ML23258A138

From kanterella
Jump to navigation Jump to search
Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010
ML23258A138
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/18/2023
From: Mel Gray
NRC/RGN-I/DORS
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023010
Download: ML23258A138 (1)


See also: IR 05000244/2023010

Text

September 18, 2023

David P. Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: R.E. GINNA NUCLEAR POWER PLANT - REQUEST FOR INFORMATION

AND NOTIFICATION OF CONDUCT OF IP 71111.21.N.04, AGE -RELATED

DEGRADATION, REFERENCE INSPECTION REPORT 05000244/2023010

Dear David Rhoades:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct IP 71111.21N.04, Age-Related Degradation baseline inspection at the R.E.

Ginna Nuclear Power Station in November 2023. Paul Cataldo, a Senior Reactor Inspector from

the NRCs Region I office, will lead the inspection team. The team will be composed of

personnel from the NRC Region I Office. The inspection will be conducted in accordance with IP 71111.21N.04 (ADAMS Accession No. ML22210A107). The inspection will evaluate the

implementation of the programs and activities to determine on a sampling basis that age- related

degradation of structures and components (SCs) is identified and addressed.

The schedule for the inspection is as follows:

  • Information gathering visit: Week of October 9, 2023
  • Onsite inspection: Weeks of November 13 and November 27, 2023

The purpose of the information gathering visit is to become familiar with the station

maintenance, surveillance, testing, inspection, and condition monitoring programs, become

familiar with plant layout, support identification of SCs that will be reviewed during the

inspection, and, as necessary, obtain plant specific site access training and badging for

unescorted site access. An initial list of documents that the team will review during the

information gathering visit are listed in the attached Enclosures .

During the information gathering visit, the team leader will also discuss the following inspection

support administrative details: office space size and location; specific documents requested to

be made available to the team in their office spaces; arrangements for reactor site access and

the availability of knowledgeable plant staff and licensing organization personnel to serve as

points of contact during the inspection.

D. Rhoades 2

For SCs that the inspection will review, an initial list of the documents the team will review

during the conduct of the inspection are also listed in the Enclosure. The team leader will

contact you with identified S Cs by October 30, 2023. Also, personnel should be available at the

site during the inspection who are knowledgeable regarding maintenance, surveillance, testing,

inspection, and condition monitoring programs.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, under Control Number

3150- 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 Code of Federal Regulations (CFR) 2.390 of the NRC rules and

practices, a copy of this letter and its enclosures will be available electronically for public

inspection in the NRC public document room or from the publicly available records component

of NRCs document system (ADAMS). ADAMS is accessible from the NRC website

(http://www.nrc.gov/reading- rm/adams.html).

This baseline inspection and the supporting inspection procedure and documentation template

are new to the Reactor Oversight Process this year. As such, please communicate with the

team lead readily if there are questions as to document scope or suggestions to better

accomplish this process.

Sincerely,

Mel Gray, Chief

Engineering Branch 1

Division of Operating Reactor Safety

Docket No. 05000244

License No. DPR-18

Enclosure:

1. Documents requested for Information

Gathering Visit

2. Documents requested for Inspection

cc w/ encl: Distribution via LISTSERV

D. Rhoades 3

SUBJECT: R.E. GINNA NUCLEAR POWER PLANT - REQUEST FOR INFORMATION

AND NOTIFICATION OF CONDUCT OF IP 71111.21.N.04, AGE -RELATED

DEGRADATION, REFERENCE INSPECTION REPORT 05000244/2023010

DATED SEPTEMBER 18, 2023

DISTRIBUTION:

PCataldo, DORS

MGray, DORS

ECarfang, DORS

MHardgrove, DORS

TWinkel, DORS

JSchussler, DORS, SRI

CSwisher, DORS, RI

ACass, DORS, AA

JJosey, RI OEDO

RidsNrrPMREGinna Resource

RidsNrrDorlLpl1 Resource

DOCUMENT NAME: https://usnrc.sharepoint.com/teams/Region-I-

EB1/Documents/Inspections/Current/Ginna ARD/Ginna 2023 ARD Information Request

Letter.docx

ADAMS ACCESSION NUMBER: ML23258A138

x Non-Sensitive x Publvlle

SUNSI Review

x Sensitive n -Publiclyvlable

OFFICE / /

NA PC ray

D E 14/2023 14/2023

OFFIAL RERD COP

Enclosure 1: Documents Requested for Information Gathering Visit

The following information is requested by October 10, 2023, which is during the information

gathering trip. Electronic format is the preferred media. If electronic media is made available via

an internet based remote document management system, then the remote document access

must allow inspectors to download, save, and print the documents in the NRC's regional office.

Electronic media on compact disc or paper records (hard copy) are acceptable. At the end of

the inspection, the documents in the team's possession will not be retained.

This document request is based on typical documents that a generic plant might have. As such,

this document request is not meant to imply that your plant is required to have all of the listed

documents. In addition, your plant specific document titles may vary from the document titles

listed below.

Contact Information:

Team Lead: Paul Cataldo

Email: paul.cataldo@nrc.gov

Telephone: (603) 395-5536

Documents Requested:

1) A list of 50.65 (a)(1) SSCs from the past 5 years.

2) A list of maintenance rule functional failures from the past 5 years.

3) A list of the most recent system health/maintenance rule status for High Safety

Significance (HSS) and Low Safety Significance (LSS) systems, as defined in the Ginna

maintenance rule procedures/process.

4) The most recent site component obsolescence list, and associated Plant Health

Committee (PHC) package that introduced the list for the semi-annual review, and any

applicable guidance documents regarding the control of, and additions to, this list.

5) The most recent evaluation of maintenance effectiveness required per 10 CFR

50.65(a)(3).

6) The maintenance rule scoping document SSCs and performance criteria.

7) List of corrective action documents associated with component failures, applicable

corrective action program trend codes , or keyword search of aging, age- related,

wear, accelerated wear, corrosion, abnormal wear, accelerated degradation, and

abnormal degradation from the past 5 years. Please include a short description of the

issue in the system generated listing.

8) A list of Part 21 Reports applicable to the site from the past 5 years.

9) A list of top 100 most risk-significant structures and components. If possible, designate

the component as active or passive in the risk ranking.

Enclosure 1

Enclosure 1: Documents Requested for Information Gathering Visit

10) The site- specific probabilistic risk assessment (PRA) identifying risk-significant functions

and SSCs, and if possible, the re-baselined PRA Summary Document from 2023.

11) Scoping and basis document for 10 CFR 50.49, Environmental Qualification.

12) Aging management programs and basis documents.

13) Technical requirements manual.

14) List of systems (system numbers / designators and corresponding names).

15) List of PM deferrals and PM change requests in the last 5 years.

Enclosure 2: Documents Requested for Inspection

The following information will be requested to be available by October 30, 2023. The team lead

will identify specific samples (i.e., SCs ) after the information gathering visit. This information

represents a partial list of needed information for the onsite team inspection. The information

should be separated for each selected SC .

Documents Requested:

1) List of corrective action documents associated with each selected SC for the last 5

years.

2) Maintenance, surveillance, testing, inspection, and condition monitoring testing

requirements, acceptance criteria, and periodicities for the selected SC samples.

3) The bases documents associated with maintenance, surveillance, testing, inspection,

condition monitoring testing requirements, acceptance criteria, and periodicities.

4) The last two years of maintenance, surveillance, testing, inspection, and condition

monitoring testing results for the selected SC samples. For periodicities greater than two

years, provide the last two test results.

5) Self-imposed and vendor recommendations.

6) A list of technical specification operability determinations associated with applicable SCs

from the past 5 years as defined in Ginna implementing procedures.

Enclosure 2