November 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant
ML043630341
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/10/2004
From: Marlow T
Constellation Energy Group, Ginna
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML043630341 (2)


Text

Thomas A. Marlow R.E. Ginna Nuclear Power Plant, LLC Plant General Manager 1503 Lake Road Ontario, NewYork 14519-9364 585.771.3000 Constellation Energy Generation Group December 10, 2004 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate l-1 Washington, DC 20555

Subject:

Monthly Report for November 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of November 2004.

Very truly your,%,

Thomas A. Marlow Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop 0-8-C2)

Project Directorate 1-1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT DOCKET NO. 50-244 UNIT NAME Ginna 1 DATE December 06,2004 COMPLETED BY John V. Walden .

TELEPHONE 585-771-3588 REPORTING PERIC November 2004

1. Design Electrical Rating 470.00
2. Maximum Dependable Capacity (MWe-Net) 480.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 7,994.58 254,992.80
4. Number of Hours Generator On-line 720.00 7,989.53 251,775.23
5. Reserve Shutdown Hours 0.00 0.00 8.50
6. Net Electrical Energy Generated (MWHrs) 358,159.00 3,938,109.80 115,135,610.8 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason I Down 2 Comments

SUMMARY

The unit operated at full power for the entire month of November. Average power for the month was 99.7%.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 1