January 2003 Monthly Operating Report for R. E. Ginna Nuclear Power Plant
ML030520217
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/10/2003
From: Widay J
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML030520217 (3)


Text

R Z An Energy East Company ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EAST AVENUE, ROCHESTER, NY 14649-0001 ° 585 546-2700 www rge corn February 10, 2003 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for January 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of January 2003.

Very truly yours, sh A. Widay Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT 50-244 February 10, 2003 COMPLETED BY: //_ 41.__a,_

ý/John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: January, 2003
3. Design Electric Rating (Net MWe): 470
4. Maximum Dependable Capacity (Net MWe): 480 This Month Yr.-to-Date Cumulative**

744.0 744.0 239760.9

5. Number of hours Reactor Was Critical 744.0 744.0 236603.1
6. Hours Generator On-line 0.0 0.0 8.5 *
7. Unit Reserve Shutdown Hours 369156.0 369156.0 107698065.0
8. Net Electrical Energy Generated (MWH)
  • CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: February 10, 2003 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD: January 2003 (Month/Year)

REASONO 1) METHOD OF CAUSE/CORRECTIVE ACTIONS NO. DATE TYPE DURATION F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN(') COMMENTS

____ ____ _________ _______ +/- _______ I ________ ____________________

SUMMARY

The unit operated at full power for the entire month of January Average power for the month of January was 99 8%.

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)