ML032270418

From kanterella
Jump to navigation Jump to search
July 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant
ML032270418
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/07/2003
From: Widay J
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML032270418 (3)


Text

R z5 An Energy East Company ROCHES1ER GWSAND ELECRIC CORPCOAT10N

  • 89 EASTAVENME, ROCHESTEP, N.Y 14649-0001 585 546-2700 wwwrex.com August 7, 2003 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate l-1 Washington, DC 20555

Subject:

Monthly Report for July 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of July 2003.

Very truly yours,

- (ph A. Wida Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT 50-244 August 7, 2003 I COMPLETED BY: t, I ,IA John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: July, 2003
3. Design Electric Rating (Net MWe): 470
4. Maximum Dependable Capacity (Net MWe): 480 This Month Yr.-to-Date Cumulative*
5. Number of hours Reactor Was Critical - 744.0 5087.0 244103.9
6. Hours Generator On-line X744.0 5076.1 240935.2
7. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
8. Net Electrical Energy Generated (MWH) 361547.0 2505083.4 109833992.4
  • CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: August 7. 2003 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD: July 2003 (Month/Year)

NO. DATE TYPE DURATION REASON(') METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING l____ S: SCHEDULED  : DOWN(2) COMMENTS

SUMMARY

The unit operated at full power for the entire of the month of July. Average power for the month of July was 99.6%.

(1) Reason (2) Method A - Equipment Failure (Explain) 1- Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator TralninglUcense Examination 5 -Other (Explain)

F - Administrative G- Operational Error (Explain)

H - Other (Explain)