September 2001 Monthly Operating Report for R.E. Ginna Nuclear Power Plant
ML031400580
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/09/2003
From: Widay J
Rochester Gas & Electric Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML031400580 (4)


Text

R ~ An Energy East Company ROCHESTER GASAND ELECTRIC CORPORATION 89 EASTAVENUE, ROCHESTER, N.Y 14649-0001 585 546-2700 www.rge.com May 9, 2003 US Nuclear Regulatory Commission Document Control Desk Attn:

Jim McKnight Washington, DC 20555

Subject:

Retransmittal of Monthly Report for September 2001 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. McKnight:

The monthly operating report for September 2001 is missing from the NRC ADAMS database. The retransmittal of the missing information should allow for the ADAMS database to be updated.

VgVy ruly yours, Joseph A. Widay Plant Manager xc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments X,94~~~~~

ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EASTAVENUE, ROCHESFER, N.Y 14649-X010 AREA CODE716546-2700 October 9, 2001 US Nuclear Regulatory Commission Document Control Desk Attn:

Robert Clark Project Directorate -1 Washington, DC 20555

Subject:

Monthly Report for September, 2001 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuantto Ginna ImprovedTechnical Specifications Section 5.6.4, attached is the monthlyoperating status report for Ginna Station for the month of September, 2001.

Very truly yours, h A. Widay lant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT 50-244 October 9, 2001 COMPLETED BY: __ __ _____

(/John V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS

1. Unit Name:

R.E. GINNA NUCLEAR

2. Reporting Period:

September, 2001

3. Design Electric Rating (Net MWe):
4. Maximum Dependable Capacity (Net MWe):

POWER PLANT 470 480 -

This Month Yr.-to-Date Cumulative**

5. Number of hours Reactor Was Critical
6. Hours Generator On-line
7. Unit Reserve Shutdown Hours
8. Net Electrical Energy Generated (MWH) 720.0 720.0 0.0 348933.0 6551.0 6551.0 0.0 3193712.0 228813.2 225697.1 8.5
  • 102392993.8
    • CUMULATIVE TOTAL COMMENCING NOVEMBER 8,1969 Notes:

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: October 9, 2001 COMPLETED BY: John V. Walden TELEPHONE: (716) 771-3588 l

i I

UNIT SHUTDOWN REPORTING PERIOD:

SeDtember. 2001 (MonthNear)

SUMMARY

The unit operated at full power for the entire month of September. Average power for the month of September was 99.8%.

(1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

NO.

DATE TYPE DURATION REASON(')

METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)

M SHUTTING l

S: SCHEDULED DOWN(2)

COMMENTS