ML18142B395

From kanterella
Jump to navigation Jump to search
R. E. Ginna - Forwards Operating Status Information for Month of August 1975
ML18142B395
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/05/1975
From: Platt C
Rochester Gas & Electric Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML18142B395 (10)


Text

s MO~Y REPORTS (FOR GRAY BOOK PREPA~ION)

~

~

M'TEMPORARY

/

U s

NRC DISTRIBUTION FOR PART 50 DOCKET. MATERIAL FORM)

~6 FI[ F MONTHLY REPORT FILE FROM Rochester Cas 8e Electri ee)I E OF DOC DATE R EC'D LTR , TWX RPT OTHER Rochester, N.Y..

Charles E. Plat% s TO: ORIG CC OTHER ssx 1 Signed. SENT LOCAL PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

gaby DESCRIPTION: ENCLOSURES Ltr trans the following: Monthly Report for Au st 1

.Plant & Component Operability & Availability This Report to be used in preparing Gray Book Plans & Operations.

NUMBER OF COPIES REC'D:

PLANT NAME RE Ginna p 1 FOR ACTION/INFORMATION SAB BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)

W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L) .Qo ~" XT W/ Copies W/ Copies W/ Copies w/ copies PT RgMp jg

'.'4 PARR (L) VASSALLO (L) KNIGHTON (E) SPELS W/ Copies W/ Copies W/ Copies W/ Copies P~yp.~

KNIEL (L) EMPURPLE (Ll YQUNGBLQDD (Ei~ s('(Pc/PE LNPt/(Tggnm W/ Copies W/ Copies W/ Copies Copies ~Gpss INTERNAL DISTRIBUTION Fl TECH REVIEW DENTON LIC ASST, A/T I ND ~

~NRC P R SCHROEDER G R IMES R. DIGGS (L) BRAITMAN OGC, ROOM P-506A. MACCARY GAMMILL H. GEARIN (L) SALTZMAN GOSSI CK/STAF F KNIG HT KASTNE R E. GOULBOURNE (L) ME LTZ CASE PAWLICKI BALLARD P. KR EUTZ E R (E)

G I AMBUSSO SHAO SPANGLER J. LEE (L) PLANS BOYD STELLO M. KUBH3ROOK (L) ~MCDONALD MOORE (L) HOUSTON ENVI RO S. REED (E) ~CHAPMAN DEYOUNG (L) NOVAK MULLER M. SERVICE (L) DUBE (Ltr)

SKOVHOLT (L) ROSS DICKER gS. SHEPPARD (L) E. COUPE GOLLER (L) (Ltr) IPPOLITO KNIG HTON M. SLATER (E) PETERSON P. COLLINS TEDESCO YOUNGBLOOD H. SMITH (L) HARTFIELD (2)

DENISE J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR LA NAS I PROJECT LDR G. WILLIAMS(E) EISENHUT FII.F. A REGION (2) BENAROYA V. WILSO~ (L) WIGG INTON VOLLMER HAR LESS R. INGRAM (L)

STEE LE M DUN A EXTERNAL DISTRIBUTION LOCAL PDp@~ons~iti.Rochester N.Y.

~1 TIC (ABERNATHY) (1)(2)(10) NATIONALLABS 1 PD R-SAN/LA/NY W. PENNINGTON, Rm E-201 GT BROOKHAVEN NAT LAB

~1 NSI C (BUCHANAN) 1 CONSULTANTS 1

G. ULRIKSON, ORNL 1 ASLB 1 1 1 NewtonI anderson NEWMARK/8LUME/AGBABIAN 1 AGMED (RUTH GUSSMAN)

ACRS I,GLDING/SENT Rm 8-127 GT 1 J. D. RUNKLES, Rm E-201 GT

H I R t'

N

n/,

mazuma lRD szzsztz i gt~egu atoJff .Pjte CfJ."

~l~.i'V",";;l'OCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE AREA COOE Tld 546-2700 Ginna Station September 5> 1975 Office of Plans and Schedules Directorate of Licensing j (Q H$

I,=-'-"'py'@~

o U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Af Q~~

Monthly Report for August> 1975

~

Subject:

Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:

Pursuant to the letter dated February 19, 1974 of Mr. L. Manning Muntzing, Director of Regulation, enclosed herewith is the requested operating status information of the Ginna Station for the month of August.

Very truly yours>

Charles E. Platt Superintendent CEP:fah Enclosures (3) cc: Mr. James P, O'Reilly

l

~ ~

~ ~ f i

(

~ t

SUMMARY

Reactor power level averaged 99.3% in UNIT NAME Ginna Station, Unit gl reporting period, with the following significan exceptions: Power level reduction to 56% to Se tember 5 1975 maintain transmission line capabilities> on 8/3/75. Power level reduction to 47% to per- COMPLETED BY form T-18B> Turbine Main Steam Stop Valves Andrew E. McNamara, Operations Aide Test> on 8/24/75 Telephone fkl-716-546-2700> Ext. 291-214 at Ginna August> 1975 REPORT MONTH PLANT SHUTDONNS TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN COMMENTS DATE S-SCHEDULED (HOURS) REASON (1) THE REACTOR (2)

No outages to report.

(I) REASON: (2) METHOD:

A - EQUIPMENT FAILURE (EXPLAIN) A - MANUAL B - MAINT. OR TEST B - MANUAL SCRAM C - REFUELING C - AUTOMATIC SCRAM D - REGULATORY RESTRICTION E - OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN) 49 bg

0 ENCLOSURE A Ginna Station, Unit jul September 5, 1975 COMPLETED BY Andrew E. McNamara> Operations Ai e Telephone ill-716-546-2700, Ext. 291-214 at Gonna DAILY PLANT POWER OUTPUT MONTH Au ust 1975 DAY AVERAGE DAILY MlUe-net DAY AVERAGE DAILY M'lUe-net

'467.96 25 470.33 2 469 F 17 26 469.71 3 448.29 27 467.25 464.54 28 468.79 461.63 29 470.33 470.88 30 473.41 481. 75 31 481.25 477.92 472.83 469.38 10 466.83 465.71 467.42 13 468.54 15 470.46 16 472.83 17 471.67 18 470.17 19 469.88 20 469.42 21 470.13 22 472.96 23 471.04 24 404.5 49 87

I

. ~ l

) ~

~ J I ~

4

~ I

~ ~

. ~

\ ~

.. UNIT NAhlE: G St on Unit 81 DATE'eptember 5>

BY:

Andrew E. McNamara>

Operations Aide

.w 1975'OhlPLETED Telephone jul-716-546-2700> Ext. 291-214 at Ginna QPERAT'ING STATUS

1. REPORTING PERIOD: 00015 750801 TO 2400 750831 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POlUER LEVEL MlUt Max. Depend. Capacity (hllUe-Net)
3. POWER LEVEL TO 'lUHICH RESTRICTED (IF ANY): (hHUe Net)
4. REASONS FOR RESTRICTIONS (IF ANY):

THIS CUMULATIVE MOHTH YEAR TO DATE TO DATE

5. NUhlBER OF HOURS THE REACTOR WAS CRITICALLY 744 4 004.54 38 323 00
6. REACTOR RESERVE SHUTDOWN HOURS..........,. 0 291.22 291.22~"
7. HOURS GENERATOR ON LINE. 744 3 868 75 37 0 0
8. UNIT RESERVE SHUTDOWN HOURS 0 8 5 5>'c
9. GROSS THERhlAL ENERGY GENERATED (hllYH)...... <ll 46 114 61
10. GROSS ELECTRICAL ENERGY GENERATED (MlYH)... 365~785 15782>122 15 388 940
11. NET ELECTRICAL ENERGY GENERATED (MIYH).....

12 . REACTOR AVAILABILITYFACTOR (1)..... ~ . ~

100% 68 F 7% 75.3%

13. UNIT AVAILABII,TYFACTOR (2)............
14. UNIT CAPACITY FACTOR (3) ~ ~ 99 5 61 3' ~65 2 15 'NIT F<ORCED OUTAGE RATE (4). ". 73 16 ~ SHUTDO'lUNS SCHEDULED OVER NEXT 6 'h'IONTHS > ( TYPE 2 DATE AND DURATION OF EACH )
  • Cumulative Data Commencing January 1> 1975
17. IF SHUT. DOlYN AT END OF REPORT PERIOD, ESTIhlATED DATE OF STARTUP:

18 ~ UNITS IN TEST STATUS (PRIOR TO Cohti<IERCIAL OPERATION):

DATE FORECASTED DATE ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COh1MERCIAL OPERATION (1) REACTOR AVAILABILITYFACTOR = HOURS REACTOR WAS CRITICAL <<ii 00 GROSS HOURS IN REPORTING PERIOD (2) UNIT AVAILABILITYFACTOR HOURS GENERATOR ON"LINE <<<100 GROSS HOURS IVi REPORTING PERIOD (3) UNIT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED <<<100 CURRENTLY LICENSED POWER LEVEL<<2GROSS HRS. IN REPORTING PERIOD (4) FORCED OUTAGE RATE = FORCED OUTAGE HOURS <<<100 HOURS GENERATOR ON-LINE +'ORCED OUTAGE HOURS 49-88

4. )

0 l

I ~

'I L

~ 1

~ A 0 I I