Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] Category:Operating Plan
MONTHYEARIR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) ML13066A1722013-02-28028 February 2013 R. E. Ginna, Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation ML0222104412002-07-30030 July 2002 R. E. Ginna Nuclear Power Plant Application for Renewed Operating License, Volume 1, Section 2.0, Pages 2-155 - 2-372 2024-02-28
[Table view] Category:Status Report
MONTHYEARIR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) RS-17-045, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2017-03-30030 March 2017 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-16-046, Annual Property Insurance Status Report2017-03-29029 March 2017 Annual Property Insurance Status Report RS-16-094, Property Insurance Status Report for Braidwood Station, Byron Station, Calvert Cliffs, Clinton Power, Dresden Nuclear, LaSalle County, Limerick Generating, Nine Mile Point, Oyster Creek, Peach Bottom, Quad Cities, R.E Ginna, Three Mile Isl2016-04-25025 April 2016 Property Insurance Status Report for Braidwood Station, Byron Station, Calvert Cliffs, Clinton Power, Dresden Nuclear, LaSalle County, Limerick Generating, Nine Mile Point, Oyster Creek, Peach Bottom, Quad Cities, R.E Ginna, Three Mile Isla RS-16-006, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-01-0404 January 2016 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RS-15-296, Submits Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-12-15015 December 2015 Submits Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) RS-15-218, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RS-15-206, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) RS-15-062, R. E. Ginna - February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)2015-02-20020 February 2015 R. E. Ginna - February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) RS-15-061, February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)2015-02-20020 February 2015 February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) L-14-029, August 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-08-26026 August 2014 August 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML14069A3182014-02-27027 February 2014 February 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML14069A1802014-02-24024 February 2014 February 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13098A0842013-03-27027 March 2013 Decommissioning Funding Status Report ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML0908504002009-03-26026 March 2009 Units, 1 & 2, Nine Mile Point, Units, 1 & 2, and R.E. Ginna, 2009 Decommissioning Funding Status Report: Year End 2008 ML0710802622007-03-30030 March 2007 Biennial Report: Status of Decommissioning Funding Per 10 CFR 50.75(f)(1) ML0509400242005-03-29029 March 2005 Plants 2005 Report on Status of Decommissioning Funding ML0226002922002-09-17017 September 2002 Memorandum Regarding Report on the Status of Open TIAs Assigned to NRR ML0224007982002-02-0101 February 2002 E-mail from Beth Wetzel Bulletin 2001-01 Status Report ML0224007812002-01-18018 January 2002 E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report 2024-02-28
[Table view] |
Inspection Report - Ginna - 2023006 |
---|
|
|
Text
February 28, 20 24
David Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)
Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT: ANNUAL ASSESSMENT LETTER FOR R.E. GINNA NUCLEAR POWER PLANT, LLC (REPORT 05000244/2023 006)
Dear David Rhoades:
The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of R.E. Ginna Nuclear Power Plant, LLC (Ginna), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023 through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at Ginna during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Ginna.
The enclosed inspection plan lists the inspections scheduled through December 31, 2025.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5120 with any questions you have regarding this letter.
Sincerely, Erin E. Carfang, Chief Projects Branch 1 Division of Operating Reactor Safety
Docket No. 05000244 License No. DPR-18
Enclosure:
As stated
cc w/ encl: Distribution via LISTSERV SUBJECT: ANNUAL ASSESSMENT LETTER FOR R.E. GINNA NUCLEAR POWER PLANT, LLC (REPORT 05000244/2023 006) DATED FEBRUARY 28, 2024
DISTRIBUTION:
ECarfang, DORS EEve, DORS MHardgrove, DORS KSmetana, DORS JSchussler, DORS, SRI CSwisher, DORS RI ACass, DORS, AA FGaskins, RI OEDO RidsNrrPMREGinna Resource RidsNrrDorlLpl1 Resource RLorson, RA BWelling, DORS RMckinley DORS PKrohn, DRSS JZimmerman, DRSS DRSS Reactor Branch Chiefs DORS Specialist Branch Chiefs DTifft, SLO DScrenci, PAO NSheehan, PAO RidsNrrDroIrib Resource ROPAssessment Resource
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP-24 EOC Review/Branch 1/Ginna/Ginna 2023 Annual Assessment Letter.docx ADAMS ACCESSION NUMBER: ML24053A357 x SUNSI Review x Non-Sensitive x Publicly Available Sensitive n -Publiclyvlable
OFFICE / /
ME EEve ECfang TE 22/2024 22/2024
OFFIAL RERD COPY
Site Inspection Activity Plan 07200067 - Ginna (ISFSI)
01/01/2024 - 12/31/2025
Unit Start End Activity CAC Title Staff Count
Part 72 - ISFSI Operational Inspection (60855) - Ginna 3
4/22/2024 4/26/2024 IP 60855 001001 Operation Of An ISFSI
Prepared on 1/31/2024 3:36:32 PM 1 of 3 Site Inspection Activity Plan Ginna
01/01/2024 - 12/31/2025
Unit Start End Activity CAC Title Staff Count
Fire Protection - Ginna 3
1 3/4/2024 3/8/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1 3/18/2024 3/22/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
71124.08 (RadWaste) 1
1 3/11/2024 3/15/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation
ISFSI Loading Campaign Inspection (60855) - Ginna 2
1 4/22/2024 4/26/2024 IP 60855 001001 Operation Of An ISFSI
PI&R Biennial Team Inspection - Ginna 4
1 7/15/2024 7/19/2024 IP 71152B 000747 Problem Identification and Resolution
1 7/29/2024 8/2/2024 IP 71152B 000747 Problem Identification and Resolution
FY24 Ginna Initial Licensing Exam 3
1 6/24/2024 6/28/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1 7/21/2024 7/27/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
EP Exercise Inspection - Ginna 5
1 8/19/2024 8/23/2024 IP 71114.01 000716 Exercise Evaluation
1 8/19/2024 8/23/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1 8/19/2024 8/23/2024 IP 71151 001397 Performance Indicator Verification
Inservice Inspection - Ginna 1
1 9/30/2024 10/11/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
71124.01 (Rad Hazard) 1
1 10/7/2024 10/11/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
Access Control, Equipment Testing and Maintenance, Training, SPR 3
1 10/28/2024 11/1/2024 IP 71130.02 000734 Access Control
1 10/28/2024 11/1/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
1 10/28/2024 11/1/2024 IP 71130.07 000739 Security Training
1 10/28/2024 11/1/2024 IP 71130.09 001656 Security Plan Changes
1 10/28/2024 11/1/2024 IP 71151 001338 Performance Indicator Verification
71124.03 & 71124.04 (Airborne & Occupational Dose) & 71151 (PIV) 1
1 11/4/2024 11/8/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
1 11/4/2024 11/8/2024 IP 71124.04 000728 Occupational Dose Assessment
Cyber Security - Ginna 4
1 11/4/2024 11/8/2024 IP 71130.10 000741 Cybersecurity
Prepared on 1/31/2024 3:36:32 PM 2 of 3 Site Inspection Activity Plan
Ginna Requal Insp with P/F Results 1
1 11/10/2024 11/15/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance 1 11/11/2024 11/15/2024 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance
Access Control, AA, FFD, Sec Plan Review, PI - Ginna 3
1 2/10/2025 2/14/2025 IP 71130.01 000733 Access Authorization
1 2/10/2025 2/14/2025 IP 71130.08 000740 Fitness-For-Duty Program
1 4/7/2025 4/11/2025 IP 71130.01 000733 Access Authorization
1 4/7/2025 4/11/2025 IP 71130.02 000734 Access Control
1 4/7/2025 4/11/2025 IP 71130.08 000740 Fitness-For-Duty Program
1 4/7/2025 4/11/2025 IP 71130.09 001656 Security Plan Changes
1 4/7/2025 4/11/2025 IP 71151 001338 Performance Indicator Verification
RP 71124.01 Rad Hazards 1
1 3/10/2025 3/14/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
EP Program Inspection - Ginna 2
1 4/7/2025 4/11/2025 IP 71114.02 000717 Alert and Notification System Testing
1 4/7/2025 4/11/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
1 4/7/2025 4/11/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1 4/7/2025 4/11/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness
1 4/7/2025 4/11/2025 IP 71151 001397 Performance Indicator Verification
RP 71124.07 REMP 1
1 7/28/2025 8/1/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program
RP 71124.06 RETS 1
1 10/6/2025 10/10/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment
2025 Ginna Initial Operator Licensing Exam 4
1 9/29/2025 10/3/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1 11/3/2025 11/7/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Commercial Grade Dedication - Ginna 3
1 11/3/2025 11/7/2025 IP 71111.21N.03 001808 Commercial Grade Dedication
1 11/17/2025 11/21/2025 IP 71111.21N.03 001808 Commercial Grade Dedication
Prepared on 1/31/2024 3:36:32 PM 3 of 3