CIO REPORT NUMBER 41 s
I. '0VERVIEW "During this reporting period, Status Assessment (S/A), Quality Verification Program (QVP) and Hanger Reinspection Program (HRP) activities continued. 1 Activity levels continue to increase steadily as personnel are added and the number of modules and commodities being statused or verffled increases.
Exhibit 1 to this report identifies the modules presently available for Construction Completion Program (CCP) Phase I activity and the ongoing work, by discipline, for S/A, QVP and HRP during this reporting period.
It should be noted that the HRP referenced above is, programmatically, not a part of the CCP. However, for purposes of CIO reporting, HRP activities '
have been and will continue to be reported under the general topic of the '
, CCP. This is to provide a clear understanding of the full scope of activity underway in the plant at a given time and should provide a more complete presentation of the results of CIO assessments than would be available if this item were addressed separately.
The principal effort of CIO continues to be the ongoing assessment of CCP Phase I activity. Aside from CIO Item Number 063.(see CIO Report Number 40)-
! field activity continues in a satisfactory manner and in_ accordance with
- procedures.
CIO is continuing to follow the program integration activity i
for CCP which will be discussed further in Section III of this report.
In addition to CCP related assessments, during this reporting period CIO devoted signfficant time to the continuing evaluation of document control,
'400-001A.
Page 2 of 6 the activities of Zack and B&W and to the SSI Program of Mark Technologies Corporation (MTC). Th'ese, as well as other CID activities which required a lower level of effort, are, summarized in Section II below and details are provided in Section III.
II. ACTIVITY
SUMMARY
A. CCP Activity Monitoring B. Document Control Assessments C. Training Program Evaluation D. Diesel Generator Program Follow-up E. Zack Weld Evaluation F. Spatial Systems Interaction Program (SSIP) Review G. B&W ASME Program Assessment l
H. NRC Commitment List Follow-up .
, I. Attendance at Various Site Meetings
- J. CIO Action to Close Out Items and NIR's as Responses are Received III. ACTIVITY DETAILS (Para]raphs Correspond to Items in 'Section II)
. _A. CIO overviewed the CCP activity underway in each active module during this reporting period. In conducting this overview, CIO continued our previously reported practice of reviewing planning eff0"ts, working
( documents and personnel qualifications, witnessing work in. progress 7
and following the processing of resultant documentation.. During.this l period, the activities overviewed by CIO continued.t'obe' performed in i
a satisfactory manner. Overall, CIO. concludes that .ttje personnel performing 'CCP activity are conscientiously and rigorously "following i
1400-001A
Page 3 of 6 procedural requirements in executing their assigned tasks. I
. CIO continues ~ to follow the program integration efforts of CPCo and BPCo. These include the updating of the Ma~terial, Labor. Cost and
, Schedule (MLCS) data base, identification of work scopes and statusing of work completion. Progress in each of these areas has been noted and resolution of CIO concerns is attainable. CIO will continue to monitor this activity closely as it is an important element of the transition from Phase I to Phase II.
t i B. During this period, CIO initiated an evaluation of document control activities at the Field Document Control Center (FDCC) and at those i
stations which are being prepared for future activation as reported in CIO Report Number 37. These are presently identified as stations numbered 209, 219, 309, 501 and 503. This evaluation is being conducted as an in-process review of the short and long term corrective ' actions provided to CIO in response to CIO Item Number 043.
1 Additionally, the document control concerns expressed to CIO by a CPCo I '
employee are encompassed.- Discrepancies identified- during this reporting period are detailed on CIO NIR's 022, 023 and 024.
acompletion of the evaluation and final results are expected next week.
C. CIO attended and evaluated the following training classes:
Verification of Electrical Raceways and Supports (FIE-9.009)_
Field Fabrication, Repair and Erection of Structural Steel and Miscellaneous Material (Specification C-304C)
!~
w 400-001A' a;
Page 4 of 6 Identification and Marking of Embeds Affected by Anchor Bolt Proximity Requirements (FIC-7.000)
The training was conducted in an effective manner and in accordance with Procedure FPG-2.000 (Re: Checklists numbered MP-MIS-035E-020, 021 and 022). .
Additionally, CIO reviewed, evaluated and accepted the CPCo response to CIO Item Number 056 and subsequently closed this item.
D. CIO is continuing to 'ollow progress in the Diesel Generator Installation Program. Activities in this area continue to be -
performed satisfactorily. One area has been identified as a potential problem. The description of the interrelationship,.between MPQAD and BPCo for QA/QC activities or ASME related work needs to be clearly defined with respect to procedural control and code responsibility and authority. This will be documented in CIO Item Number 069.
C. 'CIO initiated evaluations of the Zack welding program in the control room during this period. In-process work in the control room was observed as well as related activities. This evaluation will continue and should be completed in 2 to 3 weeks. No discrepancies have been identified to date.
~
F. During this reporting period, CIO continued monitoring. the SSIP.
Currently, MTC has completed the initial system -walkdgwns and is engaged in evaluation of the Interaction Identification Sheets (IIS)
^
a 400-001A
Page 5 of 6 which were prepared during the walkdowns. Final walkdowns are not scheduled to begin until 1985. CIO has minor procedural questions
~
remaining relative to the SSIP which will be addressed and resolved during April, 1984. With the resolution of these items, CI0's evaluation is that the initial phase of the SSIP was conducted satisfactorily, in a thorough manner ahd in accordance with requirements. Once resolution is obtained, CIO intends to close out SSIP related activity until the final walkdown program commences.
G. CIO is continuing our evaluation of the B&W ASME III Installation Program. One CIO Item (Number 068) has been fo'rwarded to CPCo as of this date. This item requests resolution of an apparent inconsistency in ASME code effective editions and addenda relative to installation of ASME component supports. No new items have been identified as 4
concerns beyond those reported in CIO Report Number 40. Further review of those concerns and further evaluation of other program docunents and activities are progressing.
H. CIO continued to monitor. progress in the consolidation of NRC cannitments into the Correspondence and Commitment Management System.
l CPCo Site Management Office has validated their portion of CCP related commitments and forwarded them to CPCo Licensing for incorporation in l :the overall program. 0verall progress is continuing satisfactorily.
l 1. CIO attended those site meetings summarized in Attachment D to this I
report.
400-001A ,
Page 6 of 6 J. Activity related to CIO Items, Hold Points and NIR's is summarized in Attachments A, B and C respectively. '
- IV. ' GENERAL A. CIO staffing remained at 33 during this reporting period.
I V. ATTACHMENTS -
A .* - CIO Item Summary B. CIO Hold Point Summary C. CIO NIR Summary D. Meeting Summary 5
9 e
S*
. l
'400-001A
_ _ _ . _ _ _ _ . _ _ . _ _ _ _ . _ _ _ _ _ .m .__ _ _ _
. STONE 8. WEBSTER MICHIGAN, INC.
NOTES: 1. ( identifies changes from previous report
. CONSTRUCTION IMPLEMENTATION OVERVIEW
- 2. Closed items will be identified in the report for the MIDLAND NUCLEAR C0 GENERATION PLANT week of closure and dropped from further reporting ,
CIO ITEM SUPMARY Classifi-cation Description. Open CPCo Response Closed '
- Document /Date Document /Date Remads.
' Document /Date 330 Tracked Need to review Vendor Equipment Report No. 5 Action. Verification Program - MPQAD/SMO 7/18/83 t D37 Tracked CIO observed that two boards with Report No. 24 /
Action protruding nails lying in Cable Tray 11/29/83 Partial response \
1AKA019 (Q Tray) had punctured the (CSC 7244 dated cable jacket of a "Q" cable. The 1/27/84) accept- ,
cable is Q-Channel A. 480V, MCC. ed via CIO let- '
NCR 000925 was issued by MPQAD on ter SWMCP-024 November 22, 1983. 'CIO will track dated 2/3/84.
this item to assure that corrective Closure pending action (repair) has been performed cable repair 4
to approved procedures. during CCP Phase II.
043 Tracked CIO Phase III evaluation of archi- Item Notifi- Item Notifi-Action techtural/ civil document control cation Report Ref. CPCo
- cation Report i
measures resulted in findings listed 1/6/84 1/17/84 letter in the Item Notification (similar CSM-0719 .
conditions are identified in MPQAD 1/16/84
' MQAR-DAT-1). .CIO requests CPCo's plan for addressing the problems ;
noted and for implementing and verifying corrective action On both
?
MQAR-DAT-1 and this item. -,
pr ,
+@
p,
=
f !
af
t ,
CIO ITEM SIMtARY - CONTINUATION SHEET '
Classifi- Open L No. cation Description CPCo Response Closed Document /Date Document /Date Document /Date Remarks '
046 Tracked CIO requests placement on distribu-Infor- Item Notifi- Item Notifi-tion for documentation and proce- cation Report cation Report Partial CPCo i mation dures pertinent to the NRC Project response -
1/18/84 2/8/84 Implementation Commitment-Tracking Program,~ advance -
notice of related meeting and a to take 8 to .
schedule which addresses completion. 12 months. I of these events. !
049 Tracked Infor- A CIO review of document control Item Notiff- Item Notifi-methods resulted-In the following cation Report CIO awaiting i nation cation Report completion of observations: (1).Some uncontrolled 1/26/84 2/3/84 specs contained controlled copies of CPCo correc-FCRs, FCNs and SCNs; (2) Controlled tive action.
4 documents are being " decontrolled" t via a line-out method which is not !
4 procedurallized;-and (3) CPCo DCC personnel are unaware of the Bechtel -'
Ann Arbor method of Identifying i document transmittals as either ,
controlled or uncontrolled. ,
- 051 Tracked CIO requests to be informed of meet- !
Action- Item Notifi-x ings regarding the proposed plan cation Report Partial response :
of action to address deficiencies 2/3/84 provided via :
Identified in MPQA0 Audit Report No. CSC-7423 dated :
MSA-83-7 as well as a copy of the 3/6/84. CIO proposed plan one week prior to its awaiting further
, implementation. . CPCo. action. 1 052 Tracked CIO requests copies of audit Item Notifi- Item Notifi- E i Infor- reports for audits performed Item Notiff- A total of 40 mation by the NRC, CPCo and BPCo of cation Report 2/3/84 cation Report cation Report audit reports ([,q$i; site activities / organizations which 3/12/84 3/19/84 have been pro- g, ;
addressed Criteria XVIII of.10CFR50 vided by CPCo gg Appendix B._ 2o between3/12/8 and 3/15/84. A ,
n=
400-001 >
I
~
4 CIO ITEM SupMARY - CONTINUATION SHEET Classifi- '
Open CPCo Response No. cation Description Closed Document /Date Document /Date Document /Date Remarks e
053 Tracked - As described in Section 4.2 of the Item Notiff- Item Notifi-Action CCP, CIO requests that CPCo provide cation Report a listing of all status assessment cation Report 2/16/84 2/23/84 teams,-the respective team's scope -
and their working schedule.
055 Tracked Clarification is required regarding Infor- Item Notiff- Item Notifi-training requirements for area team cation Report cation Report mation #23/24 personnel performing status 2/17/84 3/15/84 assessment of-raceway completion.
056 Tracked During a training evaluation for Item Notifi- Item Notifi-Infor- PQCI C-1.50, CIO observed discrep- Item Notifi- y cation Report cation Report cation Report nation ancies in the lesson plan. CIO 2/17/84 g 2/29/84 3/19/84 requests a review to determine what impact these items have on the training provided. CIO further requests information on how MPQAD assures that document changes.are ' '
referenced on the lesson plan.
- 058 Tracked CPCo should review past audits to ~
Infor- Item Notifi- Item Notifi-assure that applicable 10CFR50, cation Report cation Report nation- Appendix B criteria were adequately 2/18/84 3/13/84
, addressed. -
i 059 Tracked ., CPCo should review audits performed infor-~ Item Notifi- Item Notifi- '
i prior to June 1983 to assure adequacy cation Report cation Report nation of auditing, proper closeout, 10CFR50 2/18/84 >c 3/13/84 gg.
Appendix B compliance, and objective evidence as to adequacy of the audits. g5 p
@E, "Ea..
=l 400-001 P, '
- _ _ - _ _ _ _ - _ _ _ _ _ ___-- _- . ~ - . -- . . _ . _ .. . . . . .
9
- CIO ITEM SIM4ARY - CONTINUATION SHEET Classifi- Open CPCo Response No. cation Description Closed Document /Date Document /Date Document /Date Remarks
- 060 Tracked CIO provides a series of recommen- Item Notifi-- Item Notiff-Recommen- dations in the following categories
- cation Report cation Report dation 1) Management Involvement; 2) Track- 2/17/84 3/13/84 ing Audits / Audit Findings; and 3)
Audit Personnel Training and Certif-cation Records.
, 061 Tracked- CIO recommends that the receipt Item Notiff-Recommen- acknowledgement copy of the Bechtel cation Report dation transmittal form be revised to pro- 3/2/84 ,
vide for a signature /date by the recipient.
I 062 Tracked CIO has determined that status Action Item Notifi- CPCo has re-assessment is being performed on cation Report pipe supports by personnel who have quested BPCo 3/6/84 (Ref. CSC-7424 not completed required training. All personnel performing hanger support dated 3/7/84) status assessment should be checked to perform porrective-to assure they are properly quallfled.
Any previous supports that were' action and assessed by unqualified personnel respond by should be reassessed.
3/12/84.
063 Tracked During a review of referenced draw- Item Notifi-Action ings being used for status assess- cation Report ment, CIO identified a number of 3/15/84
- ? drawing identification and revision l control discrepancies.
064 ggj Tracked CIO recommends implementation of Item Notifi- rer Recommen- MPQAD plan to consolidate welding cation Report
- dation inspection requirements for electri- 3/16/84 cal / instrumentation equipment and {F s '
supports into PQCI's CW-1.00 and "E EW-1.00. * ~i.
=
,0 -
j 400-001-
k CIO ITEM SUPMARY - CONTINUATION SHEET
'l Classifi- Open CPCo Response Closed No. cation Description Document /Date Document /Date Document /Date Remarks 065' Tracked CIO recommends that Zack Procedure Item Notiff-1 Infor- M-FP-7C be revised to reflect the cation Report nation 8PCo requirement that notification 3/16/84 of addenda retirement information for BPCo documents is provided via a Subcontractor Change Notice (SCCN).
066- Tracked CIO recommends that Zack revise Item Notiff-Infor. either Procedure MP-FP-18 or Pro- ' cation Report nation cedure MP-FP-23:in order that the 3/16/84 method used to update the welder i qualification matrix be properly addressed.
067 Tracked CIO recommends ~that Zack Pro- Item Notifi-Infor- cedure 2 -FP-5 be revised to address cation Report 1 mation required a::tions for incomplete 3/20/84 and damaged items. ,
068- Tracked The Midland Plant FSAR (Table 3.2-4) Item Notifi-Action- specifies use of the 1974 Edition cation Report
. . (no addenda) of the ASME-III, -
3/23/84
,' Division-1-Code, Subsection NF-(i.e., y installation of hangers and supports for nuclear piping). .A BPCo speciff-cation, as well as the 84W QA Program
. Manual, reference an earlier code edition in. violation of ASME III, Division I, Article NA-1000 (1974 > =-
Edition). .CIO requests the cause, #%
resolution, and corrective / preven- R5 tative action for this condition.
as well.as.any potential impacts on {5' site installations. "E
- 7 E
400 001 *
, STONE & WEBSTER MICilIGAN .INC. NOTES: 1. % jdentifies changes from previous report CONSTRUCTION IFLEE NTATION DVERVIEW MIDUUID NUCLEAR COGENERATION PLANT 2.ClosedHoldPointswillbeidentl[lkintheReportfor.
' the week of closure and dropped from further reporting t
CIO HOLD POINT
SUMMARY
1 s
No. Description Established CPCo Response Lifted Document /Date Document /Date Document /Date N'"8 d 5 '
005 CPCo has comunitted to develop a Vendor . Report No.'18 Equipment Verification Program. Program 10/17/83 ,
- is require) efore implementation of Phase II.
007 Evaluation of Management Review of Report No. 19 results of Phase I activities. Evalua- 10/26/83 tion is required before implementation of Phase II.
015 CIO has requested that the requirements for the exclusive use of chromel-alueel Hold Point Notification Hold Point [*
thermocouples and extension wires for Notification Report 2/1/84 . Report 2/10/84 '
PWHT and certification of the accuracy ,
of the thermocouples via a C of C be reinstated in POCI PW-1.00. Release is contingent upon CIO review and acceptance "
of the calibration certification.
e
%c I'
m
,8 <
A00-001 2
-- y- - - - - -
~
STOE & WEBSTER MICHIGAN, INC. 1.
NOTES: d identifies changes from previous report CONSTRUCTION IWLEENTATION OVERVIEW
- 2. Closed NIRs will be identified in the report for the MIDLAND NUCLEAR C0 GENERATION PLANT
, week of closure and dropped from further reporting.
NONCONFORMANCE IDENTIFICATION REPORT St# MARY ~
No. Description Issue' Date Response Date Closure Date Remarks !
014- As documented on CIO Evaluation No. MP-MIS- 01/27/84
/
074-0001, FPD 1.000 requirement that a copy
\
of all transmittals for "Q" listed items be ~
transmitted to MPQAD and.the Project Supplier ~
Quality Representative was not being satisfied.
015 In violation of PSP G-7.1, correction fluid 02/17/84 was used on MPQAD Audit Report No. M01-346-02.
016- Contrary to their MPQAD Procedure F-1M deft- 02/17/84 nitions, "nonconformances" were documented ' ~
as " observations" in Audit No. M01-346-02.
017 The recommended corrective action for Audit 02/17/84 ,
finding 01F, Audit No. M01-346-02 was not-implemented, yet the audit was closed out.
019' As documented on CIO Evaluation No. MP-NIS- 02/29/84 082-0001, several. discrepancies were.Identi-fled on the FDOL.
020 As document'ed on CIO Evaluation No. MP-MIS- 03/02/84 082-0001, 4 out of 25. Distribution Change ;q;. . '
Request Forms were not properly signed in violation of FPZ-1.000. ' M 5' l
{
54
_ ni C- - -
_ _____-_____________..____.__.____.__J
__ _ .___.__.___--.-_ ___ _ __ _ _ _ _ . . _ _ - . . . - _ _ _ __ _ _ - . - .- _ _ . ~ . - . _ _
a ,, .
CIO NONCMFORMANCE IDENTIFICATION REPORT SUPMARY - CONTINUATION SHEET No. Description Issue ate Response Date Closure Date Remarks 021 During a resampling/ evaluation of the 03/12/84 Corrective actiori Construction Training Matrix in conjunction was initiated at the with the closure of NIR 008, two nonconfor- time of the evalua-mances were identified regarding requirements tion in the form of for training to BPCo field procedures, changes to the appro-priate matrices.
022 At work Print. Station 219, CIO reviewed 80 03/23/84 -
out of 1116 documents. '20 documents were found discrepant, as described in the NIR.
023 At Work Print-Station 209, CIO reviewed 03/23/84 80 out of 1116 documents. 23 documents #
contained discrepancies, as decribed in \
the NIR.
024 At Document Control Station 501, CIO 03/23/84 reviewed 200 out of 5533 drawings. A total of 13 discrepancies were identified, as described in the NIR.
?
>=
3.,
as n"
J 400-0)1
STONE & WEBSTER MICHIGAN, INC.
, CONSTRUCTION IWLEMENTATION OVERVIEW '
' MIDLAND NUCLEAR C0 GENERATION PLANT WEEXLY E ETING SINMARY ,
t Date Attendees Discussion Topic
[ ,
CIO Comments March 20, HRP Status MPQA0 1) MLCS being updated to reflect hangers in 1984 Meeting CIO No CIO concerns identified.
each module
- - March 20, Area Team CPCo 1) Requesting more Ann Arbor support for 1984 Staff Meeting MPQAD large "Q" items No CIO concerns identified.
BPCo CIO March 20, Group Staff CPCo 1) Training updates continuing No CIO concerns identified.
1984 Meeting p 2) MLCS being updated CIO 3) Discussed possible release of additional modules for CCP Phase I '
March 21, CCP CPCo. 1) Discussed concerns expressed by.CIO relative CIO~is contirfulng to follow 1984 '
BPCo to integration of CCP Phase i activities, this topic.
~
CIO training and documentation March 21 Team, Meetings CPCo 1) Raceway MLCS update ahead of other March 22,
~
CIO is evaluating Document MPQAD disciplines ,
~
Control at this time. #g ch 23' 2) Document Control' Station 501 is usable for No CIO concerns identified. gg 1984 ~ all e.lectrical & main station for area teams
- 3) Training is being completed expeditiously " {
ge ,
- 4) Teams to get all 'Q Lists' back from MPQAD ^
ok by 6-84
=
i 0
(continued) -
- i WEEKLY MEETING SIM1ARY - CONTINUATION SHEET -
Date ,"9 Attendees Discussion Topic CIO Comments March 21 Team Meetings CPCo (continued)
March 22 MPQAD . 5) MLCS is being updated March 23 6) S/A to begin in Control Room first week 1984 in April if release is approved by the NRC
- 7) Diesel Generator work may start on 5-1-84.
S/A should start 4-1-84 March 21, CCP Overview NRC 1) Discussed general CIO evaluation of CCP No CIO concerns identified.
1984 CIO progress to date.
- 2) Agreed to meet bimonthly for coordination and information exchange March 23, QVP Assess- MPQAD 1) Discussed status and progress of QVP No CIO concerns identified.
1984 ment Meeting CIO
- 2) QVP is performing satisfactorily to date
- 3) Number of drawing revisions is high
. 4) Craft cooperation for QVP is good _
March 23, Subcontracts CPCo B&W - May remove up to 28 snubbers No CIO concerns identified.
1984 Meeting BPCo - Unit I upgrade to begin by 4-6-84 B&W . - Hanger reinspections are ongoing,
~
Zack 7 are complete
- Will have 4 inspectors qualified by 3-29-84 gg a, x Zack - Drawing issue process is slow 97
- Closed 4 NCR's, opened 0 lg "E
?+
. .E h
Wnkly Report No. 41 '
'CCP PHASE I ACTIVITY Exhibit 1 March 19 - March 23, 1984 t-
' l MODULE S/A QVP **
HRP j 102 Hangers Instrumentation Mechanical i
East Pipeway to Mechanical Mechanical Elevation 630 '
1&C Electrical Electrical '
120 Mechanical Mechanical Mechanical 1&C Electrical '
i t
. Auxiliary Building Electrical Elevation 584 180 Aux!!iary Building Mechanical Mechanical Elevation 704 &
above 1 200 Control Tower & Architectural Electrical
, Penetrations 340 Civil Hangers Electrical Civil Mechanical Architectural 1&C Mechanical Electrical Instrumentation 410 Turbine Building Elevation 614 i
l
- 420 Turbine Building Civil Elevation 634
- 430 Turbine Building Civil Elevation 659 620 Turbine Building Civi.1 Elevation 634 l
630
- Turbine Building Civil *'
Elevation 659 800 Civil Electrical Service Water Electrical Mechanical Pump House Whip Restraints Instrumentation -
, *Relcased for partial systems only ** HRP is also active in modules 130,140 and 150 400-001
--_ _ _ - _ .