ML022120369
| ML022120369 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 07/12/2002 |
| From: | Widay J Rochester Gas & Electric Corp |
| To: | Clark R Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML022120369 (3) | |
Text
ROCHESTER GAS AND ELECTRIC CORPORATION - 89 EAST AVENUE ROCHESTER, N Y 14649 0001 AREA CODE 716 546 2700 July 12, 2002 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate I-1 Washington, DC 20555
Subject:
Monthly Report for June, 2002 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of June, 2002.
Very truly yours, hA. Widay*"
\\
Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT 50-244 July 12, 2002 COMPLETED BY:
/
. 0J.
4ohn V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS
- 1.
- 2.
- 3.
4.
Unit Name:
R.E. GINNA NUCLEAR POWER PLANT Reporting Period:
June, 2002 Design Electric Rating (Net MWe):
470 Maximum Dependable Capacity (Net MWe):
480 Notes:
Number of hours Reactor Was Critical Hours Generator On-line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 720.0 720.0 0.0 354859.0 Yr.-to-Date 3577.7 3536.0 0.0 1685314.2 Cumulative**
234599.9 228626.1 8.5 105170875.0
- CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969
- 5.
- 6.
- 7.
8.
DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: July 12, 2002 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:
June, 2002 (Month/Year)
SUMMARY
The unit operated at full power for the entire month of June. Average power for the month of June was 99.6%.
(2) Method (1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain) 1 - Manual 2 -Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 -Other (Explain)
NO.
DATE TYPE DURATION REASONW1 )
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTTING
&: SCHEDULED DOWN(2)
COMMENTS