ML18142B395

From kanterella
Jump to navigation Jump to search
R. E. Ginna - Forwards Operating Status Information for Month of August 1975
ML18142B395
Person / Time
Site: Ginna 
Issue date: 09/05/1975
From: Platt C
Rochester Gas & Electric Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML18142B395 (10)


Text

s MO~Y REPORTS (FOR GRAY BOOK PREPA~ION)

NRC DISTRIBUTION FOR PART 50 DOCKET. MATERIAL U

s

~

/

~M'TEMPORARYFORM)

~6 FI[ F MONTHLY REPORT FILE FROM Rochester Cas 8e Electri Rochester, N.Y..

Charles E. Plat%

ee)I E OF DOC DATE R EC'D LTR s

, TWX RPT OTHER TO:

CLASS UNCLASS PROPINFO ORIG 1 Signed.

INPUT CC OTHER NO CYS REC'D ssx SENT LOCAL PDR DOCKET NO:

DESCRIPTION:

Ltr trans the following:

PLANT NAME RE Ginna p 1 ENCLOSURES Monthly Report for Au st 1

.Plant

& Component Operability & Availability This Report to be used in preparing Gray Book gaby Plans

& Operations.

NUMBER OF COPIES REC'D:

FOR ACTION/INFORMATION SAB BUTLER (L)

W/ Copies CLARK (L)

W/ Copies PARR (L)

W/ Copies KNIEL (L)

W/ Copies SCHWENCER (L)

ZIEMANN(L)

REGAN (E)

W/ Copies W/ Copies W/ Copies STOLZ (L)

DICKER (E)

LEAR (L)

.Qo XT W/ Copies W/ Copies w/ copies

~"PT RgMpjg VASSALLO (L)

KNIGHTON (E)

SPELS W/ Copies W/ Copies W/ Copies P~yp.

EMPURPLE (Ll YQUNGBLQDD(Ei~ s('(Pc/PE

~ LNPt/(Tggnm W/ Copies W/ Copies '.'4 Copies

~Gpss INTERNALDISTRIBUTION Fl

~NRC P R

OGC, ROOM P-506A.

GOSSI CK/STAF F CASE G IAMBUSSO BOYD MOORE (L)

DEYOUNG (L)

SKOVHOLT (L)

GOLLER (L) (Ltr)

P. COLLINS DENISE REG OPR FII.F. A REGION (2)

STEE LE TECH REVIEW SCHROEDER MACCARY KNIG HT PAWLICKI SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO J.

COLLINS LAI NAS BENAROYA VOLLMER DENTON G R IMES GAMMILL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIGHTON YOUNGBLOOD REGAN PROJECT LDR HARLESS LIC ASST, R. DIGGS (L)

H. GEARIN (L)

E. GOULBOURNE (L)

P. KREUTZE R (E)

J. LEE (L)

M. KUBH3ROOK (L)

S. REED (E)

M. SERVICE (L) gS. SHEPPARD (L)

M. SLATER (E)

H. SMITH (L)

S. TEETS (L)

G. WILLIAMS(E)

V. WILSO~ (L)

R. INGRAM (L)

M DUN A A/T IND

~

BRAITMAN SALTZMAN ME LTZ PLANS

~MCDONALD

~CHAPMAN DUBE (Ltr)

E. COUPE PETERSON HARTFIELD (2)

KLECKER EISENHUT WIGGINTON EXTERNAL DISTRIBUTION LOCALPDp@~ons~iti.Rochester N.Y.

~1 TIC (ABERNATHY)

(1)(2)(10) NATIONALLABS

~1 NSI C (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 ASLB 1

CONSULTANTS 1 NewtonI anderson NEWMARK/8LUME/AGBABIAN ACRS I,GLDING/SENT 1 PD R-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSON, ORNL 1 AGMED (RUTH GUSSMAN)

Rm 8-127 GT 1 J. D. RUNKLES, Rm E-201 GT

H I

R t'

N

gt~egu atoJff i

n/,

mazuma szzsztz

.Pjte CfJ."

lRD

~l~.i'V",";;l'OCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE AREA COOE Tld 546-2700 Ginna Station September 5>

1975 Office of Plans and Schedules Directorate of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Subject:

Monthly Report for August>

1975 Operating Status Information R.

E. Ginna Nuclear Power Plant Unit No.

1 Docket No. 50-244 j

H$

(Q o

I,=-'-"'py'@~

~ Af Q~~

Gentlemen:

Pursuant to the letter dated February 19, 1974 of Mr. L. Manning Muntzing, Director of Regulation, enclosed herewith is the requested operating status information of the Ginna Station for the month of August.

Very truly yours>

CEP:fah Enclosures (3)

Charles E. Platt Superintendent cc:

Mr. James P, O'Reilly

l

~

~

~

~

i

(

f

~

t

SUMMARY

Reactor power level averaged 99.3% in reporting period, with the following significan exceptions:

Power level reduction to 56% to maintain transmission line capabilities>

on 8/3/75.

Power level reduction to 47% to per-form T-18B> Turbine Main Steam Stop Valves Test>

on 8/24/75 REPORT MONTH August>

1975 UNIT NAME Ginna Station, Unit gl Se tember 5

1975 COMPLETED BY Andrew E. McNamara, Operations Aide Telephone fkl-716-546-2700> Ext. 291-214 at Ginna PLANT SHUTDONNS DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)

REASON (1)

METHOD OF SHUTTING DOWN THE REACTOR (2)

COMMENTS No outages to report.

(I)

REASON:

A -

EQUIPMENT FAILURE (EXPLAIN)

B - MAINT. OR TEST C -

REFUELING D -

REGULATORY RESTRICTION E -

OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)

(2)

METHOD:

A -

MANUAL B -

MANUAL SCRAM C -

AUTOMATIC SCRAM 49 bg

0

ENCLOSURE A

Ginna Station, Unit jul September 5,

1975 COMPLETED BY Andrew E.

McNamara>

Operations Ai e Telephone ill-716-546-2700, Ext. 291-214 at Gonna DAILY PLANT POWER OUTPUT MONTH Au ust 1975 DAY 2

3 10 13 15 16 17 18 19 20 21 22 23 24 AVERAGE DAILY MlUe-net

'467.96 469 F 17 448.29 464.54 461.63 470.88 481. 75 477.92 472.83 469.38 466.83 465.71 467.42 468.54 470.46 472.83 471.67 470.17 469.88 469.42 470.13 472.96 471.04 404.5 DAY 25 26 27 28 29 30 31 AVERAGE DAILY M'lUe-net 470.33 469.71 467.25 468.79 470.33 473.41 481.25 49 87

I

. ~ l

) ~

~ J I ~

4

~

I

~

~

~

\\

~

.. UNIT NAhlE:

G St on Unit 81 DATE'eptember 5>

1975'OhlPLETED BY:

$.w Andrew E. McNamara> Operations Aide Telephone jul-716-546-2700>

Ext. 291-214 at Ginna QPERAT'ING STATUS 1.

REPORTING PERIOD:

00015 750801 TO 2400 750831 GROSS HOURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTHORIZED POlUER LEVEL MlUt Max. Depend.

Capacity (hllUe-Net) 3.

POWER LEVEL TO 'lUHICH RESTRICTED (IF ANY): (hHUe Net) 4.

REASONS FOR RESTRICTIONS (IF ANY):

THIS MOHTH CUMULATIVE YEAR TO DATE TO DATE 5.

NUhlBER OF HOURS THE REACTOR WAS CRITICALLY 6.

REACTOR RESERVE SHUTDOWN HOURS..........,.

744 4 004.54 0

291.22 38 323 00 291.22~"

7.

HOURS GENERATOR ON LINE.

8.

UNIT RESERVE SHUTDOWN HOURS 744 3 868 75 0

8 5 37 0 0 5>'c 9.

GROSS THERhlAL ENERGY GENERATED (hllYH)......

10.

GROSS ELECTRICAL ENERGY GENERATED (MlYH)...

11.

NET ELECTRICAL ENERGY GENERATED (MIYH).....

<ll 365~785 15782>122 46 114 61 15 388 940 12. REACTOR AVAILABILITYFACTOR (1).....

~.

~

13.

UNIT AVAILABII,TYFACTOR (2)............

14.

UNIT CAPACITY FACTOR (3)

~

~

15 'NIT F<ORCED OUTAGE RATE (4). ".

100%

99 5

68 F 7%

61 3'

73 75.3%

~65 2

1 6 ~

SHUTDO'lUNS SCHEDULED OVER NEXT 6

'h'IONTHS

( TYPE 2 DATE AND DURATION OF EACH )

  • Cumulative Data Commencing January 1>

1975

17. IF SHUT.

DOlYN AT END OF REPORT

PERIOD, ESTIhlATED DATE OF STARTUP:

18

~

UNITS IN TEST STATUS (PRIOR TO Cohti<IERCIAL OPERATION):

DATE FORECASTED DATE ACHIEVED INITIALCRITICALITY INITIAL ELECTRICAL POWER GENERATION COh1MERCIAL OPERATION

<<ii 00 (2)

UNIT AVAILABILITYFACTOR (4)

FORCED OUTAGE RATE

=

FORCED OUTAGE HOURS

<<<100 HOURS GENERATOR ON-LINE +'ORCED OUTAGE HOURS (1)

REACTOR AVAILABILITYFACTOR =

HOURS REACTOR WAS CRITICAL GROSS HOURS IN REPORTING PERIOD HOURS GENERATOR ON"LINE

<<<100 GROSS HOURS IVi REPORTING PERIOD (3)

UNIT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED

<<<100 CURRENTLY LICENSED POWER LEVEL<<2GROSS HRS.

IN REPORTING PERIOD 49-88

4.

0

)

l I

~

'I L

~

1

~

A 0

I I