@ COIISilmBIS Power James W Cook b
Vice President - Projects, Engineering and Construction oeneral of*1ces: 1945 West Parnell Road, Jackson, MI 49201 * (517) 78& O453 December 31, 1985 Director of Office of Inspection and Enforcement Att: Mr James Taylor US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT - ALAB-106 QUARTERLY REPORT #50 DOCKET NOS 50-329 AND 50-330 FILE:
0.4.6 SERIAL
32491
Reference:
a) Letter, J W Cook to J Taylor, ALAB-106 Quarterly Report, Serial 32400, dated September 30, 1985 No new individuals have been assigned quality related duties since the last report (reference a); thus no resumes are required for this report.
Construction at the Midland Energy Center has been shut down since July 16, 1984. No construction activities are projected for the period January 1, 1986 through March 31, 1986.
The next ALAB-106 Quarterly Report will be sent the end of March 1986.
i JWC/WRB/Ir CC: JGKeppler, NRC Region III 8512270293 851231'
~