ML20199J918
| ML20199J918 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 06/30/1986 |
| From: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Taylor J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| 32755, ALAB-106, NUDOCS 8607080461 | |
| Download: ML20199J918 (1) | |
Text
_ _ _ _ _ _ ___
O CODSum8IS Power CampHDy
^ " " "
Vice President - Projects, Engineering and Construction General offices: 1945 West Pernall Road, Jackson, MI 49201 e (517) 788-0453 June 30, 1986 Director of Office of Inspection and Enforcement Att: Mr James Taylor US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT - ALAB-106 QUARTERLY REPORT #51 DOCKET NO.S 50-329 AND 50-330 FILE:
0.4.6 SERIAL
32755
Reference:
a) Letter, J W Cook to J Taylor, ALAB-106 Quarterly Report, Serial 32635, dated March 31, 1986 No new individuals have been assigned quality related duties since the last report (reference a); thus no resumes are required for this report.
Construction at the Midland Energy Center has been shut down since July 16, 1984. No construction activities are projected for the period July 1, 1986 through September 30, 1986.
The next ALAB-106 Quarterly Report will be sent t end of September, 1986.
JWC/WRB/lr CC: JCKeppler, NRC Region III 8607080461 860630 DR ACOCK 0500 9