Text
R-"An Energy East Company ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EAST AVENUE, ROCHESTER, N.Y 14649-0001
- 585 546-2700 www rge corn March 10, 2003 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate I-1 Washington, DC 20555
Subject:
Monthly Report for February 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of February 2003.
Very truly yours, 0
t.)
- h A. Widayýýn Plant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT 50-244 March 10, 2003 COMPLETED BY:
/
John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS
- 1.
- 2.
- 3.
4.
Unit Name:
R.E. GINNA NUCLEAR POWER PLANT Reporting Period:
February, 2003 Design Electric Rating (Net MWe):
470 Maximum Dependable Capacity (Net MWe):
480 Notes:
Number of hours Reactor Was Critical Hours Generator On-line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 672.0 672.0 0.0 333039.0 Yr.-to-Date 1416.0 1416.0 0.0 702195.0 Cumulative**
240432.9 237275.1 8.5
- 108031104.0
- CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969
- 5.
- 6.
- 7.
8.
"1' DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: March 10, 2003 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:
February 2003 (Month/Year)
NO.
DATE TYPE DURATION REASONO 1 )
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTTING
&: SCHEDULED DOWN(2)
COMMENTS The unit operated at full power for the entire month of February. Average power for the month of February was 99 8%
(1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
SUMMARY
-