May 13, 2024

David P. Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: R.E. GINNA NUCLEAR POWER PLANT - REQUEST FOR INFORMATION

FOR A BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION

INSPECTION; INSPECTION REPORT 05000244/202 4010

Dear David Rhoades:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region I staff will conduct a biennial problem identification and resolution inspection at

R.E. Ginna Nuclear Power Plant. Elise Eve, a Senior Project Engineer from the NRCs Region I

office, will lead the inspection team. The inspection will be conducted in accordance with

Inspection Procedure 71152, Problem Identification and Resolution, dated October 31, 2023

(ADAMS Accession No. ML23214A284).

The inspection will assess the effectiveness of your problem identification and resolution (PI&R)

program in identifying, prioritizing, evaluating, and correcting problems, including the use of

operating experience, assessments, and audits. This inspection will also assess your program

for raising concerns under the established safety conscious work environment.

The onsite inspection is scheduled for the weeks of July 15 and July 29, 2024.

In order to minimize the inspection impact on the site and to ensure a productive inspection for

both parties, we have enclosed a request for information needed for the inspection. It is

important that all of these documents are up- to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector by June 28, 2024.

If there are any questions about the inspection or the material requested in the enclosure,

please contact the lead inspector at ( 610) 337-5 266 or via email at elise.eve@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget Control Number.

D. Rhoades 2

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading- rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations , Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

Erin E. Carfang, Chief

Projects Branch 1

Division of Operating Reactor Safety

Docket No. 05000244

License No. DPR- 18

Enclosure:

Request for Information for Biennial

Problem Identification and Resolution

Cc w/encl: Distribution via ListServ

D. Rhoades 3

SUBJECT: R.E. GINNA NUCLEAR POWER PLANT - REQUEST FOR INFORMATION

FOR A BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION

INSPECTION; INSPECTION REPORT 05000244/2024010 DATED

MAY 13, 2024

DISTRIBUTION:

ECarfang, DORS

EEve, DORS

KSmetana, DORS

JSchussler, DORS, SRI

CSwisher, DORS, RI

ACass, DORS, AA

FGaskins, RI OEDO

RidsNrrPMREGinna Resource

RidsNrrDorlLpl1 Resource

DOCUMENT NAME: https://usnrc.sharepoint.com/teams/Region-I- Branch- 1/Shared Documents/Inspection

Reports/GN/Ginna 2024/Ginna 2024 PIR Document Request.docx

ADAMS ACCESSION NUMBER: ML24134A004

x SUNSI Review x Non-Sensitive x Publvlle

Sensitive n -Publiclyvlable

OFFICE / /

ME EEve ECfang

TE 10/2024 10/2024

OFFIAL RERD CO

REQUEST FOR INFORMATION

BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION

Inspection Report: 05000244/202 4010

Onsite Inspection Dates: July 15 through July 19, 2024; and

July 29 through August 1 , 2024

Inspection Procedure: 71152, Problem Identification and Resolution,

dated October 31, 2023

Lead Inspector: Elise Eve, Senior Project Engineer

(610) 337- 5266

elise.eve@nrc.gov

The following information is requested by June 28, 2024 or sooner, to facilitate inspection

preparation. The requested information is for the period from August 13, 2022 through June

28, 2024, which covers the timeframe since the previous problem identification and resolution

(PI&R) inspection. The inspection procedure also specifies a five- year review for a subset of

selected program, system, or component issues. The selected samples for this

five-year review will be provided at a future date.

Feel free to contact the lead inspector as soon as possible if you have any questions regarding

this information request. Please provide the information electronically in pdf files, Excel, or

other searchable formats, preferably on an internet database system (e.g., OneDrive). The files

should contain descriptive names, be indexed, and hyperlinked to facilitate ease of use.

Information in lists should contain enough information to be easily understood by someone

who has knowledge of light water reactor technology.

I. General

1. Organization charts, phone list, and list of system engineers

2. List of system numbers/designations and a list of system engineers assigned to those

systems.

3. Access to a hardcopy set of system prints (P&IDs) and operator training manuals for the

team room. These will be returned at the end of the inspection.

4. Technical Requirements Manual (TRM) including the bases.

5. Copy of the Quality Assurance Manual and Quality Assurance Topical Report.

6. A schedule of the date/time/location of meetings associated with implementation of the

correction action program such as Plan- of-the-Day, Station Ownership Committee

(SOC), Management Review Committee (MRC), etc.

7. PRA risk-ranking of systems, including a chart with highest risk systems/components.

II. Corrective Actions

1. Copy of procedures related to the corrective action program, including issue

identification, cause evaluations, corrective actions, trending, self-assessments, audits,

operability determinations, work management, operating experience, etc.

Enclosure

REQUEST FOR INFORMATION

BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION

2. List of all corrective action program deficiency reports (IRs, ARs, etc.) initiated after

August 12, 2022 (last PI&R inspection) - in electronic spreadsheet format - include the

following (as applicable): system number/designation, date initiated, significance level,

status (open or closed), title/short description, department, date closed or due, and if

possible, the number of due date extensions.

3. List of corrective action reports initiated after August 12, 2022, closed to work orders.

4. List of issues determined to be non-corrective action program (NCAP) initiated after

August 12, 2022.

5. Separate list of all corrective action program documents (IRs, ARs, etc.) initiated before

August 12, 2022 ( last PI&R inspection) that remain open - in electronic spreadsheet

format - include the following (as applicable): system number/designation, date initiated,

significance level, status (open or closed), title/short description, department, date

closed or due, and if possible, the number of due date extensions.

6. List of all root cause evaluations (RCE), apparent cause evaluations (ACE), common

cause evaluations (CCE), and work group evaluations (WGE), performed after

August 12, 2022 ( last PI&R inspection) - include number, title, eval type, and date

completed.

7. Matrix of the total number of condition report IRs generated annually and monthly for all

of 2022 and 2023 , and to date for 2024 by department.

8. For all n on- cited violations (NCVs) and findings (FIN) issued since August 12, 2022 (last

PI&R inspection) - provide copies of the associated IRs including all supporting

information such as closeout documentation.

9. For all licensee event reports (LERs) issued since August 12, 2022 (last PI&R

inspection) - provide copies of the associated IRs including all supporting information

such as closeout documentation.

10. List of open temporary modifications, operability determinations, control room

deficiencies and operator workarounds\\challenges, and adverse condition monitoring

plans - in electronic spreadsheet format - include tracking no., system id., title/short

description, date initiated, and date corrective action(s) due / work order(s) scheduled.

11. List of rework and repeat maintenance items, and a list of maintenance performance

metrics including the backlog of corrective and elective maintenance issues - include

tracking no., unit/system id, work order no., title/short description, date initiated, date

corrective action(s) due / work order(s) scheduled, and department.

12. Copies of the system health reports for all (a)(1) systems and all systems pending

maintenance rule expert panel review for (a)(1) status determination.

13. List of all maintenance rule systems, include risk significance of system (high or low) and

whether the system is considered an (a)(1) or (a)(2). The list should indicate the trend in

overall system performance since the last PI&R inspection. For all (a)(1) systems,

please include a copy of the Action Plan and expert panel minutes.

III. Operating Experience

1. List of operating experience reviews, including Part 21s and NRC generic

communications (i.e., Information Notices, Generic Letters, Bulletins) initiated since the

last PI&R inspection. Provide tracking number, title/short description, date initiated, date

2

REQUEST FOR INFORMATION

BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION

due or closer, significance level, evaluation class/type, status, department, and, if

possible, the number of due date extensions.

2. List of industry operating experience issues (NSSS vendor reports, EPRI Reports, and

OPEX reports from other facilities) entered into the corrective action program for review

since the last PI&R Inspection. Provide tracking number, title/short description, date

initiated, date due or closed , significance level, evaluation class/type, status,

department, and, if possible, the number of due date extensions.

3. Provide list of correction action program tracking items generated as a result of issues

identified during the OE reviews and assessment. Provide tracking number, title/short

description, date initiated, date due or closer, significance level, evaluation class/type,

status, department, and, if possible, the number of due date extensions.

IV. Audits and Assessments

1. Copy of all QA reviews (audits, assessments, etc.) and self-assessments of the

corrective action program performed since the last PI&R inspection.

2. List of all QA reviews , self-assessments and safety culture reviews since last PI&R

inspection.

3. Copy of the corrective action program trend reports and performance indicators used by

management since the last PI&R inspection.

4. A list of IRs generated as a result of identified trends (either by station or department)

initiated since the last PI&R inspection. Provide IR number, title, and open/closed

status.

5. List of reports or specific issues identified by safety review committees (such as PORC,

NSRB, etc.) or other management oversight mechanisms since the last PI&R inspection.

Indicate whether these items are being tracked in the corrective action program or other

means.

6. Most recent PI&R functional area self-assessment (FASA) that was performed in

preparation for the upcoming PI&R inspection.

7. Hard-copy of last completed INPO evaluation and assistance report. (Will be reviewed

onsite to maintain confidentiality)

V. Safety Conscious Work Environment and ECP

1. Procedures related to the Employee Concerns Program (ECP).

2. Procedures related to the Safety Conscious Work Environment and the stations

management of related issues.

3. Access to a list of all ECP cases and contacts initiated since the last PI&R inspection.

Include a list of IRs generated as a result of these reviews. (Will be reviewed onsite to

maintain confidentiality)

4. A copy of all safety culture reviews (audits, assessments, surveys, trend review, etc.)

initiated since the last PI&R inspection. Include a list of any IRs, ARs, etc. generated as

a result of these reviews. (Will be reviewed onsite to maintain confidentiality)