MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0510903042005-04-0808 April 2005 March 2005 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0508903502005-03-11011 March 2005 February 2005 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0505302232005-02-0909 February 2005 January 2005 Monthly Report for R.E. Ginna Nuclear Power Plant ML0501902012005-01-0707 January 2005 December 2004 Monthly Operating Report for the R.E. Ginna Nuclear Power Plant ML0436303412004-12-10010 December 2004 November 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0432203622004-11-10010 November 2004 October 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0428804842004-10-0808 October 2004 September 2004 Monthly Report for R E Ginna Nuclear Power Plant ML0426600732004-09-10010 September 2004 August 2004 Monthly Report for R.E. Ginna Nuclear Power Plant ML0423105522004-08-10010 August 2004 July 2004 Monthly Operating Report for R E Ginna ML0420803112004-07-0909 July 2004 June 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0417406162004-06-10010 June 2004 May 2004 Monthly Report for R.E. Ginna Nuclear Power Plant ML0413404292004-05-10010 May 2004 April 2004 Monthly Operating Report, R. E. Ginna Nuclear Power Plant ML0411305012004-04-0909 April 2004 March 2004 Monthly Operating Report for Ginna Nuclear Power Plant ML0407607272004-03-0909 March 2004 February 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0404905182004-02-0909 February 2004 January 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0402104802004-01-0909 January 2004 December 2003 Monthly Operating Report for R E Ginna Nuclear Power Plant ML0335002382003-12-0909 December 2003 November 2003 Monthly Operating Report for R.E. Ginna ML0332400652003-11-10010 November 2003 October 2003 Monthly Report for R. E. Ginna Nuclear Power Plant ML0328804542003-10-0909 October 2003 September 2003 Monthly Operating Report for R. E. Ginna ML0326610622003-09-10010 September 2003 August 2003 Monthly Operating Report Ginna Nuclear Power Plant ML0322704182003-08-0707 August 2003 July 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0319804382003-07-10010 July 2003 June 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0316812672003-06-10010 June 2003 May 2003 Monthly Operating Report for R.E. Ginna ML0314006772003-05-0909 May 2003 April 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0314005802003-05-0909 May 2003 September 2001 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0310704452003-04-10010 April 2003 March 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0307704542003-03-10010 March 2003 February 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0305202172003-02-10010 February 2003 January 2003 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0301706072003-01-10010 January 2003 December 2002 Monthly Operating Report for R. E. Ginna ML0235205042002-12-0909 December 2002 November 2002 Monthly Operating Report for R.E. Ginna ML0231900622002-11-0808 November 2002 October 2002 Monthly Operating Report for R.E. Ginna ML0229000102002-10-0909 October 2002 September 2002 Monthly Operating Report for R.E. Ginna ML0226006432002-09-10010 September 2002 August 2002 Monthly Operating Report for R. E. Ginna ML0223102702002-08-0707 August 2002 July 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0221203692002-07-12012 July 2002 June 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0217101442002-06-10010 June 2002 May 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant, Revision ML0215004232002-05-17017 May 2002 April 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0214204182002-05-0606 May 2002 April 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0210904432002-04-10010 April 2002 March 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0208604272002-03-0808 March 2002 February 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0205802142002-02-11011 February 2002 January 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0203504532002-01-10010 January 2002 December 2001 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML18142B3881976-02-0909 February 1976 R. E. Ginna - Forwards Revised (Item #6) Operating Data Report for Month of January 1976 ML18142B3891976-02-0606 February 1976 R. E. Ginna - Forwards Monthly Operating Status Report for Month of January 1976 ML18142B3901976-01-0808 January 1976 R. E. Ginna - Forwards Revised Unit Shutdown and Power Reduction Data Sheet for Monthly Operating Report for December 1975 ML18142B3911976-01-0808 January 1976 R. E. Ginna - Forwards Monthly Operating Status Report for Month of December 1975 ML18142B3921975-12-0404 December 1975 R. E. Ginna - Forwards Monthly Operating Status Report for Month of November 1975 ML18142B3931975-11-0606 November 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of October 1975 ML18142B3941975-10-0202 October 1975 R. E. Ginna - Forwards Operating Status Information for Month of September 1975 ML18142B3951975-09-0505 September 1975 R. E. Ginna - Forwards Operating Status Information for Month of August 1975 2005-04-08
[Table view] |
Text
s MONTHLY REPOI (POR GRAY BOOK PREPARATION)
NRC DISTRIBUTION FOR PART 50 DOCKET'ATERIAL (TEMPO RA R Y FO R M)
CONTROL NO: '54 FILE MONTHLY REPORT FILE
, FROM. Rochester Gas & Elec, Co PDATE OF DOC DATE R EC'D LTR TWX RPT OTHER Rochester, N.Y. 14649 Cha'ries E. Platt 1<<8-76 1-12>>76 TO: ORIG CC OTHER XX NRC 1 si ned 9 SENT LOCAL PDR CLASS UNCLASS PROP INFO . INPUT NO CYS REC'D DOCKET NO:
10 50-244 D ESC R I PTI ON: ENCLOSURES:
Ltr t:rans the following: Monthly Repor t for Dec. 1975 Plant & Component Operability & Availability This Report to be used in preparing Gray Book by Plans & Operations.
NUMBER OF COPIES REC'D: 10 PLANT NAME: R. E. Ginna Pla'nt s
FOR ACTION/INFORMATION DHL 1-13-76 BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)
W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)
W/ Copies W/ Copies W/ Copies W/ Copies PARR (L) VASSALLO (L) KNIGHTON (E),SPE LS W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L) ~PURPLE (L) YOUNGBLOOD (E)~ MIPC/PE W/ Co'pies W/copies W/ Copies W,4 Copies INTERNAL DISTRIBUTION EG Fl TECH REVIEW DENTON LIC ASST A/T IND ~
SCHROEDER G R IMES R. DI GGS (L) BRAITMAN OGC, ROOM P-506A. MACCARY GAMMILL H. GEAR IN (L) SALTZMAN GOSSI CK/STAFF KNIGHT KASTNER E. GOULBOURNE (L) MiE LTZ CASE PAW LI CK I BALLARD P. KREUTZER (E)
GIAMBUSSO SHAO SPANGLER J. LEE (L) PLANS BOYD STELLO M. RUBH3ROOK (L) <<MCDONALD MOORE (L) HOUSTON ENVIRO S. REED (E) <<CHAPMAN DEYOUNG (L) ,NOVAK MULLER M. SERVICE (L) DUBE (Ltr)
SKOVHOLT (L) ROSS DICKER g. SHEPPARD (L) E. COUPE PETERSON GOLLER (L) (Ltr) IPPOLITO KNIGHTON M. SLATER (E)
P. COLLINS TED ESCO YOUNG B LOOD H. SMITH (L) HARTFIELD (2)
DENISE J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR LAINAS PROJECT LDR G. WILLIAMS(E) E ISENHUT Fl I.E 5 REGION (2) BENAROYA V: WILSON (L) WIGGINTON VOLLMER HAR LESS R. INGRAM (L)
STEELE M DUNCA E EXTERNAL DISTRIBUTION
~1 LPPAL PPH~Locs N Y - Ro.ch.ester, N.Y.
~1 TIC (ABERNATHY) (1)(2)('10) NATIONALLABS 1 PD R-SAN/LA/NY W. PENNINGTON, Rrn E-201 GT BROOKHAVEN NAT LAB
~1 NSIC (BUCHANAN) 1 1 G. ULRIKSON, ORNL 1 ASLB 1 CONSULTANTS 1 1 Newton Anderson NEWMARK/8 LUME/AGBABI AN 1 AGMED (RUTH GUSSMAN)
ACRS HOLDING/SENT Rm B-127 GT 1 J ~ D. RUNKLES, Rm E-201 s
GT
4 ~
~ ~
0 regulatory Docket Elle AHD I
ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 Ag 'ELEPHONE AREA cooE TIE 546-2700 cy Ginna Station January 8, 1976
~4NS'Z.mug
@ q Director, Office of Inspection and Enforcement 8 Jy ~~Pjp U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Subject:
Monthly Report for December, 1975 Operating Status Information R. E. Ginna Nuclear Power Plant Unit'No.
Docket No. 50-244 Gentlemen:
Pursuant to Technical Specification 6.9.1c attached herewith is the monthly operating status report for Ginna Station for the month of December, 1975.
Also, ten additional copies of the attachment are enclosed.
Very truly yours, C zP Charles E. Platt Superintendent CEP:fah Attachments cc: Mr. James P. O'Reilly, NRC (1)
Mr. William G. McDonald, NRC (2)
J r.
A4 ~6(egu1atory Docket File OPERATING DATA REPORT DOCKET NO. 50 2~4 UNIT Pl Ginna Station DATE January 6, 1976 g3g4NX%'~.;..
COMPLETED Andgev E. MCNamara, RY~ perat ons
~ TELEPHONE Ext. 291-214, At Ginna OPERATING STATUS
- 1. REPORTING PERIOD: GROSS HOURS IN REPORTING PERIODE 744 1520
- 3. POWER LEVEL To WHICH RESTRICTED (IF AHY) (MWe&et):
4, REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE'.
NUMBER OF HOURS REACTOR WAS CRITICAL .......'.. ..,, ~ 700. 28 6 850.24 41,168.70 6 ~ REACTOR RESERVE SHUTDOWN HOURS. 0 292.13 292.13*
- 7. HOURS GENERATOR OH LINE. ~ 700.25 6 710.5 39,912.63
- 8. UNIT RESERVE SHUTDOWN HOURS 0 8.5 8.5*
- 9. GROSS THERMAL RHERGY GEHERATED IMWH)........,.....1~036 2 6 9 706 555 50 370,874
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 3,199,043 16,805,861
- 11. HET ELECTRICAL ENERGY GEHERATED (MWH).... 28,548 3,041,203 15,892,3)5
- 12. REACTOR SERVICE FACTOR... ~... 0 78.19% 76.45%
- 13. REACTOR AYAII.ABILITYFACTOR ........ ~ . ~ 94.12% 81.53% 77.0%
- 14. UNIT SERVICE FACTOR.
1$ . UNIT AVAILABILITYFACTOR ~
- 16. UNIT CAPACITY FACTOR (Uelne MDC)
. ~ ~ . ~ ~
A
~
~
~
~ ~ 7
~
~
~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ A
~~9~
94.1%
~1~3 ~
76.6%
76.7%
73.9%
74.68%
74.69%
67.32%
17 UNIT CAPACITY FACTOR (UEIn0 DeeIgn MWe) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ p ~ 67.32%
- 18. UNIT FORCED OUTAGE RATE 8.9%
- 19. SHUTDOWNS SCHEDULED OYER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH);
'0. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPE January 7, 1976
- 21. UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
- Cumulative data commencing January 1, 1975.
40 88 RRVA 10/75
t wo l
lt 4
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.. 50 244 UNIT III @irma Station Ja ua . 1 76 COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE Rxt.291-214, At Ginna December, 1975 MONTH DAY AVERAGE DAILYPOWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (MWe-N et) (MWe-Net) 482 480 11 481 18 480 480 480 480 479 20 481 370 21 477 22 23 351 480 479 24 480 25 10 479 26 482 480 482 21 482 12 28 475 13 434 2$
479 55 14 30 15 31 16 INSTRUCTIONS On this form, list the average daily unit power level in MWe&et for each.day iri the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month..Note that when maximum depend-able capacity.'is used for the net electrical rating of the unit, there may,',be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.
4
s k
iI N ~
DOCKET NO. 50-244 The reactor power levels averaged GINNA STATI UNIT NAME ONE UNIT 01 99% during the period. The major DATE January 6, 1976 exceptions were the power reduc-tions and Outage II14 detailed COMPLETED E. McNamara, Operations BY~~'ndrew Ai e below. TELEPH0NE 1-716-546-2700 Ext. 291-214, at Ginna REpoRT MQNTH December 1 75 UNIT SHUTDOWN AND POWER REDUCTIONS METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION CORRECTIVE ACTIONS/COMMENTS THE REACTOR OR DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2)
P
/AA 75 12 13 Reactor power level reduction to ~ 47% to perform T-18B, Turbine Main Steam Stop Valves Test.
N/AA 75 12 21 Reactor power level reduction to m47% to perform M-54.2, check condenser 1B-1 water box for leaks, with Freon.
/AA 75 12 23 Reactor power level reduction to~47% to perform M-54.2, check condenser 1B-1 water box for leaks, with Freon.
14 75 12 30 43.75 A "B" Steam Generator Tube Leak (See Note)
NOTE: Uni.t remained shutdown through the end of report month.
(I) REASON: (2) METHOD:
A - EQUIPMENT FAILURE (EXPLAIN) I - MANUAL 8 - MAINT. OR TEST 2 - MANUAL SCRAM C - REFUELING 3 - AUTOMATIC SCRAM D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
E - OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
- Power reductions were not previously reported. DataaaMt>aw~ilabM.89 Commencing January 1, 1976, this data will be reported.
t'lr 4
'a