ML022120369

From kanterella
Jump to navigation Jump to search
June 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant
ML022120369
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/12/2002
From: Widay J
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022120369 (3)


Text

ROCHESTER GAS AND ELECTRIC CORPORATION - 89 EAST AVENUE ROCHESTER, N Y 14649 0001 AREA CODE 716 546 2700 July 12, 2002 US Nuclear Regulatory Commission Document Control Desk Attn:

Robert Clark Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for June, 2002 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of June, 2002.

Very truly yours, hA. Widay*"

\\

Manager xc:

U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT 50-244 July 12, 2002 COMPLETED BY:

/

. 0J.

4ohn V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS

1.
2.
3.

4.

Unit Name:

R.E. GINNA NUCLEAR POWER PLANT Reporting Period:

June, 2002 Design Electric Rating (Net MWe):

470 Maximum Dependable Capacity (Net MWe):

480 Notes:

Number of hours Reactor Was Critical Hours Generator On-line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 720.0 720.0 0.0 354859.0 Yr.-to-Date 3577.7 3536.0 0.0 1685314.2 Cumulative**

234599.9 228626.1 8.5 105170875.0

  • CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969
5.
6.
7.

8.

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: July 12, 2002 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:

June, 2002 (Month/Year)

SUMMARY

The unit operated at full power for the entire month of June. Average power for the month of June was 99.6%.

(2) Method (1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain) 1 - Manual 2 -Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 -Other (Explain)

NO.

DATE TYPE DURATION REASONW1 )

METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)

SHUTTING

&: SCHEDULED DOWN(2)

COMMENTS