ML021090443
| ML021090443 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 04/10/2002 |
| From: | Widay J Rochester Gas & Electric Corp |
| To: | Clark R Document Control Desk, NRC/NRR/DLPM/LPD1 |
| References | |
| Download: ML021090443 (3) | |
Text
ROCHESTER GAS AND ELECTRIC CORPORATION a 89 EAST AVENUE, ROCHESTER, N. Y 14649-0001 7 AREA CODE 716 546-2700 April 10, 2002 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate I-1 Washington, DC 20555
Subject:
Monthly Report for March, 2002 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant toGinna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of March, 2002.
Very truly yours, sh A. Widayt lant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT 50-244 April 10, 2002 COMPLETED BY:
('John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS
- 1.
- 2.
- 3.
4.
Unit Name:
R.E. GINNA NUCLEAR POWER PLANT Reporting Period:
March, 2002 Design Electric Rating (Net MWe):
470 Maximum Dependable Capacity (Net MWe):
480 Notes:
Number of hours Reactor Was Critical Hours Generator On-line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 413.1 412.9 0.0 168701.0 Yr.-to-Date 1810.8 1794.1 0.0 848296.1 Cumulative**
232833.0 228319.0 8.5 104333856.9
- CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969
- 5.
- 6.
- 7.
8.
DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: April 10, 2002 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:
March, 2002 (Month/Year)
NO.
DATE TYPE DURATION REASON(1 )
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTTING 5: SCHEDULED DOWN(2)
COMMENTS 2
020318 S
331.1 C
1 Refueling Shutdown to load Fuel Cycle 30
SUMMARY
End of Fuel Cycle 29 coastdown began on February 23, 2002 and continued until March 18, 2002. Power reduction for refueling shutdown began at 0000 on March 18, 2002. The unit was brought off-line at 0456 on March 18, 2002. The shutdown continued through the end of March, 2002.
(1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)