An Energy East Company ROCHESTER GAS AND ELECTRIC CORPORATION 89 EASTAVENUE, ROCHESTER, N.Y 14649-0001
- 585 546-2700 www.rge.com May 9, 2003 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate 1-1 Washington, DC 20555
Subject:
Monthly Report for April 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of April 2003.
Very truly yours, J seph A. Widay Plant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT 50-244 May 10, 2003 COMPLETED BY:
1$0& _
John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS
- 1. Unit Name:
R.E. GINNA NUCLEAR
- 2. Reporting Period:
April, 2003
- 3. Design Electric Rating (Net MWe):
- 4. Maximum Dependable Capacity (Net MWe):
POWER PLANT 470 480 This Month
- Yr.-to-Date Cumulative**
- 5. Number of hours Reactor Was Critical
- 6. Hours Generator On-line
- 7. Unit Reserve Shutdown Hours
- 8. Net Electrical Energy Generated (MWH) 719.0 719.0 0.0 357063.0 2879.0 2868.1 0.0 1417761.4 241895.9 238727.2 8.5
- 108746670.4 N
- CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969 Notes:
r
DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: May 9, 2003 COMPLETED BY: John V. Walden
-- TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:
April 2003 (MonthNear)
SUMMARY
- The unit operated at full power for the entire of the month of April. Average power for the month of April was 99.7%.
(1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F-Administrative G - Operational Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 -Other (Explain)
NO.
DATE TYPE DURATION REASON(')
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTTING S: SCHEDULED DOWN 2)
COMMENTS