December 2004 Monthly Operating Report for the R.E. Ginna Nuclear Power Plant
ML050190201
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/07/2005
From: Marlow T
Constellation Generation Group
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML050190201 (2)


Text

-

Thomas A. Marlow R.E. Ginna Nuclear Power Plant, LLC Plant General Manager 1503 Lake Road Ontario, New York 14519-9364 585.771.3000 Constellation Energy Generation Group January 7, 2005 US Nuclear Regulatory Commission Document Control Desk Attn:

Robert Clark Project Directorate 1-1 Washington, DC 20555

Subject:

Monthly Report for December 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of December 2004.

Very truly yours A1St q'0 Thomas A. Marlow Plant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop 0-8-C2)

Project Directorate l-1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

^

k OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-244 Ginna I January 06, 2005 John V. Walden 585-771 -3588 REPORTING PERIOD:

December 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 470.00 480.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 370,379.00 Yr-to-Date 8,738.58 8,733.53 0.00 4,308,488.80 Cumulative 255,736.80 252,519.23 8.50 115,505,989.8

'IC UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date s: Scheduled (Hours)

Reason I Down 2 Comments

SUMMARY

The unit operated at full power for the entire month of December. Average power for the month was 99.7%.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F Administration G Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

Page 1 of 1