ML20091J002

From kanterella
Jump to navigation Jump to search
Informs That Tera Personnel Will Meet W/Bechtel in Ann Arbor,Mi on 840530-0601 to Discuss Idcvp Progress & Items Re Standby Electric Power Sys Performance Requirements Review
ML20091J002
Person / Time
Site: Midland
Issue date: 05/23/1984
From: Levin H
TERA CORP.
To: Jackie Cook, Eisenhut D, James Keppler
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), Office of Nuclear Reactor Regulation
References
OL, OM, NUDOCS 8406050358
Download: ML20091J002 (3)


Text

_

y {2, 6

L J 1

PRINCIPAL STAFF May 23,1984

%A~

(Mp0PRP

4%*

3/RA DE A/RA DRMSP

~

~

RC DRMA

. Mr. James W. Cook PA0 5CS Vice President SGA ML Consumers Power Company ENF File /edr 1945 West Parnall Road Jackson, Michigan 49201 Mr. J. G. Keppler Administrator, Region ill Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. D. G. Eisenhut Dit setor, Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket Nos. 50-329 OM, OL and 50-330 OM, OL Midland Nuclear Plant - Units I and 2 Independent Design and Construction Verification (IDCV) Program Meeting Notice During the period, May 30 through June I,1984, TERA IDCVP personnel will visit Bechtel's Ann Arbor Michigan offices to status the Project's response to Confirmed items and obtain information related to the Standby Electric Power (SEP) System Performance Requirements review.

A potential exists for discussion of matters of substance to the disposition of the following Confirmed items:

o C-109 s C-141 e C-161 e C-172 e C-l10 e C-146 e C-162 e C-133 e C-147 e C-163 e C-135 e C-150 e C-165 Should discussions of this nature be necessary, we have made provisions for o meeting by identifying a period of time that these discussions would take place.

The status of response to Confirmed items will be reviewed between TERA and the Midland project representatives during this time period irrespective of whether or not a need is identified to discuss the specific Confirmed items, in accordance with th'e IDCVP protocol, the following meeting notice is given.

gO) $i ~ ~ 'h 8406050358 840523 ppR Apocn 05000329 0g A

PDR

> 0 TERA CORPORATION 7101 WlSCONSIN AVENUE BETHESDA MArMAND 20814 301 654 8960

4 Multiple Addressees 1

'Date:

May 31,1984 Time:

1:00 - 4:00 p.m.

Location:

Bechtel Offices Conference Room 1B1/1B2 777 East Eisenhower Parkway Ann Arbor, Michigan

Subject:

Status of Response to SEP Confirmed items and Discussion of SEP Confirmed items (Tentative)

Participants:

F. Dougherty, G. Setka, G. Reimers, TERA W. Parmley, Consumers Power Company R. Burg, et al., Bechtel

. Sincerely,

./

6%,%v i,CC L Howard A. Levin Project Manager Midland IDCV Program l-cc:

Participants l

L. Gibson, CPC i

R. Erhardt, CPC D. Budzik, CPC D. Quamme, CPC (site)

J. Agar, Babcock & Wilcox R. Whitaker, CPC (site)

J. Taylor, NRC, l&E T. Ankrum, NRC, I&E

. J. Milhoan, NRC, I&E

. D. Hood, NRC, NRR J. Karr, S&W (site)

Midland IDCVP Service List

~ HAL/sl TERA CORPORATION

SERVICE LIST FOR MIDLAPO INDEPEbOENT DESIGN APO CONSTRUCTION VERIFICATION PROGRAM cc: - Harold R. Denton, Director Ms. Barbara Stomiris Office of Nuclear Reactor Regulat. ion 5795 N. River U.S. Nuclear Regulatory Commissim Freeland, Michigan 48623 Washington, D.C. 20555 Mr. Wendell Marshall James G. Keppler, Regional Administrator Route 10 U.S. Nuclear Regulatory Commission, Midland, Michigan 48440 Region til 799 Roosevelt Rood Mr. Steve Godler Glen Ellyn, Illinois 60137 2120 Corter Avenue St. Paul, Minnesota 55108 U.S. Nuclear Regulatory Commission Resident inspectors Office Ms. Billie Pirner Garde A 1 d' Michi9 n 48640 for Accountable Government Government Accountability Project Mr. J. W. Cook Institute for Policy Studies Vice Pres,ident 1901 Que Street, N.W.

Consumers Power Company Washington, D.C. 20009 1945 West Pornoll Road Jockson, Michigan 49201 Charles Bechhoefer, Esq.

Atomic Safety & Licensing Board Michael 1. Miller, Esq.

U.S. Nuclear Regulatory Commission Isham, Lincoln & Beale Washington, D.C. 20555 Three First National Plazo, Sist floor Dr. Frederick P. Cowan Chicago, Illinois 60602 Apt. B-125 6125 N. Verde Trail James E. Brunner, Esq.

Boca Roton, Florido 33433 Consumers Power Company 212 West Michigan Avenue Jerry Horbour, Esq.

Jackson, Michigan 49201 Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Ms. Mary Sinclair Washington, D.C. 20555 i

5711 Summerset Drive Midland, Michigan 48640 Mr. Ron Collen Michigan Public Service Commission Cherry 2 Flynn 6545 Mercontile Way Suite 3700 P.O. Box 30221 Three First National Plaza Lansing, Michigan 48909 Chicago, Illinois 60602 Mr. Poul Rau Ms. Lynne Bernobel Midland Daily News Government Accountability Project 124 Mcdonald Street 1901 Q Street, NW Midland, Michigen 48640 Washington, D.C. 20009 3

L 4

i

,,,,..-.,,-.nm,,

.,-n-

,-ag,-

,,-n-,se,.

,-n--,---,...,y,,w.