Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006)
ML24053A357
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/28/2024
From: Erin Carfang
NRC/RGN-I/DORS
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023006
Download: ML24053A357 (1)


Text

February 28, 20 24

David Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)

Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: ANNUAL ASSESSMENT LETTER FOR R.E. GINNA NUCLEAR POWER PLANT, LLC (REPORT 05000244/2023 006)

Dear David Rhoades:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of R.E. Ginna Nuclear Power Plant, LLC (Ginna), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023 through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Ginna during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Ginna.

The enclosed inspection plan lists the inspections scheduled through December 31, 2025.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5120 with any questions you have regarding this letter.

Sincerely, Erin E. Carfang, Chief Projects Branch 1 Division of Operating Reactor Safety

Docket No. 05000244 License No. DPR-18

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV SUBJECT: ANNUAL ASSESSMENT LETTER FOR R.E. GINNA NUCLEAR POWER PLANT, LLC (REPORT 05000244/2023 006) DATED FEBRUARY 28, 2024

DISTRIBUTION:

ECarfang, DORS EEve, DORS MHardgrove, DORS KSmetana, DORS JSchussler, DORS, SRI CSwisher, DORS RI ACass, DORS, AA FGaskins, RI OEDO RidsNrrPMREGinna Resource RidsNrrDorlLpl1 Resource RLorson, RA BWelling, DORS RMckinley DORS PKrohn, DRSS JZimmerman, DRSS DRSS Reactor Branch Chiefs DORS Specialist Branch Chiefs DTifft, SLO DScrenci, PAO NSheehan, PAO RidsNrrDroIrib Resource ROPAssessment Resource

DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP-24 EOC Review/Branch 1/Ginna/Ginna 2023 Annual Assessment Letter.docx ADAMS ACCESSION NUMBER: ML24053A357 x SUNSI Review x Non-Sensitive x Publicly Available Sensitive n -Publiclyvlable

OFFICE / /

ME EEve ECfang TE 22/2024 22/2024

OFFIAL RERD COPY

Site Inspection Activity Plan 07200067 - Ginna (ISFSI)

01/01/2024 - 12/31/2025

Unit Start End Activity CAC Title Staff Count

Part 72 - ISFSI Operational Inspection (60855) - Ginna 3

4/22/2024 4/26/2024 IP 60855 001001 Operation Of An ISFSI

Prepared on 1/31/2024 3:36:32 PM 1 of 3 Site Inspection Activity Plan Ginna

01/01/2024 - 12/31/2025

Unit Start End Activity CAC Title Staff Count

Fire Protection - Ginna 3

1 3/4/2024 3/8/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1 3/18/2024 3/22/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

71124.08 (RadWaste) 1

1 3/11/2024 3/15/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

ISFSI Loading Campaign Inspection (60855) - Ginna 2

1 4/22/2024 4/26/2024 IP 60855 001001 Operation Of An ISFSI

PI&R Biennial Team Inspection - Ginna 4

1 7/15/2024 7/19/2024 IP 71152B 000747 Problem Identification and Resolution

1 7/29/2024 8/2/2024 IP 71152B 000747 Problem Identification and Resolution

FY24 Ginna Initial Licensing Exam 3

1 6/24/2024 6/28/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 7/21/2024 7/27/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

EP Exercise Inspection - Ginna 5

1 8/19/2024 8/23/2024 IP 71114.01 000716 Exercise Evaluation

1 8/19/2024 8/23/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1 8/19/2024 8/23/2024 IP 71151 001397 Performance Indicator Verification

Inservice Inspection - Ginna 1

1 9/30/2024 10/11/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

71124.01 (Rad Hazard) 1

1 10/7/2024 10/11/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

Access Control, Equipment Testing and Maintenance, Training, SPR 3

1 10/28/2024 11/1/2024 IP 71130.02 000734 Access Control

1 10/28/2024 11/1/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1 10/28/2024 11/1/2024 IP 71130.07 000739 Security Training

1 10/28/2024 11/1/2024 IP 71130.09 001656 Security Plan Changes

1 10/28/2024 11/1/2024 IP 71151 001338 Performance Indicator Verification

71124.03 & 71124.04 (Airborne & Occupational Dose) & 71151 (PIV) 1

1 11/4/2024 11/8/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1 11/4/2024 11/8/2024 IP 71124.04 000728 Occupational Dose Assessment

Cyber Security - Ginna 4

1 11/4/2024 11/8/2024 IP 71130.10 000741 Cybersecurity

Prepared on 1/31/2024 3:36:32 PM 2 of 3 Site Inspection Activity Plan

Ginna Requal Insp with P/F Results 1

1 11/10/2024 11/15/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance 1 11/11/2024 11/15/2024 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance

Access Control, AA, FFD, Sec Plan Review, PI - Ginna 3

1 2/10/2025 2/14/2025 IP 71130.01 000733 Access Authorization

1 2/10/2025 2/14/2025 IP 71130.08 000740 Fitness-For-Duty Program

1 4/7/2025 4/11/2025 IP 71130.01 000733 Access Authorization

1 4/7/2025 4/11/2025 IP 71130.02 000734 Access Control

1 4/7/2025 4/11/2025 IP 71130.08 000740 Fitness-For-Duty Program

1 4/7/2025 4/11/2025 IP 71130.09 001656 Security Plan Changes

1 4/7/2025 4/11/2025 IP 71151 001338 Performance Indicator Verification

RP 71124.01 Rad Hazards 1

1 3/10/2025 3/14/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

EP Program Inspection - Ginna 2

1 4/7/2025 4/11/2025 IP 71114.02 000717 Alert and Notification System Testing

1 4/7/2025 4/11/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1 4/7/2025 4/11/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1 4/7/2025 4/11/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness

1 4/7/2025 4/11/2025 IP 71151 001397 Performance Indicator Verification

RP 71124.07 REMP 1

1 7/28/2025 8/1/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program

RP 71124.06 RETS 1

1 10/6/2025 10/10/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

2025 Ginna Initial Operator Licensing Exam 4

1 9/29/2025 10/3/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 11/3/2025 11/7/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Commercial Grade Dedication - Ginna 3

1 11/3/2025 11/7/2025 IP 71111.21N.03 001808 Commercial Grade Dedication

1 11/17/2025 11/21/2025 IP 71111.21N.03 001808 Commercial Grade Dedication

Prepared on 1/31/2024 3:36:32 PM 3 of 3