ML021090443

From kanterella
Jump to navigation Jump to search
March 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant
ML021090443
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/10/2002
From: Widay J
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML021090443 (3)


Text

ROCHESTER GAS AND ELECTRIC CORPORATION a 89 EAST AVENUE, ROCHESTER, N. Y 14649-00017 AREA CODE 716 546-2700 April 10, 2002 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for March, 2002 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant toGinna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of March, 2002.

Very truly yours, sh A. Widayt lant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT 50-244 April 10, 2002 COMPLETED BY:

('John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: March, 2002
3. Design Electric Rating (Net MWe): 470
4. Maximum Dependable Capacity (Net MWe): 480 This Month Yr.-to-Date Cumulative**
5. Number of hours Reactor Was Critical 413.1 1810.8 232833.0
6. Hours Generator On-line 412.9 1794.1 228319.0
7. Unit Reserve Shutdown Hours 0.0 0.0 8.5
8. Net Electrical Energy Generated (MWH) 168701.0 848296.1 104333856.9
    • CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: April 10, 2002 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD: March, 2002 (Month/Year)

NO. DATE TYPE DURATION REASON(1 ) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING 5: SCHEDULED DOWN(2 ) COMMENTS 2 020318 S 331.1 C 1 Refueling Shutdown to load Fuel Cycle 30

SUMMARY

End of Fuel Cycle 29 coastdown began on February 23, 2002 and continued until March 18, 2002. Power reduction for refueling shutdown began at 0000 on March 18, 2002. The unit was brought off-line at 0456 on March 18, 2002. The shutdown continued through the end of March, 2002.

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)