ROCHESTER GAS AND ELECTRIC CORPORATION - 89 EAST AVENUE, ROCHESTER, N. Y. 14649-0007 AREA CODE 776 546-2700 June 10, 2002 US Nuclear Regulatory Commission Document Control Desk Attn:

Robert Clark Project Directorate I-1 Washington, DC 20555

Subject:

Revision to the Monthly Report for May, 2002 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of May, 2002.

Very truly yours, s

h A. Widay C ant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT 50-244 June 10, 2002 COMPLETED BY:

ý&

r um_

,/John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS

1.
2.
3.

4.

Unit Name:

R.E. GINNA NUCLEAR POWER PLANT Reporting Period:

May, 2002 Design Electric Rating (Net MWe):

470 Maximum Dependable Capacity (Net MWe):

480 Notes:

Number of hours Reactor Was Critical Hours Generator On-line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 744.0 744.0 0.0 368744.0 Yr.-to-Date 2857.7 2816.0 0.0 1330455.2 Cumulative**

233879.9 228650.1 8.5 104816016.0

    • CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969
5.
6.
7.

8.

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: June 10, 2002 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:

May, 2002 (Month/Year)

SUMMARY

The unit operated at full power for the entire month of May. Average power for the month of May was 99.8%.

(2) Method (1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain) 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

NO.

DATE TYPE DURATION REASON11 )

METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)

SHUTTING S: SCHEDULED DOWN(2)

COMMENTS