R. E. Ginna - Forwards Monthly Operating Status Report for Month of December 1975
ML18142B391
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/08/1976
From: Platt C
Rochester Gas & Electric Corp
To:
NRC/IE
References
Download: ML18142B391 (10)


Text

s MONTHLY REPOI (POR GRAY BOOK PREPARATION)

NRC DISTRIBUTION FOR PART 50 DOCKET'ATERIAL (TEMPO RA R Y FO R M)

CONTROL NO: '54 FILE MONTHLY REPORT FILE

, FROM. Rochester Gas & Elec, Co PDATE OF DOC DATE R EC'D LTR TWX RPT OTHER Rochester, N.Y. 14649 Cha'ries E. Platt 1<<8-76 1-12>>76 TO: ORIG CC OTHER XX NRC 1 si ned 9 SENT LOCAL PDR CLASS UNCLASS PROP INFO . INPUT NO CYS REC'D DOCKET NO:

10 50-244 D ESC R I PTI ON: ENCLOSURES:

Ltr t:rans the following: Monthly Repor t for Dec. 1975 Plant & Component Operability & Availability This Report to be used in preparing Gray Book by Plans & Operations.

NUMBER OF COPIES REC'D: 10 PLANT NAME: R. E. Ginna Pla'nt s

FOR ACTION/INFORMATION DHL 1-13-76 BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)

W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)

W/ Copies W/ Copies W/ Copies W/ Copies PARR (L) VASSALLO (L) KNIGHTON (E),SPE LS W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L) ~PURPLE (L) YOUNGBLOOD (E)~ MIPC/PE W/ Co'pies W/copies W/ Copies W,4 Copies INTERNAL DISTRIBUTION EG Fl TECH REVIEW DENTON LIC ASST A/T IND ~

SCHROEDER G R IMES R. DI GGS (L) BRAITMAN OGC, ROOM P-506A. MACCARY GAMMILL H. GEAR IN (L) SALTZMAN GOSSI CK/STAFF KNIGHT KASTNER E. GOULBOURNE (L) MiE LTZ CASE PAW LI CK I BALLARD P. KREUTZER (E)

GIAMBUSSO SHAO SPANGLER J. LEE (L) PLANS BOYD STELLO M. RUBH3ROOK (L) <<MCDONALD MOORE (L) HOUSTON ENVIRO S. REED (E) <<CHAPMAN DEYOUNG (L) ,NOVAK MULLER M. SERVICE (L) DUBE (Ltr)

SKOVHOLT (L) ROSS DICKER g. SHEPPARD (L) E. COUPE PETERSON GOLLER (L) (Ltr) IPPOLITO KNIGHTON M. SLATER (E)

P. COLLINS TED ESCO YOUNG B LOOD H. SMITH (L) HARTFIELD (2)

DENISE J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR LAINAS PROJECT LDR G. WILLIAMS(E) E ISENHUT Fl I.E 5 REGION (2) BENAROYA V: WILSON (L) WIGGINTON VOLLMER HAR LESS R. INGRAM (L)

STEELE M DUNCA E EXTERNAL DISTRIBUTION

~1 LPPAL PPH~Locs N Y - Ro.ch.ester, N.Y.

~1 TIC (ABERNATHY) (1)(2)('10) NATIONALLABS 1 PD R-SAN/LA/NY W. PENNINGTON, Rrn E-201 GT BROOKHAVEN NAT LAB

~1 NSIC (BUCHANAN) 1 1 G. ULRIKSON, ORNL 1 ASLB 1 CONSULTANTS 1 1 Newton Anderson NEWMARK/8 LUME/AGBABI AN 1 AGMED (RUTH GUSSMAN)

ACRS HOLDING/SENT Rm B-127 GT 1 J ~ D. RUNKLES, Rm E-201 s

GT

4 ~

~ ~

0 regulatory Docket Elle AHD I

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 Ag 'ELEPHONE AREA cooE TIE 546-2700 cy Ginna Station January 8, 1976

~4NS'Z.mug

@ q Director, Office of Inspection and Enforcement 8 Jy ~~Pjp U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Monthly Report for December, 1975 Operating Status Information R. E. Ginna Nuclear Power Plant Unit'No.

Docket No. 50-244 Gentlemen:

Pursuant to Technical Specification 6.9.1c attached herewith is the monthly operating status report for Ginna Station for the month of December, 1975.

Also, ten additional copies of the attachment are enclosed.

Very truly yours, C zP Charles E. Platt Superintendent CEP:fah Attachments cc: Mr. James P. O'Reilly, NRC (1)

Mr. William G. McDonald, NRC (2)

J r.

A4 ~6(egu1atory Docket File OPERATING DATA REPORT DOCKET NO. 50 2~4 UNIT Pl Ginna Station DATE January 6, 1976 g3g4NX%'~.;..

COMPLETED Andgev E. MCNamara, RY~ perat ons

~ TELEPHONE Ext. 291-214, At Ginna OPERATING STATUS

1. REPORTING PERIOD: GROSS HOURS IN REPORTING PERIODE 744 1520
3. POWER LEVEL To WHICH RESTRICTED (IF AHY) (MWe&et):

4, REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE'.

NUMBER OF HOURS REACTOR WAS CRITICAL .......'.. ..,, ~ 700. 28 6 850.24 41,168.70 6 ~ REACTOR RESERVE SHUTDOWN HOURS. 0 292.13 292.13*

7. HOURS GENERATOR OH LINE. ~ 700.25 6 710.5 39,912.63
8. UNIT RESERVE SHUTDOWN HOURS 0 8.5 8.5*
9. GROSS THERMAL RHERGY GEHERATED IMWH)........,.....1~036 2 6 9 706 555 50 370,874
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 3,199,043 16,805,861
11. HET ELECTRICAL ENERGY GEHERATED (MWH).... 28,548 3,041,203 15,892,3)5
12. REACTOR SERVICE FACTOR... ~... 0 78.19% 76.45%
13. REACTOR AYAII.ABILITYFACTOR ........ ~ . ~ 94.12% 81.53% 77.0%
14. UNIT SERVICE FACTOR.

1$ . UNIT AVAILABILITYFACTOR ~

16. UNIT CAPACITY FACTOR (Uelne MDC)

. ~ ~ . ~ ~

A

~

~

~

~ ~ 7

~

~

~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ A

~~9~

94.1%

~1~3 ~

76.6%

76.7%

73.9%

74.68%

74.69%

67.32%

17 UNIT CAPACITY FACTOR (UEIn0 DeeIgn MWe) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ p ~ 67.32%

18. UNIT FORCED OUTAGE RATE 8.9%
19. SHUTDOWNS SCHEDULED OYER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH);

'0. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPE January 7, 1976

21. UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
  • Cumulative data commencing January 1, 1975.

40 88 RRVA 10/75

t wo l

lt 4

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.. 50 244 UNIT III @irma Station Ja ua . 1 76 COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE Rxt.291-214, At Ginna December, 1975 MONTH DAY AVERAGE DAILYPOWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (MWe-N et) (MWe-Net) 482 480 11 481 18 480 480 480 480 479 20 481 370 21 477 22 23 351 480 479 24 480 25 10 479 26 482 480 482 21 482 12 28 475 13 434 2$

479 55 14 30 15 31 16 INSTRUCTIONS On this form, list the average daily unit power level in MWe&et for each.day iri the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month..Note that when maximum depend-able capacity.'is used for the net electrical rating of the unit, there may,',be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.

4

s k

iI N ~

DOCKET NO. 50-244 The reactor power levels averaged GINNA STATI UNIT NAME ONE UNIT 01 99% during the period. The major DATE January 6, 1976 exceptions were the power reduc-tions and Outage II14 detailed COMPLETED E. McNamara, Operations BY~~'ndrew Ai e below. TELEPH0NE 1-716-546-2700 Ext. 291-214, at Ginna REpoRT MQNTH December 1 75 UNIT SHUTDOWN AND POWER REDUCTIONS METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION CORRECTIVE ACTIONS/COMMENTS THE REACTOR OR DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2)

P

/AA 75 12 13 Reactor power level reduction to ~ 47% to perform T-18B, Turbine Main Steam Stop Valves Test.

N/AA 75 12 21 Reactor power level reduction to m47% to perform M-54.2, check condenser 1B-1 water box for leaks, with Freon.

/AA 75 12 23 Reactor power level reduction to~47% to perform M-54.2, check condenser 1B-1 water box for leaks, with Freon.

14 75 12 30 43.75 A "B" Steam Generator Tube Leak (See Note)

NOTE: Uni.t remained shutdown through the end of report month.

(I) REASON: (2) METHOD:

A - EQUIPMENT FAILURE (EXPLAIN) I - MANUAL 8 - MAINT. OR TEST 2 - MANUAL SCRAM C - REFUELING 3 - AUTOMATIC SCRAM D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

E - OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

  • Power reductions were not previously reported. DataaaMt>aw~ilabM.89 Commencing January 1, 1976, this data will be reported.