Category:CORRESPONDENCE-LETTERS
MONTHYEARML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20248D6521989-07-20020 July 1989 Forwards Response to Util Re Bills D0184 & D0185 for Plant OL Application Review Costs by Various Program Ofcs Through June 1984 ML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20205C3521988-09-23023 September 1988 Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20237B4361987-12-14014 December 1987 Final Response to FOIA Request for Documents.App B Document, Board Notification 84-024,encl & Also Available in PDR ML20236X6141987-12-0808 December 1987 Final Response to FOIA Request All Documents.No Addl Records Subj to Request Located ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20235B3081987-09-21021 September 1987 Responds to FOIA Request for Documents,Including AEC to ACRS Forwarding Safety Evaluation Re Zimmer.App a Documents Cannot Be Located.App B Documents in Pdr.App C & D Documents Withheld (Ref 10CFR2.790) ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20235K1731987-07-0909 July 1987 Partial Response to FOIA Request for Info Re Certain Contracts Awarded by NRC for Reporting Svcs.Forwards App a & B Documents.Documents Also Available in PDR ML20234F0911987-06-26026 June 1987 Responds to Appeal Re Denial of FOIA Request for Documents. Forwards Document 5 in App F.Portions of Document 5 Withheld (Ref FOIA Exemptions 6 & 7).Other Requested Documents Withheld (Ref FOIA Exemption 6) ML20215K1981987-06-19019 June 1987 Final Response to FOIA Request for Documents Re Allegations Concerning Plant.Forwards App G & H Documents.Documents Also Available in Pdr.App H Documents Partially Withheld (Ref FOIA Exemption 6) ML20213F9351987-05-0808 May 1987 Partial Response to FOIA Request.Forwards App F Document & Weld Allegations.App G Documents Partially Withheld (Ref FOIA Exemption 6) ML20206H4951987-04-13013 April 1987 Partial Response to FOIA Request for Documents Re Bechtel Employment Discrimination.Forwards App E Documents.App D Documents Withheld (Ref FOIA Exemption 6) ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20211A9531987-02-13013 February 1987 Advises That Financial Info Submitted for 1987 in Util Satisfies Requirements of 10CFR140.21 That Each Licensee Maintain Guarantee of Payment of Deferred Premiums for Operating Reactors Over 100 Mwe ML20212M7651987-01-16016 January 1987 Informs That Due to Demands on Staff,Nrc Will Respond by 870430 to 850607 Request for Review of Invoices D0184 & D0185 Re OL Application Review Costs Through 840623 ML20207C0151986-12-19019 December 1986 Forwards Notice of Withdrawal of Application for OLs & Termination of Proceeding,Per Util 860711 Request & ASLB 861217 Memorandum & Order Granting Motion ML20207C1191986-12-18018 December 1986 Forwards Order Terminating CPPR-81 & CPPR-82 Based on Fact That Const of Facility Ceased,Units Inoperable & Site Environmentally Stable,Per Util 860701 Request to Withdraw Application to Amend CPs ML20215B9641986-12-0505 December 1986 Notifies Util of 870204-05 Early Emergency Responders Workshop in Chicago,Il to Discuss Lessons Learned & Current Problems in Coordination & Integration of Emergency Response Efforts.Meeting Agenda & Preregistration Form Encl ML20214Q0911986-11-24024 November 1986 Partial Response to FOIA Request for Documents Re Ofc of Inspector & Auditor Investigations.Forwards App B Documents. Documents Also Available in PDR ML20214A0761986-11-14014 November 1986 Forwards Insp & Evaluation of Plant for Adequacy of Stabilization Plan,Documenting 861015-16 Site Insp & Review & Insp of Site Stabilization Rept.Environ Stabilization Satisfactory ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20215M8851986-10-28028 October 1986 Forwards Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.No Violations Identified ML20211B5401986-10-0909 October 1986 Further Response to FOIA Request for Eight Categories of Documents Re Ee Kent Allegations Concerning Facilities. Forwards Documents Listed in App K ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20209E6621986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR IA-86-235, Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR1986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR ML20212K9061986-08-21021 August 1986 Forwards Request for Addl Info Re Environ Review of Util 860711 Request to Withdraw Applications for OL by 860828 ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20203B2351986-07-10010 July 1986 Informs That Review of 820622 Application to Receive Unirradiated Nuclear Fuel Assemblies Terminated,Per .Fission Chambers Should Be Disposed of & Licenses SNM-1904 & SNM-1905 Terminated,Per 10CFR70.38(b) ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203Q2891986-05-0606 May 1986 Forwards BNL Technical Rept, Surveillance & Maint..., Based on NRC 851014-18 Insp.No Violations Noted.Items Identified Could Have Impact on Later Project Restart. Evaluation of Rept Recommendations Requested within 60 Days ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued 1997-03-31
[Table view] Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC
MONTHYEARML20133H8841985-09-16016 September 1985 Discusses Ee Kent Allegations Re Plant,Per Encl . Decision Reflected in NRC Should Be Reconsidered. B Garde & T Devine of Gap Unwilling to Testify for Kent.Kent & Counsel Unable to Produce Expert Witnesses ML20133H9201985-05-0909 May 1985 Discusses Ee Kent Allegations Re Quality of Engineering & Const at Plant.Region III Could Quickly Dispose of Matters Held Open in NRC .Meeting to Facilitate Closure Suggested ML20095E2211984-08-0707 August 1984 Forwards Minutes of Monthly Third Party Assessment 840712 Meeting Re Status of Independent Assessment of Underpinning & Remedial Soils Work & Status of Const Implementation Overview Program ML20093H6381984-07-24024 July 1984 Solicits Support in Resolution to Call Public,Congress & Administration Attention to Concern Over Impending Electricity Shortage Due to Unnecessary Cancellations of near-term Plants Under Special Interest Group Pressure ML20090G1971984-07-18018 July 1984 Forwards Draft Topical Rept B-84-148, Idcvp:Control Room HVAC Sys Performance Requirements ML20093J5901984-07-18018 July 1984 Forwards Const Implementation Overview Weekly Rept 57 for 840709-13 ML20093E0781984-07-0606 July 1984 Forwards Const Implementation Overview Weekly Rept 55 for 840625-29 ML20095E2591984-07-0303 July 1984 Forwards Independent Assessment of Underpinning Weekly Rept 93 for 840624-0630.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering,Const & QA Personnel Encl ML20095E3051984-07-0202 July 1984 Forwards Const Implementation Overview Weekly Rept 54 for 840618-22.Rept Includes Summary of Activities & Open Items, Nonconformance Identification Repts & Hold Points ML20093A4091984-07-0202 July 1984 Forwards Summary of 10th General Status Review 840621 Meeting in Ann Arbor,Mi on Confirmed Items & Findings Re Idcvp ML20095E2451984-06-27027 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 92 for 840617-0623.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering Const & QA Personnel Encl ML20092P3621984-06-26026 June 1984 Notifies That 840619 Meeting Re Idcvp Rescheduled for 840628 in Ann Arbor,Mi to Discuss Civil/Structural Confirmed Items ML20092H5461984-06-22022 June 1984 Forwards Rev 5 to Project QA Plan, CPC Midland Idcvp. Signed Document Ack Requested by 840702 ML20095E2891984-06-22022 June 1984 Forwards Const Implementation Overview Weekly Rept 53 for 840611-15.Rept Includes Summary of Activities & Open Items, Nonconformance Identification Repts & Hold Points ML20095E2291984-06-20020 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 91 for 840610-16.Minutes of Daily Meetings Between Members of Assessment Team & Site Engineering,Const & QA Personnel Encl ML20092C3021984-06-18018 June 1984 Forwards Nonconformace Identification Rept 037 Re Orientation & Configuration of Support in Hanger Sketch ML20092C4021984-06-14014 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 90 for 840603-09 ML20092C9451984-06-14014 June 1984 Forwards Const Implementation Overview Weekly Rept 52 for Wk of 840604-08 ML20092A5641984-06-12012 June 1984 Forwards Info Re Closed Const Implementation Overview Item 080 Re Certified Personnel Not Listed in Available Certifications ML20095E2751984-06-0808 June 1984 Forwards Const Implementation Overview Weekly Rept 51 for 840528-0601.Rept Includes Summary of Activities & Open Items,Nonconformance Identification Repts & Hold Points ML20091M8761984-06-0707 June 1984 Forwards Open Const Implementation Overview Item 087 Re Liquid Penetrant Exam on Welds ML20091N3251984-06-0707 June 1984 Forwards Const Implementation Overview Nonconformance Identification Rept Nir 023 Re Work Print Station 209,for Info ML20092C9731984-06-0606 June 1984 Forwards Independent Assessment of Underpinning Weekly Rept 89 for 840527-0602 & Minutes of Daily Meetings ML20091Q8271984-06-0606 June 1984 Forwards Signed Affidavit & Resumes for Mj Huss & Je Walker. Huss & Walker Assigned to Const Implementation Overview Staff ML20091R6611984-06-0606 June 1984 Forwards Const Implementation Overview Weekly Rept 50 for 840521-25 ML20091J8471984-06-0404 June 1984 Forwards Const Implementation Overview Item/Hold Point Notification Forms for Items 072 & 073 Re ANSI N45.2, Section 7 & B&W QA Manual,Rev 3,respectively ML20091L0321984-06-0404 June 1984 Forwards Resumes & Statements of Independence for Jm Hendrie,Jm Biggs & JW Stanley to Conduct Idcvp ML20091N0281984-06-0404 June 1984 Forwards Closed Const Implementation Overview Item 060 Re Site Auditing ML20091N0421984-06-0404 June 1984 Forwards Closed Const Implementation Overview Nonconformance Identification Repts 022 & 027 ML20091N8001984-06-0101 June 1984 Forwards Closed Const Implementation Overview Items 070 & 086 Re Status Assessment Process & Nonconformance Identification Repts 022 & 023,respectively ML20091J8521984-05-31031 May 1984 Forwards Const Implementation Overview Weekly Rept 49 for 840514-18 ML20091H3931984-05-29029 May 1984 Forwards Open Const Implementation Overview Item 082/hold Point Notification.Audit Forms/Checklists Incomplete & Some Criteria of 10CFR50,App B Not Audited ML20091E7191984-05-24024 May 1984 Forwards Closed Nonconformance Identification Rept 019 Re Fddl Printouts Including Error in Unsolicited Drawings ML20091A2061984-05-23023 May 1984 Notifies of Idcvp 840531 Meeting W/Util & Bechtel in Ann Arbor,Mi to Discuss Status of Response to SEP Confirmed Items & to Obtain Info Re Standby Electric Power Sys Performance Requirements Review,Per 840530-0601 Visit ML20091E5051984-05-23023 May 1984 Forwards Closed Const Implementation Overview Item 063 Re Use of Fsk Prints Not Marked Status Assessment Print or W/Expiration Date ML20091J0021984-05-23023 May 1984 Informs That Tera Personnel Will Meet W/Bechtel in Ann Arbor,Mi on 840530-0601 to Discuss Idcvp Progress & Items Re Standby Electric Power Sys Performance Requirements Review ML20091N8801984-05-22022 May 1984 Forwards Independent Assessment of Underpinning Weekly Rept 87, for Wk of 840513-19 ML20092A6691984-05-22022 May 1984 Forwards 840510 Meeting Minutes Re Status of Independent Assessment of Underpinning & Remedial Soils Work ML20091E0691984-05-22022 May 1984 Forwards Tracked Action Item 086 Re Nir 022 & Nir 023. Requests One Reply Clarifying Initial Findings.Current Replies Provide Inaccurate & Conflicting Info ML20091E7521984-05-22022 May 1984 Forwards Closed Const Implementation Overview for Item 059 Re Failure to Maintain Audit Repts ML20091G9611984-05-22022 May 1984 Forwards Minutes of 840510 Meeting Re Third Party Assessment Activities Concerning Underpinning & Remedial Soils Work ML20091B4141984-05-21021 May 1984 Forwards Const Implementation Overview (Cio) Weekly Rept 48 for 840507-11.Rept Includes Summary of Cio Activity,Open Items,Nonconformance Identification Rept Summary & Hold Points ML20091B0711984-05-18018 May 1984 Forwards Const Implementation Overview Nonconformance Identification Rept 025 Re Inprocess Evaluation of Documents Received at Station 219.Item Closed ML20091C5691984-05-18018 May 1984 Forwards Open Const Implementation Overview/Hold Point Notification 085.Asterisked Items May Impact Phase I/Phase II Release ML20091J7711984-05-17017 May 1984 Forwards Open Const Implementation Overview Item 084 Re Verification of Quality Verification Program Activities in Module 800 E-G ML20091J7721984-05-17017 May 1984 Forwards Closed Const Implementation Overview Nonconformance Identification Repts 026 & 024 Re Deficiencies in Drawings, Including Rev 13 to Drawing C-130,Rev 7 to Drawing C-224, Drawing A-871 & Rev 17 to Drawing C-898 ML20091J9331984-05-17017 May 1984 Forwards for Action/Info,Const Implementation Overview Item 083 Hold Point Notification Re Noting on Visible Portion of Cable,Portion of Cable Not Inspected & Reason Why Cable Not Inspected ML20091C5021984-05-17017 May 1984 Forwards Independent Assessment of Underpinning Weekly Rept 86 for 840506-12.Minutes of Daily Meetings Encl ML20084R3661984-05-17017 May 1984 Forwards Open Nonconformance Identification Rept 033 Re Svc Water Pumphouse ML20090K5251984-05-16016 May 1984 Forwards Midland Nuclear Plant Units 1 & 2 Idcvp,Twelfth Monthly Status Rept for 840401-30.Next Ocr/Finding Status Review Meeting Will Be Held in mid-June.Meeting Notice & Agenda to Be Issued When Meeting Scheduled 1985-09-16
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20216E4721987-05-28028 May 1987 Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued ML20197F8331986-04-28028 April 1986 Advises That Response to Generic Ltr 86-04 Re Engineering Expertise on Shift Inapproriate at Present Because Midland Not Currently Under Const.Commitment to Provide Info Will Be Added to Commitment Tracking Sys ML20210L2351986-04-25025 April 1986 Forwards ALAB-106 Monthly Rept for Mar 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20203K8531986-04-23023 April 1986 Responds to NRC Re Allegation Concerning Adequacy of Pipe Whip Restraint Design.Project Records Placed in Storage & Personnel Performing Work Dispersed.Specific Design Approach Would Require Check of Records at Bechtel ML20203P1661986-04-21021 April 1986 Discusses 860407 Study Considering Options for Facility. Options Range from Abandonment of Facility to Completion as Nuclear Plant.Conversion of Plant to Combined Cycle gas-fired Plant Chosen as Most Favorable Option ML20209E6531986-03-28028 March 1986 FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order ML20140F8781986-03-25025 March 1986 Forwards ALAB-106 Monthly Rept for Feb 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20154H9651986-02-25025 February 1986 Forwards Nonconformance Repts Written or Closed During Jan 1986,per Memorandum & Order ALAB-106 ML20154D3581986-02-24024 February 1986 Confirms Items Agreed Upon in 860219 Telcon Re soil-related Issues.Util Will Discontinue Monitoring Dike Groundwater Wells During Shutdown & Site Maint.Authorization Given to Seal Weeping Wall Crack ML20198H2401986-01-24024 January 1986 Forwards ALAB-106 Monthly Rept for Dec 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20136F4771985-12-31031 December 1985 Forwards PNL-5718, Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20138Q5531985-12-31031 December 1985 Submits ALAB-106 Quarterly Rept 50.No New Individuals Assigned quality-related Duties Since 850930 Rept & No Const Activities Projected for Jan-Mar 1986 ML20136C5711985-12-20020 December 1985 Forwards Monthly Rept for Nov 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts,Quality Audit Findings,B&W Repts of Nonconformity & Util Nonconformance Repts,Per ALAB-106 ML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20137Z1481985-11-27027 November 1985 Advises That Response to 851029 IE Bulletin 85-001, Steam Binding of Auxiliary Feedwater Pumps, Inappropriate at Present Since Plant in Surveillance & Maint Status.Schedule for Response Will Be Provided When Status Changes ML20137F2541985-11-25025 November 1985 Forwards ALAB-106 Monthly Rept for Oct 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings,Per 730323 Order ALAB-106 & Amend 1 to Cp.Svc List Encl ML20138J4431985-10-25025 October 1985 Forwards Monthly Rept for Sept 1985,per Memorandum & Order ALAB-106 & Amend 1 to Cp,Including Bechtel Nonconformance Rept,Quality Action Requests,Mgt Corrective Action Repts, Quality Audit Findings & B&W Repts of Nonconformity ML20138D0031985-10-14014 October 1985 Informs That Util Will Submit Schedule for Meeting Requirements of 10CFR50.62(d) Per Generic Ltr 85-06 Re QA Guidance for ATWS nonsafety-related Equipment When & If Project Reactivated ML20133F7581985-10-0808 October 1985 Informs of Plans to Physically Disable Equipment Installed in & About Evaporator Bldg to Serve Process Steam to Dow Chemical Co,Per 850925 Resolution.Equipment & Structures Abandoned Are non-Q.Related Correspondence ML20137Y7921985-09-30030 September 1985 Submits Quarterly Rept 49,per ALAB-106.No New Individuals Assigned to quality-related Duties.Const at Plant Shut Down on 840716.No Const Projected for Fourth Quarter 1985.Next Quarterly Rept Will Be Submitted by End of Dec 1985 ML20133A3141985-09-27027 September 1985 Forwards Review of Section 4.7 of Technical Evaluation Rept PNL-5600, Review of Resolution of Known Problems in Engine Components for Tdi Emergency Diesel Generators, Reflecting Views Re Crankshafts for 16-cylinder Engines ML20133H1261985-09-25025 September 1985 Forwards Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings Written or Closed During Aug 1985,per Condition of Memorandum & Order ALAB-106 ML20138S0731985-09-17017 September 1985 Advises That Addl Excavation Between Tank Farm & Auxiliary Bldg Will Be Conducted Per NRC 850826 Authorization. Excavation Needed to Provide Supplemental Cathodic Protection.Svc List Encl.Related Correspondence ML20133H8841985-09-16016 September 1985 Discusses Ee Kent Allegations Re Plant,Per Encl . Decision Reflected in NRC Should Be Reconsidered. B Garde & T Devine of Gap Unwilling to Testify for Kent.Kent & Counsel Unable to Produce Expert Witnesses ML20140G8331985-08-23023 August 1985 FOIA Request for ACRS Documents Re Facility ML20137F7061985-08-12012 August 1985 Forwards Listed Documents Written or Closed During Jul 1985, in Accordance w/730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Only Nonconformance Repts Encl ML20133L8331985-08-0909 August 1985 Forwards Attachment 1 to Revised Exhibit D of Revised Compliance Filing & Application for Authorization to Issue Securities.Plan Is Requirement of Agreements W/Banks to Restructure Outstanding Debt.Related Correspondence ML20132B1841985-07-19019 July 1985 Forwards Monthly Repts for May & June 1985 Per Condition of 730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Related Correspondence 1989-04-28
[Table view] |
Text
f;nwc mi t -u.=z --_1
- on . -
STONE & WEBSTER MICHIGAN, INC. I~~-l l ':" ? I
- 't .
P.O. Box 2325, BOSTON. M ASSACHUSETTS O2107
(.4;_ .
~ NIIc.
United States Nuclear Regulatory Commission April 4, 1984 Midland Site Resident Office Route 7, J.O. No. 14358 Midland, Michigan Ref. MPF 80 Attention: Mr. R. Cook DOCKET No. 50-339/330 MIDLAND PLANT UNITS 1 & 2 INDEPENDENT ASSFSSMENT OF UNDERPINNING
+ REPORT NO. 80 A copy of the Independent Assessment of Underpinning Weekl;' Report No. 80 for the period of March 25, 1984 through March 31, 1984 is enclosed with this letter. Included as attachmente are the minutes of the daily meetings held during the week between members of the Assessment Team and Site Engineering, Construction, and Quality Assurance ' personnel.
If you have any questions with respect to this report please contact me at (617) 580-2067.
h E- A5
A. Stanley lacks Project Mtnager Enclosures ASL/pd cc:
JJHarrison (ene), US NRC Glen Ellyn, IL Grace Dow Memorial Library (enc)
DQuamme (ene) CPCo Midland (site)
JMooney (enc) CPCo Jackson JMeisenheimer (ene) CPCo Midland (site)
APR 1 6 1984-
~
8406010413 840518 PDR ADOCK 05000329
.GJ I'-
PDR. -' ,
-o .
-J. O'.-No. 14358-
-. Midland Plant Units 1 &;2' Independent Assessment of_Jnderpinning-Weekly Report No. 80 March 25, 1984 through March'31, 1984 Personnel on Site Stone & Webster Michigan,.Inc. -
P. Majeski 3/27 - 3/31 D. Benvie 3/26 - 3/31 '
D. Zito 3/26.- 3/30 '
L. Rouen 3/25 - 3/27 Parsons Brinckerhoff Michigan, Inc.
, J. Oliveira 3/27 - 3/31
- B. Metros 3/25 - 3/27 Meetings Attended.
~
Date Represented Purpose 3
3/19 - 3/23 Stone & Webster Daily Assessment
-Bechtel Team Meeting Consumers' Power Parsons 3/19 Consumers Power Inter-organizational Bechtel Meeting MPQAD Stone & Webster Underpinning and Remedial Soils -' Construction j Pier Kc4: Load transfer fer the pier was completed. Routine rejacking is in progress. .
Pier E/W16: Installation of the upper leveling and bearing plate assemblies has_been completed.- 'Ihe jackstand installation is in progress for both piers.
Piers CT1/12: Installation-of the transfer frames is in progress. -
Kc3 to Kc4 Drift: Installation of steel reinforcement for the drift invert mudmat is in progress.
Kc10 to Kc9 Drift: Installation.of steel embedments for the drift invert mudmat is in progress.
Access Shaft Level "C" Wales: . Installation of plates for support of the Level C Wales is in progress on both the east and west shafts.
SWPS: ' Installation of the upper level wale is in progress.-
m ...
,y % +
V
.a
2 J. O. No. 14358 Midland Plant Units 1 & 2 Independent Assessment of Underpinning
~ Assessment Team Observations - Construction s The Assessment Team observed the ongoing installation of the transfer frames for piers CT1/12. Work completed to date includes setting the '
, stabilizer plate and rockbolts into place, placement of the lower leveling and bearing plates, installation of the steel collar drift frame, placement of grout for the steel collar frame mudmat and setting the major transfer frame components into place. All concrete surfaces were roughened and moistened for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in accordance with .
procedures. Grout placement for the steel collar frame mudmat was continuous avoiding segregation and bleeding. Erection and splicing required to set the steel collar drift frame into place was accomplished in accordance with the procedures. Despite the confined working area, the Contractor was able to move the transfer frame beams and posts into place without damaging the transfer frame members or the appurtenant components that have already been installed. It is the opinion of the Assessment Team that installation of the transfer frames performed to date has been accomplished in accordance with project procedures and good construction practice.
Assessment Team Observations - QA/QC The Assessment Team reviewed the design drawings assigned to the UAT work print station of the Auxiliary Building underpinning. The review consisted of checking the drawings for proper revision number, proper posting of attachments, legibility and proper identification stamps.
Four deficiencies were found with respect to posting of attachments and drawing revisions. As a result, NIR No. 24 was issued. The deficiency rate was less than 2 percent of the total attributes considered.
However, the Assessment Team recomends the Contractor should put forth additional effort to maintain the documents properly. During the review of this work print station, two additional drawings were posted that were not shown on the internal distribution list. The Contractor was informed and these drawings were added to the list.
Compressive strength testing for. piers CT1/12 concrete cylinders at the US Testing laboratory was overviewed by the Assessment Team. . Curing and capping of cylinders was accomplished in accordance with project procedures. During ic3d application, the US Testing technician performing the test did not use the maximum load indicator on the pressure gage as required by ASIM procedures. As a result, the Assessment Team issued NIR No. 25. All other aspects of the test were in accordance with procedures.
The Assessment Team reviewed 150 Inspection reports for proper certificatien of MPQAD inspectors. These reports covered inspections of various
= construction activities. Based on this_ review, the Assessment Team concludes that the Inspectors were properly certified.
Work Activity Packages No Work Activity Packages were overviewed or active during the past week.
n._
3
- 0. No. 14358
- Midland Plant Units 1 & 2 Independent Assessment of Underpinning Nonconformance Identification Reports '
The following Nonconforinance Reports (NIRs) remain open or have been closed during the week.
IR No. Description Status (Opened)(Closed) 22 Resident Engineering 2/21/84' .
Document Control Stations 23 Subcontractor 3/13/84 3/28/84
}, Work Print Stations 24 Design Drawing 3/30/84 Review at UAT Workprint Station 25 Compressive Strength 3/30/84 Testing of Concrete L Cylinders Open Items Items discussed during meetings are categorized as follows:
OPEN ITEM' - An item for which an action is required. The item will remain open until the-required action has been taken. Tracking is required.
CIDSED ITEM - An item, usually brought forward by the Assessment-Team that is discussed and adequately responded to. No tracking is. required.
4 INFORM;. TION ITEM - An item, brought forward to provide general background informatica regarding work, such 's a work status or an upcoming design change. No tracking is required.
' OPINION ITEM - An opinion or suggestion, given by the Assessment Team expressing an alternate construction or-quality assurar. e. technique.-The-opinion or suggestion is given as a possible alternate that may facilitate an operation.
CIDSES ITEM -XX-XX - This notation identifies an a'ction that. closes a s previously identified open item. Tracking of the item stops..
The following listing of all Open items from the Daily Meeting ~ Notes.with
, .Bechtel and the text of the Weekly Reports. Carry-over items from past-weeks have been Closed this week are also listed.
Item No. Description- -Closure 64-7' QAP Review Program -Open
- 64-10 ' Trend Analysis open .
k
" F
4
-J. O. No..14358 Midland Plant
. Units 1 & 2
, Independent Assessment of Underpinning Item No. Descriptica , Closure 71-17 Computerized Civil .Open Drawing Register 71-29 Useof " Retired" FCRs 80-27 74-21 US Testing Corrective Open Action ,
25 Expansion Anchors Open 75-9 REDocument Control 80-28 77-12 FCRProcessing Task Force Open
., 77-13 Drawing Attachment Stamp 80-10 79-5 BearingPlate at Kc9 80-12 79-26' UpperLeveling Plate Open 79-28 SWPSBaekpacking Material Open 79-34 SWPSBackpacking Placement Open 80-28 _
~ Resident Engineering- Open Document Control b b Project Engineer'-
bE Le Project Muagbr.
b ,
l t
Notes. of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Consumers Pcwer Company s
Held at Midland Site Midland, Michigan March 26, 1984 Present For:
Consumers Power Bechtel MPQAD Stone & Webster G. Murray J. Kelleher R. Sevo L. Rouen -
R. Wheeler S. Hartstern J. M: Master D. Benvie D. Lavelle D. Zito Parsons Brinckerhoff B. Metros PURPOSE ,
This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
DISCUSSION Status Items Item 80 Auxiliary Buildir6 Underpinning Activities.
Placement of concrete in the CT-1/12 pier shafts has been completed.
Installation of the upper and lower leveling and bearing plates has been ec=pleted for pier Kc4.
The lower leveling plates for piers E/W-16 have been grouted into. place.
(INFORMATION ITEM)
Item 80 Bearing Plate at.Kc9.
In response to a Bechtel question concerning the pier.Kc9 upper leveling plate, D. Benvie clarified the Assessment Team'sconcern. He stated that the Assessment Team's concernwas with compatibility of fabrication vs ' installation tolerances.
D. Lavelle agreed to resolve the concern. (Item 79-5 remains OPEN)(INFORMATION
! HB) i Item 80 NIR 23-Subcontractor Work Print Station.
j R. Sevo stated that the MPQAD response to HIR 23 will be transmitted to the i - Assessment Team today. (INFORMATION ITEM) j Item 80 Trend Analysis.
J. AcMaster reported that implementation of the revised trend analysis program has been rescheduled from 4/2/84 to 5/1/84. The present trending. ,
system remains in effect. (INFORMATION ITEM) )
1 1
k -
r 6
- Notes of Daily Meeting Independent Assessment of Underpinning
~
Midland Plant, Units 1 & 2
. Consumers Power Company Held at Midland Site Midland, Michigan March 26, 1984
- New> Items
- Item 80 Action Plan for Engineeiing Document Control.
! D. Lavell'e stated that a presentation detailing specifics of the ' '
revised document control program for' Resident Engineering is scheduled
. for 3/28/84 (INFORMATION ITEM)
- Item 80 Receipt Inspection for Piers CT 3/10 Transfer Frames.
L. Rouen noted that receipt inspection for the piers CT 3/10 transfer frames have not been performed. The Assessment Team asked if the receipt inspection will be accomplished soon to provide an adequate period of time to undertake corrective action if needed prior to c the planned installation date. FSO will respond. (OPEN ITEM)
~
Response Items No response items were addressed.
l t
_i .
~
r _
]
Notes of Daily Meeting Independent. Assessment of Underpinning Midland Plant' Units 1.&-2
' Consumers Power Company i-Held.at Midland Site Midland, Michigan
- &rch 27, 1984
. ~
Present For:
Consumers Power Bechtel MPQAD , Stone & Webster G. Nrray D. lavelle R. Sevo L. Rouen -
- R. Wheeler J. Kelleher J. Mc& ster D. Benvie E. Cvik1 D. Zito Parsons Brinckerhoff B. Metros PURPOSE f
This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2 .
DISCUSSION
' Status Items Item 80 Auxiliary Building Underpinning Activitics.
Installation of the steel collar frame has been completed.
The W8 grillage was locked off yesterday. - At the time of lock off, the amount of upward building movement has decreased from 63 mils' measured just prior to start of Jacking to 53 mils.
] The upper leveling and bearing platie. assembly has been installed for pier E16.
(INFORMATION ITEM)
Item 80 SWPS Underpinning Activities.
D. Lavelle reported that placement of concrete-for a portion of the SWPS Carlson meter encasements is scheduled for 3/28/84. (INFORMATION ITEM)
New Items Item 80-9 -- SWPS Bnbedded Plates.
D. ' Benvie asked if FSO still planned to cut the rebar at selected areas on the SWPS north wall in order to facilitate embedded plate installation.
J.- Kelleher responded that the shear lug locations for the embedded plates will be adjusted to compensate.for the location of the existing rebar.. alleviating
, the need to cut the-reinforcing steel.- (CLOSED ITEM)_
Response Items Item 80 Drawing Attachment Stamp. p 4 E. Cviki' addressed.the AssessmentTeam's question concerning methods for posting attachments to the ResidentEngineer's controlled drawings. He.
.-provided the ' Assessment Team with a copy of the new adshinistrative procedure w ,
s - - , , e
- - - ... ~ - -. - - - --
Not:0 of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units .1 & 2 ,
Consumers Power Company i l
Held at Midland Site l Midland, Michigan '
March 27, 1984 for maintaining and distributing the Resident Engineers' controlled documents and attachments. The procedure requires that all FCRs/FCNs, DCNs and SCNs be attached to the back of the appropriate drawings. '
Previously, the procedures allowed the change documents to be either attached to the back of the drawing or listed on a block stamp on the front of the drawing and maintained in a separate location. The Assessment Team believes that designation of one method to post attachments to drawings will preclude the possibility of missing or improper posting of attachments. (CLOSES ITEM 77-13)
Item 80 Receipt Inspection of Piers CT1/10 Transfer Frames.
J. McMasterresponded to the Assessment Team question concerning receipt inspection of the transfer frames for piers CT3/10. MPQAD will inspect the transfer frames in the next two weeks. Since the i load transfer for piers CT3/10 is not scheduled until 7/84, imple-mentation of corrective action,'if required, will not impact completion of the piers. (CLOSES ITEM 80-6)
Item 80 Iower Bearing Plate at Pier Kc9.
]'.. D. lavelle responded to the Assessment Team question concerning compatibility of fabrication vs installation tolerances for the pier Kc9 bearing plate. An evaluation of the tolerances by FSO has shown that there is no conflict between fabrication and installation
, requirements. Based upon a Visual inspection, the underpinning sub-
! contractor rejected the bearing plate because of. warpage. A subsequent check of the rejected bearing plate with feeler gauges showed the plate to be within acceotabl.e tol.erances. (CIAW ITD4 79-5) 4 i
=
0
E. ~
4-
.: Notes of_ Daily Meeting . .
1 Independent Assessment'of Underpinning Midland Plant, Units 1 & 2
- Consumers Power Company
- Held at Midland Site -
l- Midland, Michigan:
p March 28, 1984 ~
- Present For:
' Consumers Power Bechtel MPQAD Stone & Webster G. Murray D. Lavelle J. McMaster~ D. Benvie R. Wheeler J. Kelleher G. Carpenter D. Zito 1 E. Cviki P. Majeski F J. Gaydos_ .
! S. Hartstern Parsons Brinckerhoff Part. time ~ e J. Oliveira i
i PURPOSE This meeting _is held .each day to discuss items regarding the Independent Soils Assessment'at the Midland Plant, Units 1 & 2.
DISCUSSION Status Items Item 80 Auxiliary Building Underpinning Activities.
Placement of the grout mudmat in the instrumentation pits for piers CT1/12.
t was completed.
The jackstands and jacks have been installed for. pier Kc4.-
The upper leveling and bearing plate assembly' for piers E/W16 have been grouted into place.
(INFORMATION ITEM): .
Item 80-14 SWPS Underpinning Activities.-
J. Kelleher stated that an FCR is being processed to relocate shear. lugs required for installation of the embedded. plates on the SWPS north wall.
Shear lugs are being relocated.to allow their installation without having to cut existing rebar on the north wall. _(INFORMATION ITEM)-
New-Items Item 80 Document' Control' Upgrading.
J. Brown of Bechtel provided a status of the Document Control upgrading activities and a summary of future changes.--' She indicated that the > plans.
include-the development of a Master Document Control Center, an element- ~
of which will be the Field Document Control Center (FDCC). - Five stations -
with controlled documents will be established. These stations will be managed by the: FDCC to assurtthat documents are controlled 'in a uniform manner throughout the site. The Design Document Register will be the means used to control the attachments to doctments'as well as their -
distribution on site. A review group internal to document control will.
be used to assure that the_ documents are maintained properly.- An
Notca of Daily Meeting . .
Independent Assessment of Underpinning
. Midland Plant, Units 1 & 2 ,
Consumers Power Company.-
Held at Midland Site
- Midland, Michigan -
March 28, 1984 evaluation is currently underway'to. decide whether the Resident Engineering Document Control Center should become a new station serviced.by FDCC or should' remain independent. 'Ihe upgrading of the. Document Control System is expected to be complete during tne third quarter' of this year.
(INFORMATION ITEM)
Response Items
. No response items were addressed.
I f
i 4
4 b
l- .
i-y '>' =- s v a <we w 4 -
+
- Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Consumers Power Company Held at Midland Site -
Midland. Michigan March 29, 1984 Present For:
Consumers Power Bechtel MPQAD Stone & Webster R. Wheeler D. lavelle J. McMaste'r P. Majeski J. Kelleher J. Moran D. Benvie E. Cvik1 D. Zito S. Hartstern J. Gaydos Parsons Brinckerhoff J. Davies J. Oliveira PURPOSE This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.
DISCUSSION Status Items Item 80 Auxiliary Building Underpinning Activities.
The lower leveling plates have been installed in piers CT1/12.
Load transfer for pier Kc4 has begun.
Installation of embedded channels in the Kc10 to Kc9 drift invert is in progress.
(INFORMATION ITEM)
-Item 80 SWPS Underpinning Activities.
M. Blendy discussed a potential leakage problem below the bentonite seal.
The leakage is suspected based upon observation well readings. It is believed that water may be seeping through the gravel and riprep layer below the . Seal. FSO will perfom a visual inspection and use dye to trace any water flow through these permeable layers. (INFORMATION ITEM)
Item 80 ' Use of " Retired" FCRs.
J. Kelleher provided the Assessment Team with revised construction and engineering procedurcs related to the preparation and control of FCRs/FCNs.
The Assessment Team was advised that these procedores address the handling and use of " Retired" FCRs. (ITEM 71-29 remains OPEN) (INFORMATION ITEM)
New Ite:ns Item 80 Document Review of UAT Workprint Station.
P. Majeski infomed FSO that the Assessment Team will perform a document review at the UAT workprint station. (INFORMATION ITEM) t:-
4 Not53ofDaily. Meeting _
i Independent Assessment of Underpinning Midland Plant, Units-1 & 2
- Consumers Power Company i
, Held at Midland Site '
Midland, Michigan '
N rch 29,-1984 l Item 80 MPQAD Welding Audit.
D. Lavelle stated that the MFQAD welding audit has been completed.
A report detailing findings will be issued in the nep two weeks.
(INFORMATION ITEM)
Item 80 ~ Weekly Report # 79.
The text of Weekly Report # 79 was reviewed. It was determined that all open items had been previously identified. (INFORMATION ITEM)
Item 80 Stablizer Plate Oversized Holes.
J. Oliveira asked if an FCR was being prepared to allow the use of oversized rock bolt holes in order to simplify installatien of the piers CT1/12 stabilizer plates. J. Kelleher responded that rock bolts and plates needed for the transfer frame stabilizer plates.will be installed as one unit. Installing the assembly as one unit will not require oversize holes. (CLOSED ITEM)
Response Items Item 80 NIR 23 Subcontractor Work Print Sta'lons.
c The Assessment Team completed their review of the response to NIR 23 which identifies work station document deficiencies. The response stated' that errors noted in NIR 13 have been corrected. Additionally, the results of a "self audit" conducted by FSO of their controlled documents indicate that these documents are being maintained in,a satisfactory manner.
The Assessment Team verified the correction _of the deficiencies and reviewed the "self audit" report. - Based upon this information, NIR 23 was closed I
on 3/28/84. (INFORMATION ITEM) i f
y
. __;__ _x. - - -
\
~
-Notes of Daily Meeting I,ndependent Assessment of Underpinning Midland Plant, Unita 1.& 2
+
Consumers Power Company
' Held at Midland Site-reh 30, 4 t Pmsent For:
< Consumers Power-- Bechtel MPQAD Stone & Webster R. Wieland . D. Lavelle J. McMaster P. Majeski , l J. Kelleher J. Moran D. Benvie !
Cvikl
^
E. D. Zito S. Hartstern l
J. Gaydos Parsons Brinckerhoff M. Blendy J. Olivsira PURPOSE This meeting _is held each day to discuss items regarding the Independent
- Soils Assessment at the Midland Plant, Units 1 & 2.
[ DISCUSSION i- Status Items
' Item 80 Auxiliary Building Underpinning Activities.: ,
The lower leveling plates have been set into place and the stabilizer j plate rock bolts have been set into place for piers CT1/12.-
Installation of the rebar has begun for the pier Kc3 to Kc4 drift invert.
i (IN MRMATION ITEM)
Item 80 FCR Processing Task Force.
s- .
1 M. Blendy discussed the status of the FCR processing task force study
! undertaken to improve the' FCR response time. Primary objectives of.the-task force include identification of delay 3' during FCR processing, 4
designating suitable process times and establishing an~ average rate of' FCRs to be processed and addressed daily. Additionally a planning group
. has been established to' identify areas in advance where FCR's are required in order to levelize the work load and reduce the number'of critical FCR's i which may impact work progress. (ITEM 77-12 remains OPEN) (INFORMATION ITEM)
New Items .
,- Item 80-26'- NIR 24 --Design Drawings at UAT Workprint Station. ,
[ P. Majecki~ stated the Assessment Team had completed their review of design drawings at the UAT workprint station.- As a result of the review, NIR 24 will be issued today describing deficiencies noted by the Assessment-.. ,
Team.~ These deficiencies were two missing attachments to _the design drawings, t .the posting of.a' drawing that was not a current issue and a: drawing attachment not identified in the block stamp. .(IN MRMATION ITEM) .
I wY
= -
q Notes of Daily Meeting.- .
Independent Assessment of Underpinning Midland Plant, Units 1 & 2
. Consumers Power Company Held at Midland Site ,
Midland, Michigan thrch 30,1984 Response Item Item 80 Use of Retired FCRs.
he Assessment Team has completed their review of doc'ument control '
procedures that have been revised to improve the handling and use of " retired" FCRs. In lieu of retiring one time deviation FCRs from the controlled documents after 30 days, all fbture one time deviation FCRs will either be directly incorporated into the design docu w nt or referenced on the document with a brief description.
Additionally, one time deviation FCRs written in the past will be incorporated into or referenced on the design-drawings. The Assessment Team believes direct incorporation or referencing of one time deviation FCRs on the design documents will improve the handling of this type of FCR. This item is now closed. (CLOSES ITEM 71-29)
Respense Items Itera 80 Resident Fngineering Document ~ Control.
]
The Assessment Team reviewed project engineering procedures and administrative procedures for handling and maintaining the Resident Engineers Controlled documents. Inconsistencies were noted between the administrative and project engineering procedures in regards to posting of attachments and annotating the drawings to signify a revision is in progress. The Assessment Team requested the Contractor to review the project engineering and administrative procedures related to controlled documents in order to identify and resolve these inconsistences.- (CLOSES ITm 75-9) (OPEN IT E) w G
f'