October 2002 Monthly Operating Report for R.E. Ginna
ML023190062
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/08/2002
From: Widay J
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML023190062 (3)


Text

6S RZ An Energy East Company ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EASTAVENUE, ROCHESTER, NY 14649-0001
  • 585 546-2700 www rge corn November 8, 2002 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for October, 2002 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuantto Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of October, 2002.

Very truly yours,

ýsh A. Wida'yý Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT 50-244 November 8, 2002 COMPLETED BY:

  • KiiA

/ John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: October, 2002
3. Design Electric Rating (Net MWe): 470
4. Maximum Dependable Capacity (Net MWe): 480 This Month Yr.-to-Date Cumulative**
5. Number of hours Reactor Was Critical 745.0 6530.7 237552.9
6. Hours Generator On-line 745.0 6489.0 234395.1
7. Unit Reserve Shutdown Hours 0.0 0.0 8.5
8. Net Electrical Energy Generated (MWH) 366814.0 3116813.2 106602374.0
  • CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969
    • CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: November 8. 2002 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD: October, 2002 (Month/Year)

DURATION REASONW 1) METHOD OF CAUSE/CORRECTIVE ACTIONS NO. DATE TYPE F: FORCED (HOURS) SHUTTING DOWN(2) COMMENTS S: SCHEDULED II SU IMMARY: The unit operated at full power for the entire month of October. Average power for the month of October was 99 6%.

(2)1Method

- Manual (1) Reason A - Equipment Failure (Explain) 2 - Manual Trip/Scram B - Maintenance or Test 3 - Automatic Trip/Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)

E - Operator Tralning/Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)