ML033500238
| ML033500238 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 12/09/2003 |
| From: | Widay J Rochester Gas & Electric Corp |
| To: | Clark R Document Control Desk, NRC/NRR/DLPM/LPD1 |
| References | |
| Download: ML033500238 (2) | |
Text
Z.'-
R5 An Energy East Company ROCHESTERGASANDELECTRIC CORPORA11ON 89EASTAVENUE, ROCHESTER, 14649-0001
- 585546-2700 ww.rge.om December 9, 2003 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate 1-1 Washington, DC 20555
Subject:
Monthly Report for November 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuantto Ginna ImprovedTechnical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of November 2003.
Very truly yours, a'da.
A. Widay Plant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT DOCKET NO.
50 UNIT NAME Gi DATE COMPLETED BY Jo TELEPHONE
(
REPORTING PERIOD:
-244 nna 1
'cember 08, 2003 hn Walden
- 35) 771-3588 November 2003
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 470.00 480.00
- 3.
Number of Hours the Reactor was Critical
- 4. Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 720.00 720.00 0.00 357,350.00 Yr-to-Date 7,237.32 7,182.60 0.00 3,499,521.00 Cumulative 246,254.22 243,041.70 8.50 110,828,430.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments 1
2 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
SUMMARY
- The unit operated at full power for the entire month of November. Average power for the month was 99.6%.
Page 1 of 1