R z5 An Energy East Company ROCHES1ER GWSAND ELECRIC CORPCOAT10N

  • 89 EASTAVENME, ROCHESTEP, N.Y 14649-0001 585 546-2700 wwwrex.com August 7, 2003 US Nuclear Regulatory Commission Document Control Desk Attn:

Robert Clark Project Directorate l-1 Washington, DC 20555

Subject:

Monthly Report for July 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of July 2003.

Very truly yours,

( ph A. Wida Plant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT 50-244 August 7, 2003 I COMPLETED BY:

t, I,IA John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS 1.

2.

3.

4.

Unit Name:

R.E. GINNA NUCLEAR POWER PLANT Reporting Period:

July, 2003 Design Electric Rating (Net MWe):

470 Maximum Dependable Capacity (Net MWe):

480 Notes:

This Month Yr.-to-Date Cumulative*

5.

6.

7.

8.

Number of hours Reactor Was Critical Hours Generator On-line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

- 744.0 X 744.0 0.0 361547.0 5087.0 5076.1 0.0 2505083.4 244103.9 240935.2 8.5

  • 109833992.4
  • CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: August 7. 2003 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:

July 2003 (Month/Year)

NO.

DATE TYPE DURATION REASON(')

METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)

SHUTTING l____

S: SCHEDULED DOWN(2)

COMMENTS

SUMMARY

The unit operated at full power for the entire of the month of July. Average power for the month of July was 99.6%.

(1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator TralninglUcense Examination F - Administrative G-Operational Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 -Other (Explain)