February 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant
ML030770454
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/10/2003
From: Widay J
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML030770454 (3)


Text

R-"An Energy East Company ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EAST AVENUE, ROCHESTER, N.Y 14649-0001
  • 585 546-2700 www rge corn March 10, 2003 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for February 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of February 2003.

Very truly yours, t.)

  • h0 A. Widayýýn Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT 50-244 March 10, 2003 COMPLETED BY: ,

/ John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: February, 2003
3. Design Electric Rating (Net MWe): 470
4. Maximum Dependable Capacity (Net MWe): 480 This Month Yr.-to-Date Cumulative**
5. Number of hours Reactor Was Critical 672.0 1416.0 240432.9
6. Hours Generator On-line 672.0 1416.0 237275.1
7. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
8. Net Electrical Energy Generated (MWH) 333039.0 702195.0 108031104.0
  • CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969

"1' DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: March 10, 2003 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD: February 2003 (Month/Year)

REASONO 1) METHOD OF CAUSE/CORRECTIVE ACTIONS NO. DATE TYPE DURATION F: FORCED (HOURS) SHUTTING

&:SCHEDULED DOWN(2) COMMENTS

SUMMARY

The unit operated at full power for the entire month of February. Average power for the month of February was 99 8%

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)