Forwards Independent Assessment of Underpinning,Weekly Rept 80 for 840325-31
ML20091E943
Person / Time
Site: Midland
Issue date: 04/04/1984
From: Lucks A
STONE & WEBSTER, INC.
To: Cook R
NRC
Shared Package
ML20091E782 List:
References
MPF-80, NUDOCS 8406010413
Download: ML20091E943 (15)


Text

f;nwc mi t -u.=z --_1

on . -

STONE & WEBSTER MICHIGAN, INC. I~~-l l ':" ? I

't .

P.O. Box 2325, BOSTON. M ASSACHUSETTS O2107

(.4;_ .

~ NIIc.

United States Nuclear Regulatory Commission April 4, 1984 Midland Site Resident Office Route 7, J.O. No. 14358 Midland, Michigan Ref. MPF 80 Attention: Mr. R. Cook DOCKET No. 50-339/330 MIDLAND PLANT UNITS 1 & 2 INDEPENDENT ASSFSSMENT OF UNDERPINNING

+ REPORT NO. 80 A copy of the Independent Assessment of Underpinning Weekl;' Report No. 80 for the period of March 25, 1984 through March 31, 1984 is enclosed with this letter. Included as attachmente are the minutes of the daily meetings held during the week between members of the Assessment Team and Site Engineering, Construction, and Quality Assurance ' personnel.

If you have any questions with respect to this report please contact me at (617) 580-2067.

h E- A5

A. Stanley lacks Project Mtnager Enclosures ASL/pd cc:

JJHarrison (ene), US NRC Glen Ellyn, IL Grace Dow Memorial Library (enc)

DQuamme (ene) CPCo Midland (site)

JMooney (enc) CPCo Jackson JMeisenheimer (ene) CPCo Midland (site)

APR 1 6 1984-

~

8406010413 840518 PDR ADOCK 05000329

.GJ I'-

PDR. -' ,

-o .

-J. O'.-No. 14358-

-. Midland Plant Units 1 &;2' Independent Assessment of_Jnderpinning-Weekly Report No. 80 March 25, 1984 through March'31, 1984 Personnel on Site Stone & Webster Michigan,.Inc. -

P. Majeski 3/27 - 3/31 D. Benvie 3/26 - 3/31 '

D. Zito 3/26.- 3/30 '

L. Rouen 3/25 - 3/27 Parsons Brinckerhoff Michigan, Inc.

, J. Oliveira 3/27 - 3/31

- B. Metros 3/25 - 3/27 Meetings Attended.

~

Date Represented Purpose 3

3/19 - 3/23 Stone & Webster Daily Assessment

-Bechtel Team Meeting Consumers' Power Parsons 3/19 Consumers Power Inter-organizational Bechtel Meeting MPQAD Stone & Webster Underpinning and Remedial Soils -' Construction j Pier Kc4: Load transfer fer the pier was completed. Routine rejacking is in progress. .

Pier E/W16: Installation of the upper leveling and bearing plate assemblies has_been completed.- 'Ihe jackstand installation is in progress for both piers.

Piers CT1/12: Installation-of the transfer frames is in progress. -

Kc3 to Kc4 Drift: Installation of steel reinforcement for the drift invert mudmat is in progress.

Kc10 to Kc9 Drift: Installation.of steel embedments for the drift invert mudmat is in progress.

Access Shaft Level "C" Wales: . Installation of plates for support of the Level C Wales is in progress on both the east and west shafts.

SWPS: ' Installation of the upper level wale is in progress.-

m ...

,y  % +

V

.a

2 J. O. No. 14358 Midland Plant Units 1 & 2 Independent Assessment of Underpinning

~ Assessment Team Observations - Construction s The Assessment Team observed the ongoing installation of the transfer frames for piers CT1/12. Work completed to date includes setting the '

, stabilizer plate and rockbolts into place, placement of the lower leveling and bearing plates, installation of the steel collar drift frame, placement of grout for the steel collar frame mudmat and setting the major transfer frame components into place. All concrete surfaces were roughened and moistened for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in accordance with .

procedures. Grout placement for the steel collar frame mudmat was continuous avoiding segregation and bleeding. Erection and splicing required to set the steel collar drift frame into place was accomplished in accordance with the procedures. Despite the confined working area, the Contractor was able to move the transfer frame beams and posts into place without damaging the transfer frame members or the appurtenant components that have already been installed. It is the opinion of the Assessment Team that installation of the transfer frames performed to date has been accomplished in accordance with project procedures and good construction practice.

Assessment Team Observations - QA/QC The Assessment Team reviewed the design drawings assigned to the UAT work print station of the Auxiliary Building underpinning. The review consisted of checking the drawings for proper revision number, proper posting of attachments, legibility and proper identification stamps.

Four deficiencies were found with respect to posting of attachments and drawing revisions. As a result, NIR No. 24 was issued. The deficiency rate was less than 2 percent of the total attributes considered.

However, the Assessment Team recomends the Contractor should put forth additional effort to maintain the documents properly. During the review of this work print station, two additional drawings were posted that were not shown on the internal distribution list. The Contractor was informed and these drawings were added to the list.

Compressive strength testing for. piers CT1/12 concrete cylinders at the US Testing laboratory was overviewed by the Assessment Team. . Curing and capping of cylinders was accomplished in accordance with project procedures. During ic3d application, the US Testing technician performing the test did not use the maximum load indicator on the pressure gage as required by ASIM procedures. As a result, the Assessment Team issued NIR No. 25. All other aspects of the test were in accordance with procedures.

The Assessment Team reviewed 150 Inspection reports for proper certificatien of MPQAD inspectors. These reports covered inspections of various

= construction activities. Based on this_ review, the Assessment Team concludes that the Inspectors were properly certified.

Work Activity Packages No Work Activity Packages were overviewed or active during the past week.

n._

3

0. No. 14358

- Midland Plant Units 1 & 2 Independent Assessment of Underpinning Nonconformance Identification Reports '

The following Nonconforinance Reports (NIRs) remain open or have been closed during the week.

IR No. Description Status (Opened)(Closed) 22 Resident Engineering 2/21/84' .

Document Control Stations 23 Subcontractor 3/13/84 3/28/84

}, Work Print Stations 24 Design Drawing 3/30/84 Review at UAT Workprint Station 25 Compressive Strength 3/30/84 Testing of Concrete L Cylinders Open Items Items discussed during meetings are categorized as follows:

OPEN ITEM' - An item for which an action is required. The item will remain open until the-required action has been taken. Tracking is required.

CIDSED ITEM - An item, usually brought forward by the Assessment-Team that is discussed and adequately responded to. No tracking is. required.

4 INFORM;. TION ITEM - An item, brought forward to provide general background informatica regarding work, such 's a work status or an upcoming design change. No tracking is required.

' OPINION ITEM - An opinion or suggestion, given by the Assessment Team expressing an alternate construction or-quality assurar. e. technique.-The-opinion or suggestion is given as a possible alternate that may facilitate an operation.

CIDSES ITEM -XX-XX - This notation identifies an a'ction that. closes a s previously identified open item. Tracking of the item stops..

The following listing of all Open items from the Daily Meeting ~ Notes.with

, .Bechtel and the text of the Weekly Reports. Carry-over items from past-weeks have been Closed this week are also listed.

Item No. Description- -Closure 64-7' QAP Review Program -Open

  1. 64-10 ' Trend Analysis open .

k

" F

4

-J. O. No..14358 Midland Plant

. Units 1 & 2

, Independent Assessment of Underpinning Item No. Descriptica , Closure 71-17 Computerized Civil .Open Drawing Register 71-29 Useof " Retired" FCRs 80-27 74-21 US Testing Corrective Open Action ,

25 Expansion Anchors Open 75-9 REDocument Control 80-28 77-12 FCRProcessing Task Force Open

., 77-13 Drawing Attachment Stamp 80-10 79-5 BearingPlate at Kc9 80-12 79-26' UpperLeveling Plate Open 79-28 SWPSBaekpacking Material Open 79-34 SWPSBackpacking Placement Open 80-28 _

~ Resident Engineering- Open Document Control b b Project Engineer'-

bE Le Project Muagbr.

b ,

l t

Notes. of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Consumers Pcwer Company s

Held at Midland Site Midland, Michigan March 26, 1984 Present For:

Consumers Power Bechtel MPQAD Stone & Webster G. Murray J. Kelleher R. Sevo L. Rouen -

R. Wheeler S. Hartstern J. M: Master D. Benvie D. Lavelle D. Zito Parsons Brinckerhoff B. Metros PURPOSE ,

This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.

DISCUSSION Status Items Item 80 Auxiliary Buildir6 Underpinning Activities.

Placement of concrete in the CT-1/12 pier shafts has been completed.

Installation of the upper and lower leveling and bearing plates has been ec=pleted for pier Kc4.

The lower leveling plates for piers E/W-16 have been grouted into. place.

(INFORMATION ITEM)

Item 80 Bearing Plate at.Kc9.

In response to a Bechtel question concerning the pier.Kc9 upper leveling plate, D. Benvie clarified the Assessment Team'sconcern. He stated that the Assessment Team's concernwas with compatibility of fabrication vs ' installation tolerances.

D. Lavelle agreed to resolve the concern. (Item 79-5 remains OPEN)(INFORMATION

! HB) i Item 80 NIR 23-Subcontractor Work Print Station.

j R. Sevo stated that the MPQAD response to HIR 23 will be transmitted to the i - Assessment Team today. (INFORMATION ITEM) j Item 80 Trend Analysis.

J. AcMaster reported that implementation of the revised trend analysis program has been rescheduled from 4/2/84 to 5/1/84. The present trending. ,

system remains in effect. (INFORMATION ITEM) )

1 1

k -

r 6

- Notes of Daily Meeting Independent Assessment of Underpinning

~

Midland Plant, Units 1 & 2

. Consumers Power Company Held at Midland Site Midland, Michigan March 26, 1984

New> Items

- Item 80 Action Plan for Engineeiing Document Control.

! D. Lavell'e stated that a presentation detailing specifics of the ' '

revised document control program for' Resident Engineering is scheduled

. for 3/28/84 (INFORMATION ITEM)

  1. Item 80 Receipt Inspection for Piers CT 3/10 Transfer Frames.

L. Rouen noted that receipt inspection for the piers CT 3/10 transfer frames have not been performed. The Assessment Team asked if the receipt inspection will be accomplished soon to provide an adequate period of time to undertake corrective action if needed prior to c the planned installation date. FSO will respond. (OPEN ITEM)

~

Response Items No response items were addressed.

l t

_i .

~

r _

]

Notes of Daily Meeting Independent. Assessment of Underpinning Midland Plant' Units 1.&-2

' Consumers Power Company i-Held.at Midland Site Midland, Michigan

- &rch 27, 1984

. ~

Present For:

Consumers Power Bechtel MPQAD , Stone & Webster G. Nrray D. lavelle R. Sevo L. Rouen -

R. Wheeler J. Kelleher J. Mc& ster D. Benvie E. Cvik1 D. Zito Parsons Brinckerhoff B. Metros PURPOSE f

This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2 .

DISCUSSION

' Status Items Item 80 Auxiliary Building Underpinning Activitics.

Installation of the steel collar frame has been completed.

The W8 grillage was locked off yesterday. - At the time of lock off, the amount of upward building movement has decreased from 63 mils' measured just prior to start of Jacking to 53 mils.

] The upper leveling and bearing platie. assembly has been installed for pier E16.

(INFORMATION ITEM)

Item 80 SWPS Underpinning Activities.

D. Lavelle reported that placement of concrete-for a portion of the SWPS Carlson meter encasements is scheduled for 3/28/84. (INFORMATION ITEM)

New Items Item 80-9 -- SWPS Bnbedded Plates.

D. ' Benvie asked if FSO still planned to cut the rebar at selected areas on the SWPS north wall in order to facilitate embedded plate installation.

J.- Kelleher responded that the shear lug locations for the embedded plates will be adjusted to compensate.for the location of the existing rebar.. alleviating

, the need to cut the-reinforcing steel.- (CLOSED ITEM)_

Response Items Item 80 Drawing Attachment Stamp. p 4 E. Cviki' addressed.the AssessmentTeam's question concerning methods for posting attachments to the ResidentEngineer's controlled drawings. He.

.-provided the ' Assessment Team with a copy of the new adshinistrative procedure w ,

s - - , , e

- - - ... ~ - -. - - - --

Not:0 of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units .1 & 2 ,

Consumers Power Company i l

Held at Midland Site l Midland, Michigan '

March 27, 1984 for maintaining and distributing the Resident Engineers' controlled documents and attachments. The procedure requires that all FCRs/FCNs, DCNs and SCNs be attached to the back of the appropriate drawings. '

Previously, the procedures allowed the change documents to be either attached to the back of the drawing or listed on a block stamp on the front of the drawing and maintained in a separate location. The Assessment Team believes that designation of one method to post attachments to drawings will preclude the possibility of missing or improper posting of attachments. (CLOSES ITEM 77-13)

Item 80 Receipt Inspection of Piers CT1/10 Transfer Frames.

J. McMasterresponded to the Assessment Team question concerning receipt inspection of the transfer frames for piers CT3/10. MPQAD will inspect the transfer frames in the next two weeks. Since the i load transfer for piers CT3/10 is not scheduled until 7/84, imple-mentation of corrective action,'if required, will not impact completion of the piers. (CLOSES ITEM 80-6)

Item 80 Iower Bearing Plate at Pier Kc9.

]'.. D. lavelle responded to the Assessment Team question concerning compatibility of fabrication vs installation tolerances for the pier Kc9 bearing plate. An evaluation of the tolerances by FSO has shown that there is no conflict between fabrication and installation

, requirements. Based upon a Visual inspection, the underpinning sub-

! contractor rejected the bearing plate because of. warpage. A subsequent check of the rejected bearing plate with feeler gauges showed the plate to be within acceotabl.e tol.erances. (CIAW ITD4 79-5) 4 i

=

0

E. ~

4-

.: Notes of_ Daily Meeting . .

1 Independent Assessment'of Underpinning Midland Plant, Units 1 & 2

Consumers Power Company
Held at Midland Site -

l- Midland, Michigan:

p March 28, 1984 ~

Present For:

' Consumers Power Bechtel MPQAD Stone & Webster G. Murray D. Lavelle J. McMaster~ D. Benvie R. Wheeler J. Kelleher G. Carpenter D. Zito 1 E. Cviki P. Majeski F J. Gaydos_ .

! S. Hartstern Parsons Brinckerhoff Part. time ~ e J. Oliveira i

i PURPOSE This meeting _is held .each day to discuss items regarding the Independent Soils Assessment'at the Midland Plant, Units 1 & 2.

DISCUSSION Status Items Item 80 Auxiliary Building Underpinning Activities.

Placement of the grout mudmat in the instrumentation pits for piers CT1/12.

t was completed.

The jackstands and jacks have been installed for. pier Kc4.-

The upper leveling and bearing plate assembly' for piers E/W16 have been grouted into place.

(INFORMATION ITEM): .

Item 80-14 SWPS Underpinning Activities.-

J. Kelleher stated that an FCR is being processed to relocate shear. lugs required for installation of the embedded. plates on the SWPS north wall.

Shear lugs are being relocated.to allow their installation without having to cut existing rebar on the north wall. _(INFORMATION ITEM)-

New-Items Item 80 Document' Control' Upgrading.

J. Brown of Bechtel provided a status of the Document Control upgrading activities and a summary of future changes.--' She indicated that the > plans.

include-the development of a Master Document Control Center, an element- ~

of which will be the Field Document Control Center (FDCC). - Five stations -

with controlled documents will be established. These stations will be managed by the: FDCC to assurtthat documents are controlled 'in a uniform manner throughout the site. The Design Document Register will be the means used to control the attachments to doctments'as well as their -

distribution on site. A review group internal to document control will.

be used to assure that the_ documents are maintained properly.- An

Notca of Daily Meeting . .

Independent Assessment of Underpinning

. Midland Plant, Units 1 & 2 ,

Consumers Power Company.-

Held at Midland Site

- Midland, Michigan -

March 28, 1984 evaluation is currently underway'to. decide whether the Resident Engineering Document Control Center should become a new station serviced.by FDCC or should' remain independent. 'Ihe upgrading of the. Document Control System is expected to be complete during tne third quarter' of this year.

(INFORMATION ITEM)

Response Items

. No response items were addressed.

I f

i 4

4 b

l- .

i-y '>' =- s v a <we w 4 -

+

  • Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Consumers Power Company Held at Midland Site -

Midland. Michigan March 29, 1984 Present For:

Consumers Power Bechtel MPQAD Stone & Webster R. Wheeler D. lavelle J. McMaste'r P. Majeski J. Kelleher J. Moran D. Benvie E. Cvik1 D. Zito S. Hartstern J. Gaydos Parsons Brinckerhoff J. Davies J. Oliveira PURPOSE This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.

DISCUSSION Status Items Item 80 Auxiliary Building Underpinning Activities.

The lower leveling plates have been installed in piers CT1/12.

Load transfer for pier Kc4 has begun.

Installation of embedded channels in the Kc10 to Kc9 drift invert is in progress.

(INFORMATION ITEM)

-Item 80 SWPS Underpinning Activities.

M. Blendy discussed a potential leakage problem below the bentonite seal.

The leakage is suspected based upon observation well readings. It is believed that water may be seeping through the gravel and riprep layer below the . Seal. FSO will perfom a visual inspection and use dye to trace any water flow through these permeable layers. (INFORMATION ITEM)

Item 80 ' Use of " Retired" FCRs.

J. Kelleher provided the Assessment Team with revised construction and engineering procedurcs related to the preparation and control of FCRs/FCNs.

The Assessment Team was advised that these procedores address the handling and use of " Retired" FCRs. (ITEM 71-29 remains OPEN) (INFORMATION ITEM)

New Ite:ns Item 80 Document Review of UAT Workprint Station.

P. Majeski infomed FSO that the Assessment Team will perform a document review at the UAT workprint station. (INFORMATION ITEM) t:-

4 Not53ofDaily. Meeting _

i Independent Assessment of Underpinning Midland Plant, Units-1 & 2

Consumers Power Company i

, Held at Midland Site '

Midland, Michigan '

N rch 29,-1984 l Item 80 MPQAD Welding Audit.

D. Lavelle stated that the MFQAD welding audit has been completed.

A report detailing findings will be issued in the nep two weeks.

(INFORMATION ITEM)

Item 80 ~ Weekly Report # 79.

The text of Weekly Report # 79 was reviewed. It was determined that all open items had been previously identified. (INFORMATION ITEM)

Item 80 Stablizer Plate Oversized Holes.

J. Oliveira asked if an FCR was being prepared to allow the use of oversized rock bolt holes in order to simplify installatien of the piers CT1/12 stabilizer plates. J. Kelleher responded that rock bolts and plates needed for the transfer frame stabilizer plates.will be installed as one unit. Installing the assembly as one unit will not require oversize holes. (CLOSED ITEM)

Response Items Item 80 NIR 23 Subcontractor Work Print Sta'lons.

c The Assessment Team completed their review of the response to NIR 23 which identifies work station document deficiencies. The response stated' that errors noted in NIR 13 have been corrected. Additionally, the results of a "self audit" conducted by FSO of their controlled documents indicate that these documents are being maintained in,a satisfactory manner.

The Assessment Team verified the correction _of the deficiencies and reviewed the "self audit" report. - Based upon this information, NIR 23 was closed I

on 3/28/84. (INFORMATION ITEM) i f

y

. __;__ _x. - - -

\

~

-Notes of Daily Meeting I,ndependent Assessment of Underpinning Midland Plant, Unita 1.& 2

+

Consumers Power Company

' Held at Midland Site-reh 30, 4 t Pmsent For:

< Consumers Power-- Bechtel MPQAD Stone & Webster R. Wieland . D. Lavelle J. McMaster P. Majeski , l J. Kelleher J. Moran D. Benvie  !

Cvikl

^

E. D. Zito S. Hartstern l

J. Gaydos Parsons Brinckerhoff M. Blendy J. Olivsira PURPOSE This meeting _is held each day to discuss items regarding the Independent

Soils Assessment at the Midland Plant, Units 1 & 2.

[ DISCUSSION i- Status Items

' Item 80 Auxiliary Building Underpinning Activities.: ,

The lower leveling plates have been set into place and the stabilizer j plate rock bolts have been set into place for piers CT1/12.-

Installation of the rebar has begun for the pier Kc3 to Kc4 drift invert.

i (IN MRMATION ITEM)

Item 80 FCR Processing Task Force.

s- .

1 M. Blendy discussed the status of the FCR processing task force study

! undertaken to improve the' FCR response time. Primary objectives of.the-task force include identification of delay 3' during FCR processing, 4

designating suitable process times and establishing an~ average rate of' FCRs to be processed and addressed daily. Additionally a planning group

. has been established to' identify areas in advance where FCR's are required in order to levelize the work load and reduce the number'of critical FCR's i which may impact work progress. (ITEM 77-12 remains OPEN) (INFORMATION ITEM)

New Items .

,- Item 80-26'- NIR 24 --Design Drawings at UAT Workprint Station. ,

[ P. Majecki~ stated the Assessment Team had completed their review of design drawings at the UAT workprint station.- As a result of the review, NIR 24 will be issued today describing deficiencies noted by the Assessment-.. ,

Team.~ These deficiencies were two missing attachments to _the design drawings, t .the posting of.a' drawing that was not a current issue and a: drawing attachment not identified in the block stamp. .(IN MRMATION ITEM) .

I wY

= -

q Notes of Daily Meeting.- .

Independent Assessment of Underpinning Midland Plant, Units 1 & 2

. Consumers Power Company Held at Midland Site ,

Midland, Michigan thrch 30,1984 Response Item Item 80 Use of Retired FCRs.

he Assessment Team has completed their review of doc'ument control '

procedures that have been revised to improve the handling and use of " retired" FCRs. In lieu of retiring one time deviation FCRs from the controlled documents after 30 days, all fbture one time deviation FCRs will either be directly incorporated into the design docu w nt or referenced on the document with a brief description.

Additionally, one time deviation FCRs written in the past will be incorporated into or referenced on the design-drawings. The Assessment Team believes direct incorporation or referencing of one time deviation FCRs on the design documents will improve the handling of this type of FCR. This item is now closed. (CLOSES ITEM 71-29)

Respense Items Itera 80 Resident Fngineering Document ~ Control.

]

The Assessment Team reviewed project engineering procedures and administrative procedures for handling and maintaining the Resident Engineers Controlled documents. Inconsistencies were noted between the administrative and project engineering procedures in regards to posting of attachments and annotating the drawings to signify a revision is in progress. The Assessment Team requested the Contractor to review the project engineering and administrative procedures related to controlled documents in order to identify and resolve these inconsistences.- (CLOSES ITm 75-9) (OPEN IT E) w G

f'