MONTHYEARIR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 and Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24067A2532024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators 2024-09-24
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0510903042005-04-0808 April 2005 March 2005 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0508903502005-03-11011 March 2005 February 2005 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0505302232005-02-0909 February 2005 January 2005 Monthly Report for R.E. Ginna Nuclear Power Plant ML0501902012005-01-0707 January 2005 December 2004 Monthly Operating Report for the R.E. Ginna Nuclear Power Plant ML0436303412004-12-10010 December 2004 November 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0432203622004-11-10010 November 2004 October 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0428804842004-10-0808 October 2004 September 2004 Monthly Report for R E Ginna Nuclear Power Plant ML0426600732004-09-10010 September 2004 August 2004 Monthly Report for R.E. Ginna Nuclear Power Plant ML0423105522004-08-10010 August 2004 July 2004 Monthly Operating Report for R E Ginna ML0420803112004-07-0909 July 2004 June 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0417406162004-06-10010 June 2004 May 2004 Monthly Report for R.E. Ginna Nuclear Power Plant ML0413404292004-05-10010 May 2004 April 2004 Monthly Operating Report, R. E. Ginna Nuclear Power Plant ML0411305012004-04-0909 April 2004 March 2004 Monthly Operating Report for Ginna Nuclear Power Plant ML0407607272004-03-0909 March 2004 February 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0404905182004-02-0909 February 2004 January 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0402104802004-01-0909 January 2004 December 2003 Monthly Operating Report for R E Ginna Nuclear Power Plant ML0335002382003-12-0909 December 2003 November 2003 Monthly Operating Report for R.E. Ginna ML0332400652003-11-10010 November 2003 October 2003 Monthly Report for R. E. Ginna Nuclear Power Plant ML0328804542003-10-0909 October 2003 September 2003 Monthly Operating Report for R. E. Ginna ML0326610622003-09-10010 September 2003 August 2003 Monthly Operating Report Ginna Nuclear Power Plant ML0322704182003-08-0707 August 2003 July 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0319804382003-07-10010 July 2003 June 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0316812672003-06-10010 June 2003 May 2003 Monthly Operating Report for R.E. Ginna ML0314006772003-05-0909 May 2003 April 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0314005802003-05-0909 May 2003 September 2001 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0310704452003-04-10010 April 2003 March 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0307704542003-03-10010 March 2003 February 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0305202172003-02-10010 February 2003 January 2003 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0301706072003-01-10010 January 2003 December 2002 Monthly Operating Report for R. E. Ginna ML0235205042002-12-0909 December 2002 November 2002 Monthly Operating Report for R.E. Ginna ML0231900622002-11-0808 November 2002 October 2002 Monthly Operating Report for R.E. Ginna ML0229000102002-10-0909 October 2002 September 2002 Monthly Operating Report for R.E. Ginna ML0226006432002-09-10010 September 2002 August 2002 Monthly Operating Report for R. E. Ginna ML0223102702002-08-0707 August 2002 July 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0221203692002-07-12012 July 2002 June 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0217101442002-06-10010 June 2002 May 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant, Revision ML0215004232002-05-17017 May 2002 April 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0214204182002-05-0606 May 2002 April 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0210904432002-04-10010 April 2002 March 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0208604272002-03-0808 March 2002 February 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0205802142002-02-11011 February 2002 January 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0203504532002-01-10010 January 2002 December 2001 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML18142B3881976-02-0909 February 1976 R. E. Ginna - Forwards Revised (Item #6) Operating Data Report for Month of January 1976 ML18142B3891976-02-0606 February 1976 R. E. Ginna - Forwards Monthly Operating Status Report for Month of January 1976 ML18142B3901976-01-0808 January 1976 R. E. Ginna - Forwards Revised Unit Shutdown and Power Reduction Data Sheet for Monthly Operating Report for December 1975 ML18142B3911976-01-0808 January 1976 R. E. Ginna - Forwards Monthly Operating Status Report for Month of December 1975 ML18142B3921975-12-0404 December 1975 R. E. Ginna - Forwards Monthly Operating Status Report for Month of November 1975 ML18142B3931975-11-0606 November 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of October 1975 ML18142B3941975-10-0202 October 1975 R. E. Ginna - Forwards Operating Status Information for Month of September 1975 ML18142B3951975-09-0505 September 1975 R. E. Ginna - Forwards Operating Status Information for Month of August 1975 2005-04-08
[Table view] |
Text
t-AAO Rg Z An Energy East Company ROCHESTER GAS AND ELECRIC CORPOMAJION
- 89 EASTAVENUE, ROCHESTER, N.Y 14649-0001 585 546-2700 www.,excom April 10, 2003 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate I-1 Washington, DC 20555
Subject:
Monthly Report for March 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuantto Ginna Improved Technical Specifications Section 5.6.4, attached is the monthlyoperating status report for Ginna Station for the month of March 2003.
Very truly yours, sep A. Widay C}
Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT 50-244 April 10, 2003 COMPLETEDBY: K J TL John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS
- 1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
- 2. Reporting Period: March, 2003
- 3. Design Electric Rating (Net MWe): 470
- 4. Maximum Dependable Capacity (Net MWe): 480 This Month Yr.-to-Date Cumulative**
- 5. Number of hours Reactor Was Critical 744.0 2160.0 241176.9
- 6. Hours Generator On-line 733.1 2149.1 238008.2
- 7. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
- 8. Net Electrical Energy Generated (MWH) 358503.4 1060698.4 108389607.4
- CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969
I, DOCKET NO: 50-24 UNIT NAME- M.,
R.E..- GINNA NUCLEAR POWER PLANT _
DATE: April 10. 2003 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD: March 2003 (Month/Year)
NO. DATE TYPE DURATION REASON(') METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN(2) COMMENTS 1 030301 S 10.9 B 1 Feedwater regulator valve actuator repair AOV-4269 A A-L --
SUMMARY
The unit was shut down on March 1, 2003 for repairs to AOV-4269. Ginna Station was off-line from 0611 to 1704. Power was increased gradually and the unit reached full power at 0600 on March 2, 2003. The unit remained at full power for the remainder of the month. Average power for the month of March was 97.0%/6.
(1) Reason (2) Method A - Equipment Failure (Explain) 1- Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D- Regulatory Restriction 4- Continuation E - Operator Training/Umense Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)