August 2003 Monthly Operating Report Ginna Nuclear Power Plant
ML032661062
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/10/2003
From: Widay J
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML032661062 (3)


Text

R~1{~ An Energy East Company ROCHESTERGASANDElECTRICCORPOPAT1ON

  • 89EASTAVENUEROCHaESTERNY 14649-0001- 585546-2700 wwwrge.com September 10, 2003 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate 1-1 Washington, DC 20555

Subject:

Monthly Report for August 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of August 2003. A challenge to the pressurizer power operated relief valves is documented In this report.

Very truly yours, 66~ . VWda ant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

t. ! . '

OPERATING DATA REPORT 50-244 September 10, 2003 COMPLETED BY: fA_

John V. Walden TELEPHONE (585) 771-3588 OPERATING STATUS

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: August, 2003
3. Design Electric Rating (Net MWe): 470
4. Maximum Dependable Capacity (Net MWe): 480 This Month Yr.-to-Date Cumulative*
5. Number of hours Reactor Was Critical 677.0 5764.0 244780.9
6. Hours Generator On-line 667.6 5743.7 241602.8
7. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
8. Net Electrical Energy Generated (MWH) 317416.9 2822500.3 110151409.3
  • CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969

Al DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: September 10. 2003 COMPLETED BY: John V. Walden TELEPHONE: (585) 771-3588 UNIT SHUTDOWN REPORTING PERIOD: August 2003 (Month/Year)

NO. DATE TYPE DURATION REASON') METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S.: SCHEDULED DOWN(2) COMMENTS 2 030814 F 71.3 H 3 Grid instability

-'Lw 3 030817 F 5.1 2 High condenser backpressure 1-

SUMMARY

The unit operated at fun power from the beginning of the month until August 14, 2003 at 1611. Voltage and current fluctuations on the grid caused an automatic reactor scram on over temperature delta T and an automatic turbine trip. Pressurizer PORVs actuated on high pressure shorty after the reactor trip and Is reported here as directed by Technical Specifications. An unusual event was declared due to loss of offsite power circuits for onger than 15 minutes. The reactor was made critical on August 17, 2003 at 1111. The turbinewas brought on-line on August 17, 2003 at 1532, but was tripped three minutes later, at 1535, due to high condenser backpressure. The turbine was placed on-line again at 2038 on.August 17, 2003 followIng a reconfiguration of the condensate system to enhance condenser vacuum. The unit reached full power on August 18, 2003 at 2140 and operated there for the emander of the month.

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4- Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G Operational Error (Explain)

H - Other (Explain)