ML023190062
| ML023190062 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 11/08/2002 |
| From: | Widay J Rochester Gas & Electric Corp |
| To: | Clark R Document Control Desk, NRC/NRR/DLPM/LPD1 |
| References | |
| Download: ML023190062 (3) | |
Text
6S RZ An Energy East Company ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EASTAVENUE, ROCHESTER, NY 14649-0001
- 585 546-2700 www rge corn November 8, 2002 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate I-1 Washington, DC 20555
Subject:
Monthly Report for October, 2002 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuantto Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of October, 2002.
Very truly yours,
ýsh A. Wida'y ý Plant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT 50-244 November 8, 2002 COMPLETED BY:
KiiA
/
John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS Unit Name:
R.E. GINNA NUCLEAR POWER PLANT Reporting Period:
October, 2002 Design Electric Rating (Net MWe):
470 Maximum Dependable Capacity (Net MWe):
480 Number of hours Reactor Was Critical Hours Generator On-line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 745.0 745.0 0.0 366814.0 Yr.-to-Date 6530.7 6489.0 0.0 3116813.2 Cumulative**
237552.9 234395.1 8.5 106602374.0
- CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969
- CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969 1.
- 2.
- 3.
4.
Notes:
- 5.
- 6.
- 7.
8.
DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: November 8. 2002 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:
October, 2002 (Month/Year)
II SU NO.
DATE TYPE DURATION REASONW1 )
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTTING S: SCHEDULED DOWN(2)
COMMENTS IMMARY:
The unit operated at full power for the entire month of October. Average power for the month of October was 99 6%.
(1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Tralning/Ucense Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)