ML020350453
| ML020350453 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 01/10/2002 |
| From: | Widay J Rochester Gas & Electric Corp |
| To: | Document Control Desk, NRC/NRR/DLPM/LPD1 |
| References | |
| Download: ML020350453 (3) | |
Text
ROCHESTER GAS AND ELECTRIC CORPORATION & 89 EAST AVENUE, ROCHESTER, N. Y 74649-0001 AREA CODE 716 546-2700 January 10, 2002 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate I-1 Washington, DC 20555
Subject:
Monthly Report for December, 2001 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of December, 2001.
Very truly yours, se A. Widay Plant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT 50-244 January 10, 2002 COMPLETED BY:
/John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS
- 1.
- 2.
- 3.
4.
Unit Name:
R.E. GINNA NUCLEAR POWER PLANT Reporting Period:
December, 2001 Design Electric Rating (Net MWe):
470 Maximum Dependable Capacity (Net MWe):
480 Notes:
Number of hours Reactor Was Critical Hours Generator On-line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 744.0 744.0 0.0 369246.0 Yr.-to-Date 8760.0 8760.0 0.0 4286279.0 Cumulative**
231022.2 227906.1 8.5 103485560.8
- CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969
- 5.
- 6.
- 7.
8.
DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: January 10, 2002 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD:
December, 2001 (Month/Year)
NO.
DATE TYPE DURATION REASON(1)
METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTTING 5: SCHEDULED DOWN(2)
COMMENTS
SUMMARY
The unit operated at full power for the entire month of December. Average power for the month of December was 99.8%.
(1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)