Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owners Activity Report
ML23235A172
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/23/2023
From: Blankenship J
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
Download: ML23235A172 (1)


Text

Constellation August 23, 2023 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 RE. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 James D. Blankenship Site Vice President R.E. G1nna Nuclear Power Plant 1503 Lake Rd.

Ontario. NY 14519 315-791-5205 Office Iarnes.blankenshIp<aconstellat,oi1 com www constellation.com

Subject:

Transmittal of 2023 Owner's Activity Report for the R. E. Ginna Nuclear Power Plant Enclosed is a copy of the R. E. Ginna Nuclear Power Plant Owner's Activity Report for the refueling outage conducted in 2023. This report is submitted as specified by ASME Code Section XI.

There are no regulatory commitments contained in this letter.

If you have any questions, please contact Justin Knowles at (315) 791-3393.

Respectfully, f-f-J+t/JJ James D. Blankenship : SIXTH INSERVICE INSPECTION (ISi) INTERVAL and THIRD CONTAINMENT INSPECTION INTERVAL (GISI), SECOND INSPECTION PERIOD (ISi AND GISI); 2023 OWNER'S ACTIVITY REPORT for RFO-44 INSERVICE EXAMINATIONS (April 10, 2023 through May 1, 2023) cc:

NRC Regional Administrator, Region 1 NRC Project Manager, Ginna NRC Resident Inspector, Ginna

ATTACHMENT 1 SIXTH INSERVICE INSPECTION (ISi) INTERVAL AND THIRD CONTAINMENT INSPECTION INTERVAL (CISI),

SECOND INSPECTION PERIOD (ISi AND CISI);

2023 OWNER'S ACTIVITY REPORT FOR RFO-44 INSERVICE EXAMINATIONS (April 10, 2023 through May 1, 2023)

RE. Ginna Nuclear Power Plant, LLC August 23, 2023

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number ____

.,G<!l'"R..,_44.,_ _________________________________________ _

Plant R.E. G1nna Nuclear Power.P.Lil.nt...1503 Lake Road, Ontario New York 14519 Unit No.-----~--------- Commercial service date ___

Ju_n_e_l~l_9_?_0 _____ Refueling outage no. __

.,,G"'l"'R..,_44..,_ __

M apollcablel Applicable inspection interval __

~S~ixt~h'-J'-n~spect=~io'-n-'I~nt~*~rv=al~(~IS~l~),_T--'h1~rd=In~spect=~IO~n_I~n~te~rv~a~I <~C~IS~l~l,~[S~ta~rtl~ng~ld~n~u*~ry~l~, =20=2~0~) ____________ _

(1st, 2nd, 3rd, 4th, other)

Applicable inspection period __

_,Sec="ond="In"s"'pect=-"io"n..,_Pe=ri"od"->'(I-"Sc:.I-=a'-'nd=--=Cc:clS"'I"-)~[S"'t=a-'rt~in~g~J-=a'-nu~a~ry~l"', -=20~2"'3~) _________________ _

(1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans ----'-A=S'-M=E-=S'-'ect=10'-'n=XI,._2"'0""1'-'3'-'E"'d"1t""1o"n'-(,._,6'-'-="l"n"'te"-rva=I),_ ________ _

Date and revision of inspection plans ___

J_u~l _2_1~2_0_2J~R_e_v_is_io_n_l ____________________________ _

Edition and Addenda of Section XI applicable to repair/replacement activities. 1f different than the inspection plans ASME Section XI 2013 Edition (6 "'Interval)

Code Cases used for inspection and evaluation: --'-'N-..,7-=0-=6'-'-'-N-'-7_.,I-=6...c-l=N'---'-72"'2=-*-=1._N'-'-'-7-"2"'9-'*6"-'-N'--7-'3"'1"-'-N'-*'-77-'0'--*-=s-----------------

lif applicab e)

Remarks ____

..,_N,,o"'n,,,e ___________ _ __ _______________________________ _

CERTIFICATE OF CONFORMANCE I certify that la) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of _____

G_l_R_44 ________ conform to the requirements of the AS I.

(refuehng outage number}

Signed Fleet Asset Mana ement Date 08/16/2023 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Stt!am Boiler I11sp(."Ct1on and lr.sura'lce Company of _____

H_a_rtl_o~*d_. __

CT ___________ _

have inspected the items described in this Owner's Activity Report and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluations described in this report. Furthermore, neither the Inspector nor his ernployer shall be liable many manner for any personal rty dama Commission --------~1-'5-'2_7_7_A_l,'-I-'-, _N-e**~R _______________ _

(Natiopal Board Number and EndorsemenH Data_,_Q-L~-"'-,1-/t-'-'7 /'-=2P'-'-=Z3=--

(07/21)

1 2

FORM OAR-1 OWNER'S ACTIVITY REPORT (Cont'd)

Table 1 Items With Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category Item and Flaw or Relevant and Item Number None Code Class Condition Description Table 2 Abstract of Repair/Replacement Activities Required for Continued Service Item Description Date Description of Work Completed Steam Generator "B" Install mechanical tube plugs 04/24/2023 RHR Valve 712A Install replacement valve by welding 04/24/2023 Evaluation Description Repair/Replacement Plan Number C93690146 C93851228 Note: The certification documented on this OAR-1 Form excludes repair/ replacement activities performed in accordance with the Work Orders identified below.

/07/1~1 IR 04696007 -WO C93909032 (incomplete documentation)

IR 04696016 - WO C93819930 (incomplete documentation)

IR 04696018 - WO C93827042 (incomplete documentation)

IR 04696020 - WO C93851228 (incomplete documentation)

IR 04696489 - WO C93909068 (incomplete documentation)

IR 04696491 - WO C93909638 (incomplete documentation)

IR 04696492 - WO C93811781 (incomplete documentation)